IE Circular No. 79-23 - Motor Starters and Contractors Failed to Operate
CR79023 November 19, 1979 MEMORANDUM FOR: B. H. Grier, Director, Region I J. P. O'Reilly, Director, Region II J. G. Keppler, Director, Region III K. V. Seyfrit, Director, Region IV R. H. Engelken, Director, Region V FROM: Harold D. Thornburg, Director, Division of Reactor Construction Inspection, IE SUBJECT: IE CIRCULAR NO. 79-23 - MOTOR STARTERS AND CONTRACTORS FAILED TO OPERATE The subject Circular is transmitted for issuance on November 26, 1979. The Circular should be issued to all power reactor operating facilities and holders of reactor construction permits. The text of the circular and draft letter to the licensees and permit holders are enclosed for this purpose. Harold D. Thornburg, Director Division of Reactor Construction Inspection Office of Inspection and Enforcement Enclosures 1. Draft transmittal letter 2. IE Information Notice No. 79-23 CONTACT: W. Laudan, IE 49-27551 . (Draft letter to all power reactor operating facilities and holders of reactor construction permits.) IE Circular No. 79-23 Gentlemen: The enclosed Circular 79-23 is forwarded to you for your information. No written response to this circular is required. If you have any questions related to the subject, please contact this office. Sincerely, Signature (Regional Director) Enclosure: 1. IE Circular No. 79-23 . UNITED STATES SSINS No.: 6830 NUCLEAR REGULATORY COMMISSION Accession No: OFFICE OF INSPECTION AND ENFORCEMENT 7910250496 WASHINGTON, D.C. 20555 November 26, 1979 IE Circular No. 79-23 MOTOR STARTERS AND CONTRACTORS FAILED TO OPERATE Gould, Inc., Electrical Products Group, reported to the NRC on September 11, 1979 potential defects in certain NEMA size 3, Starters and Contractors. A possible binding or seizure of the carrier assembly, within the support plate of the stationary contact assembly, is caused by an undersized dimension of the support legs. Starters and contractors with date code 7822 to 7935, model and serial numbers A1O, A11, A12, A13, A14, A20, A21, A22, and P1O are involved. Faulty units were manufactured and distributed between June 1, 1978 and August 30, 1979. The attached listing of nuclear plants, which have received some of this motor control equipment, represents a preliminary check of shipment records. This listing, however, may not be complete. Gould, Inc., will recall uninstalled items for retrofit and has retrofit kits available for field installation. Based on the above, licensees are advised to verify all motor starter and contractor shipments received from Gould, Inc., between June 1, 1978 and August 30, 1979, and assure that applicable model and serial number components are corrected by retrofit and subsequent electrical operation tests. No written response to this Circular is required. If you desire additional information regarding this matter, contact the Director of the appropriate NRC Regional Office. Attachments: 1. List of Plants that may have Received Defective Starters or Contractors 2. List of Recently Issued IE Circulars . Enclosure: 1 According to a preliminary check of Gould's shipment records, the following nuclear facilities have been shipped motor control equipment which could include one or more defective NEMA Size 3 starters or contractors: Purchase Date Facility Owner/Contractor Order Shipped Farley Nuclear Plant, Unit 1 Alabama Power FNP1-3676 7-21-78 Operation 8-77 Bechtel FNP2-131 7-20-78 FNP2-125B 4-24-79 Arkansas Nuclear Plt. One Arkansas Power & 6600-E2011-AC 12-18-78 Unit 2 Operation 12-77 Light Bechtel Rev. 1B Sharon Harris Nuclear Plt. Carolina Power and NY-435120 7-31-79 Unit 1 Construction Light Ebasco 8-20-79 8-31-79 Zimmer Nuclear Station Unit 1 Cincinnati G & E Z-50001 12-14-78 Construction Midland Consumers Power Co. 7220-E-7-AC Various Construction Bechtel Shipment in 78 & 79 Fermi 2 Nuclear Station Detroit Edison 1E-90235 8-14-78 Construction Sargent & Lundy Change Order 6 Beaver Valley Unit 2 Duquesne Light Co. 2BV-310 Various Construction Stone & Webster Shipment in 78 & 79 Clinton Nuclear Station Units Illnois Power Co. Contract K-2976 8-24-78 1&2 Construction Baldwin Assoc. Wolf Creek Unit 1 Kansas Gas & 10466-E-018-1 Various Construction Electric Bechtel Shipment in (SNUPPS) 78 & 79 San Onofre Nuclear Gen, Limitorque 3A4777 12-26-78 Sta 2/3 Construction Kuosheng Nuclear Pwr. Sta. Taiwan Power Co. 9713-E-0003A 1-8-79 Units 1&2 Construction Bechtel Bellefonte Nuclear Plant T V A 76K5-86242 Various Construction shipment in 78 & 79 Watts Bar Units 1&2 T V A 74C5-84646 Various Construction shipments in 78 & 79 Page 1 of 2 . Continued Page 2 of 2 Facility Owner/Construction Order Shipped Callaway Unit 1 Union Electric 10466-E-018-2 Various Construction Bechtel (SNUPPS) shipments in 78 & 79 WPPSS Nuclear Project Unit 2 WPPSS Contract No. Various Construction Burns & Roe 49 C/D 7 shipments in 78 & 79
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021