Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Circulars - 1976 Index

Document NumberTitleRevisionPublish DateReviewed Date
CR-76-07Inadequate Performance by Reactor Operating and Support Staff Members--12/17/1976--
CR-76-06Stress Corrosion Cracks in Stagnant, Low Pressure Stainless Piping Containing Boric Acid Solution at PWRs--11/22/1976--
CR-76-05Hydraulic Shock and Sway Suppressors - Maintenance of Bleed and Lock-up Velocities on ITT Grinnell Models--10/08/1976--
CR-76-04Neutron Monitor and Flow Bypass Switch Malfunctions--09/29/1976--
CR-76-03Radiation Exposures in Reactor Cavities--09/10/1976--
CR-76-02Relay Failures - Westinghouse BF (ac) and BFD (dc) Relays--08/16/1976--
CR-76-01Crane Hoist Control Circuit Modifications--07/27/1976--

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021