Bulletin 2002-02 Plant Specific Information

Plant-specific correspondence, meetings, and responses to bulletin 2002-02 concerning inspection programs are listed below by region.

Region II Region I Region III Region IVRegion I Region II Region III Region IV

Completion of Plant-Specific Licensing Activities Associated with Bulletin 2002-02, Reactor Pressure Vessel Head Penetration Nozzle Inspection Programs Memorandum dated March 19, 2003.

 

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

 

Region 1

Plant Name Bulletin Response Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Beaver Valley 1   PDF Icon      
Beaver Valley 2   PDF Icon       
Calvert Cliffs 1 PDF Icon PDF Icon      
Calvert Cliffs 2 PDF Icon PDF Icon      
Ginna   PDF Icon      
Indian Point 2   PDF Icon  PDF Icon   11/13/02 Ackn Ltr
Indian Point 3 PDF Icon       12/19/02 Inspection Plan
Millstone 2 PDF Icon PDF Icon      
Millstone 3   PDF Icon PDF Icon    10/30/02 Ackn Ltr
Salem 1   PDF Icon PDF Icon   12/02/02 Ackn Ltr
Salem 2   PDF Icon     12/02/02 Ackn Ltr
Seabrook 1   PDF Icon     12/02/02 Ackn Ltr
12/20/02 Revised 30-Day Resp
Three Mile Island 1   PDF Icon      

(To top of page)

Region 2

Plant Name Bulletin Response Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Catawba 1   PDF Icon     11/22/02 Ackn Ltr
06/19/03 Inspection Plans
Catawba 2   PDF Icon     11/08/02 Ackn Ltr
06/19/03 Inspection Plans
Crystal River 3 PDF Icon       The facility was permanently shut down on February 20, 2013
Farley 1 PDF Icon       11/04/02 - 30 Day Supp.
Farley 2   PDF Icon PDF Icon   10/04/02 Supp. Response
11/04/02 30 Day Supp.
12/23/02 Ackn Ltr
McGuire 1   PDF Icon  PDF Icon   11/08/02 Ackn Ltr
06/19/03 Inspection Plans
McGuire 2   PDF Icon     11/08/02 Ackn Ltr
06/19/03 Inspection Plans
North Anna 1   PDF Icon PDF Icon   10/11/02 RAI Ltr
12/20/02 RAI Response
01/03/03 Ackn Ltr
01/23/03 RAI Response
North Anna 2   PDF Icon  PDF Icon   11/21/02 Head Replacement Ltr
12/20/02 RAI Response
01/03/03 Ackn Ltr
01/23/03 RAI Response
02/27/03 Root Cause Eval and
Revised Insp Results
03-09-03 Head Replacement Spec Insp
Oconee 1   PDF Icon     09/25/03 Supplemental Info
Oconee 2   PDF Icon   PDF Icon   12/16/02 RAI Response
09/25/03 Supplemental Info
Oconee 3   PDF Icon     09/25/03 Supplemental Info
Robinson 2   PDF Icon PDF Icon    01/08/04 Head Inspections Planned
Sequoyah 1   PDF Icon     12/16/02 Ackn Ltr
Sequoyah 2   PDF Icon     12/16/02 Ackn Ltr
Shearon Harris 1   PDF Icon      
St. Lucie 1   PDF Icon PDF Icon 10/10/02-10/14/02 Telecon Summary
Telecon Slides
 
St. Lucie 2   PDF Icon PDF Icon   04/08/05 Ackn Ltr
Summer   PDF Icon      
Surry 1   PDF Icon      01/03/03 Ackn Ltr
01/23/03 RAI Response
Surry 2   PDF Icon     01/03/03 Ackn Ltr
01/23/03 RAI Response
Turkey Point 3   PDF Icon      
Turkey Point 4   PDF Icon      
Vogtle 1   PDF Icon     10/02/02 Errata
11/14/02 Ackn Ltr
Vogtle 2   PDF Icon     10/02/02 Errata
11/13/02 Ackn Ltr
Watts Bar 1   PDF Icon     12/20/02 Ackn Ltr

(To top of page)

Region 3

Plant Name Bulletin Response Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Braidwood 1   PDF Icon     12/02/02 Ackn Ltr
Braidwood 2   PDF Icon     12/02/02 Ackn Ltr
Byron 1   PDF Icon     11/05/02 Ackn Ltr
Byron 2   PDF Icon PDF Icon    11/05/02 Ackn Ltr
Davis Besse   PDF Icon      
DC Cook 1   PDF Icon      
DC Cook 2   PDF Icon      
Kewaunee PDF Icon       Power Station was permanently shut down on May 7, 2013
Palisades PDF Icon        
Point Beach 1   PDF Icon PDF Icon   10/04/02 RAI Response
04/10/03 RAI Response
Calc 32-5019398-01 Weld Anomaly
Calc 32-5019396-01 J-Groove Weld
Calc 32-5020244-01 Temperbead Bore Weld
Point Beach 2   PDF Icon     10/04/02 RAI Response
04/10/03 RAI Response
Calc 32-5019398-01 Weld Anomaly
Calc 32-5019396-01 J-Groove Weld
Calc 32-5020244-01 Temperbead Bore Weld

 

Prairie Island 1 PDF Icon   PDF Icon   08/05/03 Supp Response
Prairie Island 2 PDF Icon       08/05/03 Supp Response

(To top of page)

Region 4

Plant Name Bulletin Response Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Arkansas Nuclear 1      PDF Icon PDF Icon  10/16/02 Notice
10/16/02 Slides
10/08/02-11/06/02 - Telecon Summary
10/31/02 - 30 Day Supp.
12/24/02 Ackn Ltr
Draft RAI Resp- BL2002-01
Arkansas Nuclear 2 PDF Icon        
Callaway    PDF Icon  PDF Icon   11/13/02 Ackn Ltr
Comanche Peak 1   PDF Icon PDF Icon    12/02/02 Ackn Ltr
Comanche Peak 2   PDF Icon     12/02/02 Ackn Ltr
Diablo Canyon 1   PDF Icon     04/23/04 Ackn Ltr
Diablo Canyon 2   PDF Icon     04/23/04 Ackn Ltr
Fort Calhoun   PDF Icon     02/17/03 Revised 30-Day Resp
PDF Icon
Palo Verde 1   PDF Icon   PDF Icon    
Palo Verde 2   PDF Icon      
Palo Verde 3   PDF Icon      
San Onofre 2   PDF Icon PDF Icon   12/31/02 Revised 30-Day Resp
Station was permanently shut down on June 12, 2013
San Onofre 3   PDF Icon PDF Icon   12/3/docs/ML0300/ML030030484.pdf1/02 Revised 30-Day Resp
02/14/02 Inspection Status
Station was permanently shut down on June 12, 2013
South Texas 1   PDF Icon     12/26/02 Ackn Ltr
South Texas 2   PDF Icon PDF Icon    12/26/02 Ackn Ltr
Waterford 3 PDF Icon        
Wolf Creek 1   PDF Icon     12/04/02 Ackn Ltr

Ackn - Acknowledgment Letter
Supp - Supplemental
Resp - Response

(To top of page)

Page Last Reviewed/Updated Monday, March 28, 2022