RPV Upper Head Issues -- News and Correspondence for 2018
This page lists, in chronological order, general news and correspondence on RPV upper head issues for 2018.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date |
Description |
12/10/2018 |
Regulatory Issue Summary 2018-06 "Clarification of the Requirements for Reactor Pressure Vessel Upper Head Bare Metal Visual Examinations," |
11/19/2018 |
Operating Experience Smart Sample (OpESS) 2018/01, "Evaluation of Licensee Actions Taken in Response to 10 CFR Part 21 Notification of the Potential Existence of Defects Related to Control Rod Drive Mechanism (CRDM) Thermal Sleeves," November 19, 2018 |
08/29/2018 |
NRC Information Notice 2018-10, "Thermal Sleeve Flange Wear Leads to Stuck Control Rod at foreign Nuclear Plant" |
07/17/2018 |
NSAL-18-1, "Thermal Sleeve Flange Wear Leads to Stuck Control Rod," |