Circulars - 1979 Index
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
CR-79-25 | Shock Arrestor Strut Assembly Interference | -- | 12/14/1979 | -- |
CR-79-24 | Proper Installation and Calibration of Core Spray Pipe Break Detection Equipment on BWRs | -- | 11/26/1979 | -- |
CR-79-23 | Motor Starters and Contactors Failed to Operate | -- | 11/19/1979 | -- |
CR-79-22 | Stroke Times for Power Operated Relief Valves | -- | 11/15/1979 | -- |
CR-79-21 | Prevention of Unplanned Releases of Radioactivity | -- | 10/19/1979 | -- |
CR-79-20 | Failure of GTE Sylvania Relay Type PM Bulletin 7305 Catalog 5U12-11-AC with a 120V AC Coil | -- | 09/21/1979 | -- |
CR-79-19 | Loose Locking Devices on Ingersoll-Rand Pumps | -- | 09/10/1979 | -- |
CR-79-18 | Proper Installation of Target Rock Safety-Relief Valves | -- | 09/06/1979 | -- |
CR-79-17 | Contact Problem in SB-12 Switches on General Electric Company Metalclad Circuit Breakers | -- | 08/09/1979 | -- |
CR-79-16 | Excessive Radiation Exposures to Members of the General Public and a Radiographer | -- | 08/03/1979 | -- |
CR-79-15 | Bursting of High Pressure Hose and Malfunction of Relief Valve O-Ring in Certain Self-Contained Breathing Apparatus | -- | 08/02/1979 | -- |
CR-79-14 | Unauthorized Procurement and Distribution of XE-133 | -- | 07/13/1979 | -- |
CR-79-13 | Replacement of Diesel Fire Pump Starting Contactors | -- | 07/06/1979 | -- |
CR-79-12 | Potential Diesel Generator Turbocharger Problem | -- | 06/21/1979 | -- |
CR-79-11 | Design/Construction Interface Problem | -- | 06/21/1979 | -- |
CR-79-10 | Pipefittings Manufactured from Unacceptable Material | -- | 06/21/1979 | -- |
CR-79-09 | Occurrences of Split or Punctured Regulator Diaphragms in Certain Self Contained Breathing Apparatus | -- | 06/15/1979 | -- |
CR-79-08 | Attempted Extortion - Low Enriched Uranium | -- | 05/17/1979 | -- |
CR-79-07 | Unexpected Speed Increase of Reactor Recirculation MG Set Resulted in Reactor Power Increase | -- | 04/30/1979 | -- |
CR-79-06 | Failure to Use Syringe and Bottle Shields in Nuclear Medicine | -- | 04/16/1979 | -- |
CR-79-05 | Moisture Leakage in Stranded Wire Conductors | -- | 03/14/1979 | -- |
CR-79-04 | Loose Locking Nut on Limitorque Valve Operators | -- | 03/13/1979 | -- |
CR-79-03 | Inadequate Guard Training-Qualification and Falsified Training Records | -- | 02/23/1979 | -- |
CR-79-02 | Failure of 120 Volt Vital AC Power Supplies | -- | 01/11/1979 | -- |
CR-79-01 | Administration of Unauthorized Byproduct Material to Humans | -- | 01/05/1979 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021