APR1400 Final Safety Evaluations
The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the DCD application that Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) submitted for the Advanced Power Reactor 1400 (APR1400):
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Chapter |
Description |
Date |
TOC |
Table of Contents |
09/28/18 |
1 |
Introduction and General Discussion |
09/28/18 |
2 |
Site Characteristics |
09/28/18 |
3 |
Design of Structures, Components, Equipment, and Systems |
09/28/18 |
4 |
Reactor |
09/28/18 |
5 |
Reactor Coolant System and Connected Systems |
09/28/18 |
6 |
Engineered Safety Features |
09/28/18 |
7 |
Instrumentation and Controls |
09/28/18 |
8 |
Electric Power |
09/28/18 |
9 |
Auxiliary Systems |
09/28/18 |
10 |
Steam and Power Conversion System |
09/28/18 |
11 |
Radioactive Waste Management |
09/28/18 |
12 |
Radiation Protection |
09/28/18 |
13 |
Conduct of Operations |
09/28/18 |
14 |
Verification Programs |
09/28/18 |
15 |
Accident and Transient Analyses |
09/28/18 |
16 |
Technical Specifications |
09/28/18 |
17 |
Quality Assurance and Reliability Assurance |
09/28/18 |
18 |
Human Factors Engineering |
09/28/18 |
19 |
Probabilistic Risk Assessment and Severe Accident Evaluation |
09/28/18 |
Appendix A |
Chronology |
09/28/18 |
Appendix B |
References |
09/28/18 |
Appendix C |
Acronyms |
09/28/18 |
Appendix D |
Principal Contributors |
09/28/18 |
Appendix E |
Index of NRC's Requests for Additional Information |
09/28/18 |
Appendix F |
Report by the Advisory Committee on Reactor Safeguards |
09/28/18 |