Circulars - 1981 Index
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
CR-81-15 | Unnecessary Radiation Exposures to the Public and Workers During Events Involving Thickness and Level Measuring Devices | -- | 12/08/1981 | -- |
CR-81-14 | Main Steam Isolation Valve Failures to Close | -- | 11/05/1981 | -- |
CR-81-13 | Torque Switch Electrical Bypass Circuit for Safeguard Service Valve Motors | -- | 09/25/1981 | -- |
CR-81-12 | Inadequate Periodic Test Procedure of PWR Reactor Protection System | -- | 07/22/1981 | -- |
CR-81-11 | Inadequate Decay Heat Removal During Reactor Shutdown | -- | 07/24/1981 | -- |
CR-81-10 | Steam Voiding in the Reactor Coolant System During Decay Heat Removal Cooldown | -- | 07/02/1981 | -- |
CR-81-09 | Containment Effluent Water that Bypasses Radioactivity Monitor | -- | 07/10/1981 | -- |
CR-81-08 | Foundation Materials | -- | 05/29/1981 | -- |
CR-81-07 | Control of Radioactively Contaminated Material | -- | 05/14/1981 | -- |
CR-81-06 | Potential Deficiency Affecting Certain Foxboro 10 to 50 Milliampere Transmitters | -- | 04/14/1981 | -- |
CR-81-05 | Self-Aligning Rod End Bushings for Pipe Supports | -- | 03/31/1981 | -- |
CR-81-04 | The Role of Shift Technical Advisors and Importance of Reporting Operational Events | -- | 04/30/1981 | -- |
CR-81-03 | Inoperable Seismic Monitoring Instrumentation | -- | 03/02/1981 | -- |
CR-81-02 | Performance of NRC-Licensed Individuals while on Duty | -- | 02/09/1981 | -- |
CR-81-01 | Design Problems Involving Indicating Pushbutton Switches Manufactured by Honeywell Incorporated | -- | 01/23/1981 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021