Information Notice No. 79-31 - Use of Incorrect Amplified Response Spectra (ARS)
IN79031
UNITED STATES
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D. C. 20555
December 11, 1979
MEMORANDUM FOR: B. H. Grier, Director, Region I
J. P. O'Reilly, Director, Region II
J. G. Keppler, Director, Region III
K. V. Seyfrit, Director, Region IV
R. H. Engelken, Director, Region V
FROM: Norman C. Moseley, Director, ROI:IE
SUBJECT: Information Notice No. 79-31 - USE OF INCORRECT
AMPLIFIED RESPONSE SPECTRA (ARS)
The subject Information Notice is transmitted for issuance on December 13,
1979. The Information Notice should be issued to all holders of power
reactor Operating Licenses and Construction Permits. Also enclosed is a
draft copy of the transmittal letter for this purpose.
Norman C. Moseley, Director
Division of Reactor Operations
Inspection
Office of Inspection and Enforcement
Enclosures:
1. Draft Transmittal Letter
2. Information Notice No.
No. 79-31
CONTACT: C. J. DeBevec, IE
49-28180
.
(Draft letter to all holders of power reactor Operating Licenses and
Construction Permits)
Information Notice No. 79-31
Addressee:
This Information Notice is provided as an early notification of a possibly
significant matter. It is expected that recipients will review the
information for possible applicability to their facilities. No specific
action or response is requested at this time. If further NRC evaluations so
indicate, an IE Circular or Bulletin will be issued to recommend or request
specific licensee actions. If you have questions regarding this matter,
please contact the Director of the appropriate NRC Regional Office.
Sincerely,
Signature
(Regional Director)
Enclosures:
1. Information Notice No.
No. 79-31
2. List of IE Information
Notices Recently Issued
.
SSINS: 6870
Accession No.:
7910250507
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
WASHINGTON, D.C. 20555
December 13, 1979
Information Notice No. 79-31
USE OF INCORRECT AMPLIFIED RESPONSE SPECTRA (ARS)
Description of Circumstances:
Recently, the NRC was informed that, during a review of valve weights in
conjunction with the as-built review for IE Bulletin 79-14 at North Anna
Unit 1, it was discovered that incorrect amplified response spectra (ARS)
had been used as input to the analyses of some piping on both units 1 and 2.
The reanalyses are being performed by Stone & Webster (S&W), the Architect
Engineer for the Virginia Electric & Power Company's facilities. Similarly,
Public Service Company of New Hampshire informed the NRC that the wrong ARS
were used for the design of some containment supports at their Seabrook
units. The Architect Engineer for these plants is United Engineers &
Constructors (UE&C).
The NRC is currently pursuing this issue in detail with S&W and UE&C to
determine the extent of the problem and the generic implications for other
facilities.
This Information Notice is provided as an early notification of a possible
significant matter. It is expected that recipients will review the
information for possible applicability to their facilities. Specific action
has been requested by IE Bulletin 79-14. This bulletin requires that input
to seismic analyses of piping, which includes the use of the correct ARS, be
verified against the as-built condition of the plant. No specific actions
are requested in response to this Information Notice. If NRC evaluations so
indicate, further licensee actions may be requested or required. If you have
any questions regarding this matter, please contact the Director of the
appropriate NRC Regional Office.
No written response to this Information Notice No. is required.