Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Bulletins: 1975 Index

Document NumberTitleRevisionPublish DateRevision Date
BL-75-08PWR Pressure Instrumentation--12/11/1975--
BL-75-07No Title – Involves Exothermic Reaction in Radwaste Shipment--11/26/1975--
BL-75-06Defective Westinghouse Type OT-2 Control Switches--05/30/1975--
BL-75-05Operability of Category I Hydraulic Shock and Sway Suppressors--04/14/1975--
BL-75-04Cable Fire at Browns Ferry Nuclear Power Station211/03/1975--
104/03/1975--
--03/24/1975--
BL-75-03Incorrect Lower Disc Spring and Clearance Dimension in Series 8300 and 8302 ASCO Solenoid Valves--03/14/1975--
BL-75-02Defective Radionics Radiographic Exposure Devices and Source Changers--02/14/1975--
BL-75-01Through-Wall Cracks in Core Spray Piping at Dresden-2202/07/1975--
--01/30/1975--

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021