Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Spotlight

Environmental Standard Review Plan: StandardReview Plans for Environmental Reviews for Nuclear Power Plants — Environmental Impacts of Station Operation (NUREG-1555, Chapter 5)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
5.0 Environmental Impacts of Station Operation Rev. 0 03/2000
5.1 Land-Use Impacts Rev. 0 03/2000
5.1.1 The Site and Vicinity Rev. 0 03/2000
5.1.2 Transmission Corridors and Offsite Areas Draft Rev. 1 07/2007
Rev. 0 03/2000
5.1.3 Historic Properties Rev. 0 03/2000
5.2 Water-Related Impacts Rev. 0 03/2000
5.2.1 Hydrologic Alterations Rev. 0 03/2000
5.2.2 Water-Related Impacts Rev. 0 03/2000
5.3 Cooling System Impacts Rev. 0 03/2000
5.3.1 Intake System Rev. 0 03/2000
5.3.1.1 Hydrodynamic Descriptions and Physical Impacts Draft Rev. 1 07/2007
Rev. 0 03/2000
5.3.1.2 Aquatic Ecosystems Draft Rev. 1 07/2007
Rev. 0 03/2000
5.3.2 Discharge System Rev. 0 03/2000
5.3.2.1 Thermal Description and Physical Impacts Rev. 0 03/2000
5.3.2.2 Aquatic Ecosystems Rev. 0 03/2000
5.3.3 Heat-Discharge System Rev. 0 03/2000
5.3.3.1 Heat Dissipation to the Atmosphere Rev. 0 03/2000
5.3.3.2 Terrestrial Ecosystems Rev. 0 03/2000
5.3.4 Impacts to Members of the Public Draft Rev. 1 07/2007
Rev. 0 03/2000
5.4 Radiological Impacts of Normal Operation Rev. 0 03/2000
5.4.1 Exposure Pathways Rev. 0 03/2000
5.4.2 Radiation Doses to Members of the Public Rev. 0 03/2000
5.4.3 Impacts to Members of the Public Rev. 0 03/2000
5.4.4 Impacts to Biota Other than Members of the Public Rev. 0 03/2000
5.5 Environmental Impacts of Waste Rev. 0 03/2000
5.5.1 Nonradioactive-Waste-System Impacts Rev. 0 03/2000
5.5.2 Mixed Waste Impacts Rev. 0 03/2000
5.6 Transmission System Impacts Rev. 0 03/2000
5.6.1 Terrestrial Ecosystems Draft Rev. 1 07/2007
Rev. 0 03/2000
5.6.2 Aquatic Ecosystems Rev. 0 03/2000
5.6.3 Impacts to Members of the Public Rev. 0 03/2000
5.7 Uranium Fuel Cycle Impacts Draft Rev. 1 07/2007
Rev. 0 03/2000
5.7.1 Uranium Fuel Cycle Impacts Draft Rev. 0 07/2007
5.7.2 Transportation of Radioactive Materials Draft Rev. 0 07/2007
5.8 Socioeconomic Impacts Rev. 0 03/2000
5.8.1 Physical Impacts of Station Operation Rev. 0 03/2000
5.8.2 Social and Economic Impacts of Station Operation Rev. 0 03/2000
5.8.3 Environmental Justice Impacts Draft Rev. 1 07/2007
Rev. 0 03/2000
5.9 Decommissioning Rev. 0 03/2000
5.10 Measures and Controls to Limit Adverse Impacts During Operation Draft Rev. 1 07/2007
Rev. 0 03/2000
5.11 Cumulative Impacts Related to Station Operation Draft Rev. 0 07/2007