Issued Combined Licenses for South Texas Project, Units 3 and 4

By letter dated September 20, 2007, STPNOC, acting on behalf of itself and the proposed owners, including NINA Texas 3 LLC, NINA Texas 4 LLC, and the City of San Antonio, Texas, acting by and through the City Public Service Board, submitted its application to the NRC for two Advanced Boiling Water Reactors (ABWRs) under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants." The STP 3 and 4 reactors will be located on the existing South Texas Project Electric Generating Station site in Matagorda County, Texas.

On January 24, 2011, NINA became the lead applicant for the STP 3 and 4 COL application, with STPNOC remaining as the operator. NINA assumed responsibility for design, construction, and licensing prior to operation of STP 3 and 4. STPNOC would be the licensed operator for the STP 3 and 4, as it currently is for the existing STP Units 1 and 2.

For detail (including the latest submittal of the application, the related review schedule, and the associated staff documentation), see the following topics on this page:

Application Information

The following table provides access to the COL Application that NINA submitted for South Texas Project, Units 3 & 4.

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Final Safety Analysis Report and associated Technical/Topical Reports would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Part

Description

Revision

1

General and Financial Information

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

2

Final Safety Analysis Report (FSAR)

Rev. 13
Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

3

Environmental Report

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

4

Technical Specifications

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

5

Emergency Plan

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

6

Site Redress Plan

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

7

Departures Report

Rev. 13
Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

8

Security TQ Safeguards

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

9

Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

10

Proprietary Information

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

11

Mitigative Strategies

Rev. 12
Rev. 11
Rev. 10
Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

Incorporated by Referenced Documents:

To top of page

Review Schedule

Key Milestones

Completion Date
Actual - A
Target - T

Application Tendered

09/20/07 - A

Acceptance Review

Acceptance Review Start

10/01/07 - A

Docketing Decision Letter Issued/Acceptance Review Complete

11/29/07 - A

Review Schedule Established/Schedule Letter Issued to Applicant

02/10/09 - A

Safety Review

Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant

09/17/09 - A

Phase 2 - SER with Open Items issued

10/29/10 - A

Phase 3 - ACRS Review of SER with Open Items Complete

11/30/10 - A

Phase 4 - Advanced SER with no Open Items Issued

09/29/14 - A

Phase 5 - ACRS Review of SER with no Open Items Complete

12/03/14 - A

Phase 6 - Final SER Issued

09/29/15 - A

Environmental Review

Phase 1 - EIS Scoping Summary Report issued

09/26/08 - A

Phase 2 - Draft EIS issued to EPA

03/19/10 - A

Phase 3 - Response to public comments on draft EIS resolved

09/03/10 - A

Phase 4 - Final EIS issued to EPA

02/24/11 - A

Hearing

ASLB holds contested hearing

08/17-18/11 - A
10/31/11 - A

Commission holds mandatory hearing

11/19/15 - A

License

Commission decision on issuance of COL application

02/09/16 - A

To top of page

Final Safety Evaluation Report

This section lists the Safety Evaluations that the NRC has issued in connection with its review of the COL application that NINA submitted for South Texas Project, Units 3 and 4.

Date

Description

09/29/15

Final Safety Evaluation Report for South Texas Project, Units 3 and 4 Application

To top of page

Final Environmental Impact Statement

This section lists the final Environmental Impact Statement that the NRC has issued in review of the COL application that NINA submitted for South Texas Project, Units 3 and 4.

Date

Description

02/24/11

NUREG-1937, Final Environmental Impact Statement

To top of page

Combined Licenses (COLs)

This section lists the COLs for the South Texas Project, Units 3 and 4 were issued on February 12, 2016.

To top of page

To top of page

Contacts

For additional information regarding the South Texas Project, Units 3 and 4 COL Application, please Contact a Public Affairs Officer.

To top of page

Page Last Reviewed/Updated Friday, March 06, 2026

Page Last Reviewed/Updated Friday, March 06, 2026