Circulars - 1977 Index
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
CR-77-16 | Emergency Diesel Generator Electrical Trip Lock-Out Features | -- | 12/09/1977 | -- |
CR-77-15 | Degradation of Fuel Oil Flow to the Emergency Diesel Generator | -- | 11/28/1977 | -- |
CR-77-14 | Separation of Contaminated Water Systems from Noncontaminated Plant Systems | -- | 11/22/1977 | -- |
CR-77-13 | Reactor Safety Signals Negated During Testing | -- | 09/22/1977 | -- |
CR-77-12 | Dropped Fuel Assemblies at BWR Facilities | -- | 09/15/1977 | -- |
CR-77-11 | Leakage of Containment Isolation Valves with Resilient Seats | -- | 09/02/1977 | -- |
CR-77-10 | Vacuum Conditions Resulting in Damage to Liquid Process Tanks | -- | 07/15/1977 | -- |
CR-77-09 | Improper Fuse Coordination in BWR Standby Liquid Control System Control Circuits | -- | 05/25/1977 | -- |
CR-77-08 | Failure of Feedwater Sample Probe | -- | 04/13/1977 | -- |
CR-77-07 | Short Period During Reactor Startup | -- | 04/12/1977 | -- |
CR-77-06 | Effects of Hydraulic Fluid on Electrical Cables | -- | 04/01/1977 | -- |
CR-77-05 | Fluid Entrapment in Valve Bonnets | -- | 03/24/1977 | -- |
CR-77-04 | Inadequate Lock Assemblies | -- | 03/17/1977 | -- |
CR-77-03 | Fire Inside a Motor Control Center | -- | 02/28/1977 | -- |
CR-77-02a | Potential Heavy Spring Flooding (CP) | -- | 02/18/1977 | -- |
CR-77-02 | Potential Heavy Spring Flooding (OL) | -- | 02/15/1977 | -- |
CR-77-01 | Malfunctions of Limitorque Valve Operators | -- | 01/04/1977 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021