Home > NRC Library > ADAMS Public Documents
South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6
Accession Number: ML11252A886
Date Released: Wednesday, September 28, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11252A540 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Appendix A Legend for Figures (2 page(s), 8/30/2011)
- ML11252A541 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Appendix B Abbreviations and Acronyms Used in the ABWR Certified Design Material (4 page(s), 8/30/2011)
- ML11252A542 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Appendix C Conversion to ASME Standard Units (2 page(s), 8/30/2011)
- ML11252A543 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 01 - Introduction (2 page(s), 8/30/2011)
- ML11252A544 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 01 - Introduction - Section 01.01 Definitions (2 page(s), 8/30/2011)
- ML11252A545 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 01 - Introduction - Section 01.02 General Provisions (2 page(s), 8/30/2011)
- ML11252A546 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.01 Nuclear Steam Supply System (2 page(s), 8/30/2011)
- ML11252A547 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.02 Control and Instrument Systems (12 page(s), 8/30/2011)
- ML11252A548 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.03 Radiation Monitoring Systems (4 page(s), 8/30/2011)
- ML11252A549 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.04 Core Cooling Systems (14 page(s), 8/30/2011)
- ML11252A550 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.05 Reactor Servicing Equipment (2 page(s), 8/30/2011)
- ML11252A551 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.06 Reactor Auxiliary Systems (2 page(s), 8/30/2011)
- ML11252A552 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.07 Control Panels (8 page(s), 8/30/2011)
- ML11252A553 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.08 Nuclear Fuel (2 page(s), 8/30/2011)
- ML11252A554 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.09 Radioactive Waste System (2 page(s), 8/30/2011)
- ML11252A555 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.10 Power Cycle Systems (4 page(s), 8/30/2011)
- ML11252A556 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.11 Station Auxiliary Systems (4 page(s), 8/30/2011)
- ML11252A557 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.12 Station Electrical Systems (10 page(s), 8/30/2011)
- ML11252A558 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.13 Power Transmission (2 page(s), 8/30/2011)
- ML11252A559 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.14 Containment and Environmental Control Systems (6 page(s), 8/30/2011)
- ML11252A560 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.15 Structures and Servicing Systems (10 page(s), 8/30/2011)
- ML11252A563 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.16 Yard Structures and Equipment (2 page(s), 8/30/2011)
- ML11252A564 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 02 - Certified Design Material for ABWR Systems - Section 02.17 Emergency Planning (2 page(s), 8/30/2011)
- ML11252A565 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 03 - Additional Certified Design Material - Section 03.01 Human Factors Engineering (2 page(s), 8/30/2011)
- ML11252A566 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 03 - Additional Certified Design Material - Section 03.02 Radiation Protection (6 page(s), 8/30/2011)
- ML11252A567 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 03 - Additional Certified Design Material - Section 03.03 Piping Design (2 page(s), 8/30/2011)
- ML11252A568 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 03 - Additional Certified Design Material - Section 03.04 Instrumentation and Control (18 page(s), 8/30/2011)
- ML11252A569 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 03 - Additional Certified Design Material - Section 03.05 Initial Test Program (2 page(s), 8/30/2011)
- ML11252A570 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 03 - Additional Certified Design Material - Section 03.06 Design Reliability Assurance Program (2 page(s), 8/30/2011)
- ML11252A571 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.00 Interface Requirements (2 page(s), 8/30/2011)
- ML11252A572 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.01 Ultimate Heat Sink (2 page(s), 8/30/2011)
- ML11252A573 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.02 Offsite Power System (2 page(s), 8/30/2011)
- ML11252A574 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.03 Makeup Water Preparation System (2 page(s), 8/30/2011)
- ML11252A575 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.04 Potable and Sanitary Water System (2 page(s), 8/30/2011)
- ML11252A576 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.05 Reactor Service Water System (2 page(s), 8/30/2011)
- ML11252A577 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.06 Turbine Service Water System (2 page(s), 8/30/2011)
- ML11252A578 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.07 Communication System (2 page(s), 8/30/2011)
- ML11252A579 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.08 Site Security (2 page(s), 8/30/2011)
- ML11252A580 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.09 Circulating Water System (2 page(s), 8/30/2011)
- ML11252A581 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 04 - Interface Requirements - Section 04.10 Heating, Ventilating and Air Conditioning System (2 page(s), 8/30/2011)
- ML11252A582 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Chapter 05 - Site Parameters (4 page(s), 8/30/2011)
- ML11252A583 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 1 - Table of Contents (2 page(s), 8/30/2011)
- ML11252A584 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Appendix 01A Response to TMI Related Matters (6 page(s), 8/30/2011)
- ML11252A585 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Appendix 01AA Plant Shielding to Provide Access to Vital Areas and PSE for Post-Accident Op. (4 page(s), 8/30/2011)
- ML11252A586 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Appendix 01B Not Used (2 page(s), 8/30/2011)
- ML11252A587 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Appendix 01C ABWR Station Blackout Considerations (10 page(s), 8/30/2011)
- ML11252A588 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Appendix 01D Negation Action Plan (18 page(s), 8/30/2011)
- ML11252A589 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.01 Introduction (12 page(s), 8/30/2011)
- ML11252A590 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.02 General Plant Description (14 page(s), 8/30/2011)
- ML11252A591 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.03 Comparison Tables (2 page(s), 8/30/2011)
- ML11252A592 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.04 Identification of Agents and Contractors (4 page(s), 8/30/2011)
- ML11252A593 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.05 Requirements for Further Technical Information (2 page(s), 8/30/2011)
- ML11252A595 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.06 GE Topical Reports and Other Documents (2 page(s), 8/30/2011)
- ML11252A596 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.07 Drawings (6 page(s), 8/30/2011)
- ML11252A597 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.08 Conformance with Standard Review Plan and Applicability of Codes and Standards (8 page(s), 8/30/2011)
- ML11252A598 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.08S Site Params., Interface Reqs., COL Lic. Information Items, and Conceptual Design Inf. (4 page(s), 8/30/2011)
- ML11252A599 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.09 COL License Information (2 page(s), 8/30/2011)
- ML11252A600 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.09S Conformance with Regulatory Criteria (28 page(s), 8/30/2011)
- ML11252A601 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 01 - Introduction - Section 01.10S Impacts of Construction (12 page(s), 8/30/2011)
- ML11252A602 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Appendix 02A Input to CRAC 2 Computer Code for Determination of ABWR Site Acceptability (2 page(s), 8/30/2011)
- ML11252A603 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.00 Site Characteristics (12 page(s), 8/30/2011)
- ML11252A604 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.01 Limits Imposed on SRP Section II Acceptance Criteria by ABWR Standard Plant (6 page(s), 8/30/2011)
- ML11252A605 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.01S Geography and Demography (38 page(s), 8/30/2011)
- ML11252A606 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.02 Requirements for Determination of ABWR Site Acceptability (2 page(s), 8/30/2011)
- ML11252A607 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.02S Nearby Industrial, Transportation, and Military Facilities (72 page(s), 8/30/2011)
- ML11252A608 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.03 COL License Information (8 page(s), 8/30/2011)
- ML11252A609 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.03S Meteorology (166 page(s), 8/30/2011)
- ML11252A610 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.01 Hydrologic Description (30 page(s), 8/30/2011)
- ML11252A611 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.02 Floods (28 page(s), 8/30/2011)
- ML11252A612 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.03 Probable Maximum Flood (PMF) on Streams and Rivers (46 page(s), 8/30/2011)
- ML11252A613 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.04 Potential Dam Failures (78 page(s), 8/30/2011)
- ML11252A614 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.05 Probable Maximum Surge and Seiche Flooding (24 page(s), 8/30/2011)
- ML11252A615 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.06 Probable Maximum Tsunami Hazards (44 page(s), 8/30/2011)
- ML11252A616 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.07 Ice Effects (8 page(s), 8/30/2011)
- ML11252A617 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.08 Cooling Water Canals and Reservoirs (10 page(s), 8/30/2011)
- ML11252A618 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.09 Channel Diversions (18 page(s), 8/30/2011)
- ML11252A619 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.10 Flooding Protection Requirements (2 page(s), 8/30/2011)
- ML11252A620 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.11 Low Water Considerations (10 page(s), 8/30/2011)
- ML11252A621 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.12 Groundwater (120 page(s), 8/30/2011)
- ML11252A622 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.13 Accidental Releases of Radioactive Liq. Effl. in Ground and Surface Waters (38 page(s), 8/30/2011)
- ML11252A623 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.04S.14 Technical Specifications and Emergency Operation Requirements (2 page(s), 8/30/2011)
- ML11252A624 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S Geology, Seismology, and Geotechnical Engineering (4 page(s), 8/30/2011)
- ML11252A625 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 1-89 (89 page(s), 8/30/2011)
- ML11252A626 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 90-97 (8 page(s), 8/30/2011)
- ML11252A627 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 98-106 (9 page(s), 8/30/2011)
- ML11252A628 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 107-115 (9 page(s), 8/30/2011)
- ML11252A629 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 116-124 (9 page(s), 8/30/2011)
- ML11252A630 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 125-128 (4 page(s), 8/30/2011)
- ML11252A631 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 129-133 (5 page(s), 8/30/2011)
- ML11252A632 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.01 Basic Geologic and Seismic Information - Pages 134-135 (2 page(s), 8/30/2011)
- ML11252A633 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.02 Vibratory Ground Motion (133 page(s), 8/30/2011)
- ML11252A634 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.03 Surface Faulting (12 page(s), 8/30/2011)
- ML11252A635 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.04 Stability of Subsurface Materials and Foundations - Pages 1-390 (390 page(s), 8/30/2011)
- ML11252A636 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.04 Stability of Subsurface Materials and Foundations - Pages 391-440 (50 page(s), 8/30/2011)
- ML11252A637 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 02 - Site Characteristics - Section 02.05S.05 Stability of Slopes (2 page(s), 8/30/2011)
- ML11252A638 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03A Seismic Soil Structure Interaction Analysis (92 page(s), 8/30/2011)
- ML11252A639 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03B Containment Hydrodynamic Loads (14 page(s), 8/30/2011)
- ML11252A640 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - App 03C Computer Programs Used in the Design and Analy. of Seismic Cat. I Struct. (6 page(s), 8/30/2011)
- ML11252A641 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03D Computer Programs Used in the Design of Comp., Equip. and Struct. (2 page(s), 8/30/2011)
- ML11252A642 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03E Guidelines for LBB Application (2 page(s), 8/30/2011)
- ML11252A643 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03F Not Used (2 page(s), 8/30/2011)
- ML11252A644 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03G Response of Struct. to Containment Loads (2 page(s), 8/30/2011)
- ML11252A645 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03H-A Details and Evaluation Results of Seismic Cat. 1 Struct Pg 1-346 (346 page(s), 8/30/2011)
- ML11252A646 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03H-B Details and Evaluation Results of Seismic Cat. 1 Struct Pg 347-670 (324 page(s), 8/30/2011)
- ML11252A647 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03I Equip. Qualification Environmental Design Crit. (4 page(s), 8/30/2011)
- ML11252A648 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03J Not Used (2 page(s), 8/30/2011)
- ML11252A649 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03K Designated Mat. Which May Not Change Without Prior NRC Approval (2 page(s), 8/30/2011)
- ML11252A650 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03L Evaluation of Postulated Ruptures in High Energy Pipes (2 page(s), 8/30/2011)
- ML11252A652 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03M Resolution of Intersystem LOCA for ABWR (4 page(s), 8/30/2011)
- ML11252A655 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Appendix 03MA System Evaluation for ISLOCA (24 page(s), 8/30/2011)
- ML11252A659 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.01 Conformance with NRC General Design Criteria (4 page(s), 8/30/2011)
- ML11252A660 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.02 Classification of Struct., Comp., and Systems (10 page(s), 8/30/2011)
- ML11252A661 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.03 Wind and Tornado Loadings (2 page(s), 8/30/2011)
- ML11252A662 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.04 Water Level (Flood) Design (12 page(s), 8/30/2011)
- ML11252A663 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.05 Missile Protection (6 page(s), 8/30/2011)
- ML11252A664 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Sec 03.06 Prot. Against Dyn. Effects Assoc. with the Postulated Rupture of Piping (4 page(s), 8/30/2011)
- ML11252A665 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.07 Seismic Design (20 page(s), 8/30/2011)
- ML11252A666 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.08 Seismic Cat. I Struct. (14 page(s), 8/30/2011)
- ML11252A667 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.09 Mechanical Systems and Comp. (16 page(s), 8/30/2011)
- ML11252A668 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.09S Inservice Testing Program (OM-2004) (44 page(s), 8/30/2011)
- ML11252A669 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.10 Seismic and Dynamic Qual. of Mech. and Elect. Equip. (2 page(s), 8/30/2011)
- ML11252A670 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.11 Env. Qual. of Safety-Related Mech. and Elect. Equip. (4 page(s), 8/30/2011)
- ML11252A671 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.12 Tunnels (2 page(s), 8/30/2011)
- ML11252A672 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.12S Piping Design Review (2 page(s), 8/30/2011)
- ML11252A673 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.13 Secondary Containment and Divisional Separation Zones (2 page(s), 8/30/2011)
- ML11252A674 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 03 - Design of Struct., Comp., Equip. and Systems - Section 03.13S Threaded Fasteners ASME Code Class 1, 2, 3 (2 page(s), 8/30/2011)
- ML11252A675 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Appendix 04A Typical Control Rod Patterns and Associated Power Distribution for ABWR (2 page(s), 8/30/2011)
- ML11252A676 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Appendix 04B Fuel Licensing Acceptance Criteria (2 page(s), 8/30/2011)
- ML11252A677 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Appendix 04C Control Rod Licensing Acceptance Criteria (2 page(s), 8/30/2011)
- ML11252A678 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Appendix 04D Reference Fuel Design Compliance with Acceptance Criteria (2 page(s), 8/30/2011)
- ML11252A679 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Section 04.01 Summary Description (2 page(s), 8/30/2011)
- ML11252A680 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Section 04.02 Fuel System Design (2 page(s), 8/30/2011)
- ML11252A681 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Section 04.03 Nuclear Design (2 page(s), 8/30/2011)
- ML11252A682 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Section 04.04 Thermal-Hydraulic Design (2 page(s), 8/30/2011)
- ML11252A683 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Section 04.05 Reactor Materials (12 page(s), 8/30/2011)
- ML11252A684 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 04 - Reactor - Section 04.06 Functional Design of Reactivity Control System (4 page(s), 8/30/2011)
- ML11252A685 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 05 - Reactor Coolant System and Connection Systems - Appendix 05A Method of Compliance For Regulatory Guide 1.150 (2 page(s), 8/30/2011)
- ML11252A686 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 05 - Reactor Coolant System and Connection Systems - Appendix 05B RHR Injection Flow And Heat Capacity Analysis Outlines (2 page(s), 8/30/2011)
- ML11252A687 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 05 - Reactor Coolant System and Connection Systems - Section 05.01 Reactor Coolant System and Connection Systems (2 page(s), 8/30/2011)
- ML11252A688 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 05 - Reactor Coolant System and Connection Systems - Section 05.02 Integrity of Reactor Coolant Pressure Boundary (18 page(s), 8/30/2011)
- ML11252A690 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 05 - Reactor Coolant System and Connection Systems - Section 05.03 Reactor Vessel (6 page(s), 8/30/2011)
- ML11252A691 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 05 - Reactor Coolant System and Connection Systems - Section 05.04 Components and Subsystem Design (20 page(s), 8/30/2011)
- ML11252A692 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Appendix 06A Regulatory Guide 1.52, Section C, Compliance Assessment (2 page(s), 8/30/2011)
- ML11252A693 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Appendix 06B SRP 6.5.1, Table 6.5.1-1 Compliance Assessment (2 page(s), 8/30/2011)
- ML11252A694 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Appendix 06C Containment Debris Protection for ECCS Strainers (26 page(s), 8/30/2011)
- ML11252A695 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Appendix 06D HPCF Analysis Outlines (2 page(s), 8/30/2011)
- ML11252A696 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Appendix 06E Additional Bypass Leakage Considerations (2 page(s), 8/30/2011)
- ML11252A697 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.00 General (2 page(s), 8/30/2011)
- ML11252A698 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.01 Engineered Safety Feature Materials (2 page(s), 8/30/2011)
- ML11252A699 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.02 Containment Systems (78 page(s), 8/30/2011)
- ML11252A700 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.03 Emergency Core Cooling Systems (6 page(s), 8/30/2011)
- ML11252A701 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.04 Habitability Systems (2 page(s), 8/30/2011)
- ML11252A702 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.05 Fission Products Removal and Control Systems (2 page(s), 8/30/2011)
- ML11252A703 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.06 Pre and Inservice Insp. and Testing of Class 2 and 3 Comp. and Piping (8 page(s), 8/30/2011)
- ML11252A704 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 06 - Engineered Safety Features - Section 06.07 High Pressure Nitrogen Gas Supply System (2 page(s), 8/30/2011)
- ML11252A705 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Appendix 7A Design Response to App. B, ABWR LRB Instrumentation and Controls (22 page(s), 8/30/2011)
- ML11252A706 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Appendix 7B Implementation Requirements for Hardware-Software Development (2 page(s), 8/30/2011)
- ML11252A707 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Appendix 07C Def. Against Common-Mode Failure in Safety-Rel., Software-Based I&C Systems (6 page(s), 8/30/2011)
- ML11252A708 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Appendix 07DS Digital Instrumentation and Control Design Verification for Safety-Related (28 page(s), 8/30/2011)
- ML11252A709 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.01 Introduction (20 page(s), 8/30/2011)
- ML11252A710 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.01S Site Specific I&C Platforms (10 page(s), 8/30/2011)
- ML11252A711 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.02 Reactor Protection (Trip) System - Instrumentation and Controls (22 page(s), 8/30/2011)
- ML11252A712 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.03 Engineered Safety Feature Systems, I&C (38 page(s), 8/30/2011)
- ML11252A713 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.04 Systems Required for Safe Shutdown (12 page(s), 8/30/2011)
- ML11252A714 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.05 Information Systems Important to Safety (12 page(s), 8/30/2011)
- ML11252A715 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.06 Other Instrumentation Systems Required for Safety (20 page(s), 8/30/2011)
- ML11252A716 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.06S Interlock Systems Important to Safety (2 page(s), 8/30/2011)
- ML11252A717 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.07 Control Systems Not Required for Safety (58 page(s), 8/30/2011)
- ML11252A718 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.08 COL License Information (4 page(s), 8/30/2011)
- ML11252A719 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.08S Diverse I&C Systems (2 page(s), 8/30/2011)
- ML11252A720 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 07 - I&C Systems - Section 07.09S Data Communication Systems (12 page(s), 8/30/2011)
- ML11252A721 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 08 - Electric Power - Appendix 08A Miscellaneous Electrical Systems (4 page(s), 8/30/2011)
- ML11252A722 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 08 - Electric Power - Section 08.01 Introduction (6 page(s), 8/30/2011)
- ML11252A723 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 08 - Electric Power - Section 08.02 Offsite Power Systems (26 page(s), 8/30/2011)
- ML11252A724 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 08 - Electric Power - Section 08.03 Onsite Power Systems (28 page(s), 8/30/2011)
- ML11252A725 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 08 - Electric Power - Section 08.04S Station Blackout (2 page(s), 8/30/2011)
- ML11252A726 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Appendix 09A Fire Hazards Analysis (164 page(s), 8/30/2011)
- ML11252A727 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Appendix 09B Summary of Analysis Supporting Fire Protection Design Requirements (2 page(s), 8/30/2011)
- ML11252A728 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Appendix 09C Regulatory Guide 1.52, Section C, Compliance Assessment (2 page(s), 8/30/2011)
- ML11252A729 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Appendix 09D SRP 6.5.1, Table 6.5.1-1 Compliance Assessment (2 page(s), 8/30/2011)
- ML11252A730 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Appendix 09E Fire Related Administrative Controls (22 page(s), 8/30/2011)
- ML11252A731 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Section 09.01 Auxiliary Systems (78 page(s), 8/30/2011)
- ML11252A732 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Section 09.02 Water Systems (94 page(s), 8/30/2011)
- ML11252A733 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Section 09.03 Process Auxiliaries (10 page(s), 8/30/2011)
- ML11252A734 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Section 09.04 Air Conditioning, Heating, Cooling and Ventilating Systems (36 page(s), 8/30/2011)
- ML11252A735 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 09 - Auxiliary Systems - Section 09.05 Other Auxiliary Systems (30 page(s), 8/30/2011)
- ML11252A736 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 10 - Steam and Power Conversion System - Section 10.01 Summary Description (8 page(s), 8/30/2011)
- ML11252A738 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 10 - Steam and Power Conversion System - Section 10.02 Turbine Generator (24 page(s), 8/30/2011)
- ML11252A739 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 10 - Steam and Power Conversion System - Section 10.03 Main Steam Supply System (6 page(s), 8/30/2011)
- ML11252A740 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 10 - Steam and Power Conversion System - Section 10.04 Other Features of Steam and Power Conversion (28 page(s), 8/30/2011)
- ML11252A741 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 11 - Radioactive Waste Management - Appendix 11A Radioactive Waste Management - Additional Information (2 page(s), 8/30/2011)
- ML11252A742 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 11 - Radioactive Waste Management - Section 11.01 Source Terms (2 page(s), 8/30/2011)
- ML11252A743 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 11 - Radioactive Waste Management - Section 11.02 Liquid Waste Management System (26 page(s), 8/30/2011)
- ML11252A744 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 11 - Radioactive Waste Management - Section 11.03 Gaseous Waste Management System (16 page(s), 8/30/2011)
- ML11252A745 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 11 - Radioactive Waste Management - Section 11.04 Solid Waste Management System (20 page(s), 8/30/2011)
- ML11252A746 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 11 - Radioactive Waste Management - Section 11.05 Process and Effluent Radiological Monitoring and Sampling Systems (18 page(s), 8/30/2011)
- ML11252A747 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 11 - Radioactive Waste Management - Section 11.06 Offsite Radiological Monitoring Program (2 page(s), 8/30/2011)
- ML11252A748 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Appendix 12A Appendix 12A Calculation of Airborne Radionuclides (2 page(s), 8/30/2011)
- ML11252A749 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Appendix 12B Spent Fuel Pool Geometry and Dose Rate Calculation (12 page(s), 8/30/2011)
- ML11252A750 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Section 12.01 Ensuring that Occupational Radiation Exposures are ALARA (4 page(s), 8/30/2011)
- ML11252A751 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Section 12.02 Radiation Sources (50 page(s), 8/30/2011)
- ML11252A752 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Section 12.03 Radiation Protection Design Features (22 page(s), 8/30/2011)
- ML11252A753 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Section 12.04 Dose Assessment (4 page(s), 8/30/2011)
- ML11252A754 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Section 12.05 Health Physics Program (2 page(s), 8/30/2011)
- ML11252A755 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 12 - Radiation Protection - Section 12.05S Operational Radiation Protection Program (2 page(s), 8/30/2011)
- ML11252A756 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.01 Organizational Structure of Applicant (22 page(s), 8/30/2011)
- ML11252A757 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.02 Training (2 page(s), 8/30/2011)
- ML11252A758 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.03 Emergency Planning (2 page(s), 8/30/2011)
- ML11252A759 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.04 Review and Audit (2 page(s), 8/30/2011)
- ML11252A760 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.04S Operational Program Implementation (8 page(s), 8/30/2011)
- ML11252A761 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.05 Plant Procedures (14 page(s), 8/30/2011)
- ML11252A762 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.06 Physical Security (2 page(s), 8/30/2011)
- ML11252A763 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 13 - Conduct of Operations - Section 13.07 Fitness For Duty (2 page(s), 8/30/2011)
- ML11252A764 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 14 - Initial Test Program - Section 14.00S Verification Programs (2 page(s), 8/30/2011)
- ML11252A765 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 14 - Initial Test Program - Section 14.01 Specific Information to be Included in Preliminary Safety Analysis Reports (2 page(s), 8/30/2011)
- ML11252A766 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 14 - Initial Test Program - Section 14.01S Specific Information to be Addressed For the Initial Plant Test Program (2 page(s), 8/30/2011)
- ML11252A767 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 14 - Initial Test Program - Section 14.02 Specific Information to be Included in Final Safety Analysis Reports (26 page(s), 8/30/2011)
- ML11252A768 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 14 - Initial Test Program - Section 14.02S Initial Plant Test Program (10 page(s), 8/30/2011)
- ML11252A769 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 14 - Initial Test Program - Section 14.03 Tier 1 Selection Criteria and Processes (2 page(s), 8/30/2011)
- ML11252A770 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 14 - Initial Test Program - Section 14.03S Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) (2 page(s), 8/30/2011)
- ML11252A771 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Appendix 15A Plant Nuclear Safety Operational Analysis (NSOA) (24 page(s), 8/30/2011)
- ML11252A772 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Appendix 15B Failure Modes and Effects Analysis (FMEA) (4 page(s), 8/30/2011)
- ML11252A773 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Appendix 15C Not Used (2 page(s), 8/30/2011)
- ML11252A774 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Appendix 15D Probability Analysis of Pressure Regulator Downscale Failure (2 page(s), 8/30/2011)
- ML11252A775 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Appendix 15E ATWS Performance Evaluation (4 page(s), 8/30/2011)
- ML11252A776 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Appendix 15F LOCA Inventory Curves (2 page(s), 8/30/2011)
- ML11252A777 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.00 Accident and Analysis (2 page(s), 8/30/2011)
- ML11252A778 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.01 Decrease in Reactor Coolant Temperature (2 page(s), 8/30/2011)
- ML11252A779 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.01S Transient and Accident Classification (2 page(s), 8/30/2011)
- ML11252A780 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.02 Increase in Reactor Pressure (2 page(s), 8/30/2011)
- ML11252A781 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.03 Decrease in Reactor Coolant System Flow Rate (2 page(s), 8/30/2011)
- ML11252A782 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.04 Reactivity and Power Distribution Anomalies (2 page(s), 8/30/2011)
- ML11252A783 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.05 Increase in Reactor Coolant Inventory (2 page(s), 8/30/2011)
- ML11252A784 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.06 Decrease in Reactor Coolant Inventory (6 page(s), 8/30/2011)
- ML11252A785 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.07 Radioactive Release from Subsystems and Components (4 page(s), 8/30/2011)
- ML11252A786 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 15 - Accident and Analysis - Section 15.08 Anticipated Transients Without Scram (2 page(s), 8/30/2011)
- ML11252A787 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 16 - Technical Specifications (2 page(s), 8/30/2011)
- ML11252A788 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 16 - Technical Specifications - Section 16.01 Use and Application (2 page(s), 8/30/2011)
- ML11252A789 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 16 - Technical Specifications - Section 16.02 Safety Limits (SLs) (8 page(s), 8/30/2011)
- ML11252A790 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 16 - Technical Specifications - Section 16.03 Limiting Condition for Operation (LCO) Applicability (504 page(s), 8/30/2011)
- ML11252A791 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 16 - Technical Specifications - Section 16.04 Design Features (4 page(s), 8/30/2011)
- ML11252A792 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 16 - Technical Specifications - Section 16.05 Administrative Controls (22 page(s), 8/30/2011)
- ML11252A793 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 17 - Quality Assurance - Section 17.00 Introduction (2 page(s), 8/30/2011)
- ML11252A794 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 17 - Quality Assurance - Section 17.01 Quality Assurance During Design and Construction (2 page(s), 8/30/2011)
- ML11252A796 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 17 - Quality Assurance - Section 17.02 Quality Assurance During the Operations Phase (2 page(s), 8/30/2011)
- ML11252A797 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 17 - Quality Assurance - Section 17.03 Reliability Assurance Program During Design Phase (2 page(s), 8/30/2011)
- ML11252A798 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 17 - Quality Assurance - Section 17.04S Reliability Assurance Program (16 page(s), 8/30/2011)
- ML11252A799 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 17 - Quality Assurance - Section 17.05S Quality Assurance Program Guidance (2 page(s), 8/30/2011)
- ML11252A800 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 17 - Quality Assurance - Section 17.06S Maintenance Rule Program (2 page(s), 8/30/2011)
- ML11252A801 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18A Emergency Procedure Guidelines (4 page(s), 8/30/2011)
- ML11252A802 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18B Differences Between BWROG EPG Revision 4 and ABWR EPG (4 page(s), 8/30/2011)
- ML11252A803 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18C Operator Interface Equipment Characterization (4 page(s), 8/30/2011)
- ML11252A804 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18D Emergency Procedures Guidelines - Input Data and Calculation Results (2 page(s), 8/30/2011)
- ML11252A805 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18E ABWR Human-System Interface Design Implementation Process (2 page(s), 8/30/2011)
- ML11252A806 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18F Emergency Operation Information and Controls (2 page(s), 8/30/2011)
- ML11252A807 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18G Design Development and Validation Testing (2 page(s), 8/30/2011)
- ML11252A808 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Appendix 18H Supporting Analysis for Emergency Operation Information and Controls (2 page(s), 8/30/2011)
- ML11252A809 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.01 Introduction (2 page(s), 8/30/2011)
- ML11252A810 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.02 Design Goals and Design Bases (2 page(s), 8/30/2011)
- ML11252A811 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.03 Planning, Development, and Design (2 page(s), 8/30/2011)
- ML11252A812 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.04 Control Room Standard Design Features (4 page(s), 8/30/2011)
- ML11252A813 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.05 Remote Shutdown System (2 page(s), 8/30/2011)
- ML11252A814 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.06 Systems Integration (2 page(s), 8/30/2011)
- ML11252A815 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.07 Detailed Design of the Operator Interface System (2 page(s), 8/30/2011)
- ML11252A816 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 18 - Human Factors Engineering - Section 18.08 COL License Information (6 page(s), 8/30/2011)
- ML11252A817 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19A Resp. to CP-ML Rule 10 CFR 50.34(f) (6 page(s), 8/30/2011)
- ML11252A818 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19B Resolution of Appl. Unresolved and Generic Safety Issues (8 page(s), 8/30/2011)
- ML11252A819 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19C Design Considerations Reducing Sabotage Risk (2 page(s), 8/30/2011)
- ML11252A820 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19D Probabilistic Evaluations (2 page(s), 8/30/2011)
- ML11252A821 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19E Deterministic Evaluations (20 page(s), 8/30/2011)
- ML11252A822 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19EA Direct Containment Heating (2 page(s), 8/30/2011)
- ML11252A823 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19EB Fuel Coolant Interactions (2 page(s), 8/30/2011)
- ML11252A824 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19EC Debris Coolability and Core Concrete Interaction (2 page(s), 8/30/2011)
- ML11252A825 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19ED Corium Shield (2 page(s), 8/30/2011)
- ML11252A826 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19EE Suppression Pool Bypass (2 page(s), 8/30/2011)
- ML11252A827 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19F Containment Ultimate Strength (2 page(s), 8/30/2011)
- ML11252A828 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19FA Containment Ultimate Strength (2 page(s), 8/30/2011)
- ML11252A829 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19G Not Used (2 page(s), 8/30/2011)
- ML11252A830 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19H Seismic Capacity Analysis (4 page(s), 8/30/2011)
- ML11252A831 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19I Seismic Margins Analysis (2 page(s), 8/30/2011)
- ML11252A832 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19J Not Used (2 page(s), 8/30/2011)
- ML11252A833 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19K PRA-Based Reliability and Maintenance (18 page(s), 8/30/2011)
- ML11252A834 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19L ABWR Shutdown Risk Evaluation (6 page(s), 8/30/2011)
- ML11252A835 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19M Fire Protection Probabilistic Risk Assessment (4 page(s), 8/30/2011)
- ML11252A836 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - App 19N Analy. of Common-Cause Failure of Multiplex Essential Comm. Equip (18 page(s), 8/30/2011)
- ML11252A837 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19O Not Used (2 page(s), 8/30/2011)
- ML11252A838 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19P Evaluation of Potential Modifications to the ABWR Design (2 page(s), 8/30/2011)
- ML11252A840 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19Q ABWR Shutdown Risk Assessment (12 page(s), 8/30/2011)
- ML11252A841 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19QA Fault Trees (2 page(s), 8/30/2011)
- ML11252A842 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19QB DHR Reliability Study (2 page(s), 8/30/2011)
- ML11252A843 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - App 19QC Review of Sig. Shutdown Events Elect. PWR and Decay Heat Removal (2 page(s), 8/30/2011)
- ML11252A844 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19R Probabilistic Flooding Analysis (24 page(s), 8/30/2011)
- ML11252A845 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Appendix 19S Aircraft Impact Assessment (2 page(s), 8/30/2011)
- ML11252A846 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.01 Purpose and Summary (2 page(s), 8/30/2011)
- ML11252A848 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.01S Additional Information to Support the COL Application (24 page(s), 8/30/2011)
- ML11252A849 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.02 Introduction (40 page(s), 8/30/2011)
- ML11252A850 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.03 Internal Event Analysis (6 page(s), 8/30/2011)
- ML11252A851 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.04 External Event Analysis and Shutdown Risk Analysis (4 page(s), 8/30/2011)
- ML11252A852 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.04S PRA Maintenance (4 page(s), 8/30/2011)
- ML11252A853 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.05 Source Term Sensitivity Studies (2 page(s), 8/30/2011)
- ML11252A854 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.06 Measurement Against Goals (2 page(s), 8/30/2011)
- ML11252A855 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.07 PRA as a Design Tool (2 page(s), 8/30/2011)
- ML11252A856 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.08 Important Features Identified by the ABWR PRA (6 page(s), 8/30/2011)
- ML11252A857 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.09 COL License Information (18 page(s), 8/30/2011)
- ML11252A858 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.10 Assumptions and Insights Rel. to Sys. Outside Design Cert. (2 page(s), 8/30/2011)
- ML11252A859 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.11 Human Action Overview (2 page(s), 8/30/2011)
- ML11252A860 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.12 Input to the Reliability Assurance Program (2 page(s), 8/30/2011)
- ML11252A861 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 19 - Resp. to Severe Accident Policy Statement - Section 19.13 Summary of Insights Gained from the PRA (2 page(s), 8/30/2011)
- ML11252A862 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 20 - Question and Response Guide (2 page(s), 8/30/2011)
- ML11252A863 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 1-18 (18 page(s), 8/30/2011)
- ML11252A864 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 19-32 (14 page(s), 8/30/2011)
- ML11252A865 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 33-48 (16 page(s), 8/30/2011)
- ML11252A866 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 49-76 (28 page(s), 8/30/2011)
- ML11252A867 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 77-104 (28 page(s), 8/30/2011)
- ML11252A868 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 105-132 (28 page(s), 8/30/2011)
- ML11252A869 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 133-157 (25 page(s), 8/30/2011)
- ML11252A870 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 158-178 (21 page(s), 8/30/2011)
- ML11252A871 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 179-207 (29 page(s), 8/30/2011)
- ML11252A872 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 208-231 (24 page(s), 8/30/2011)
- ML11252A873 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 232-251 (20 page(s), 8/30/2011)
- ML11252A874 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 252-274 (23 page(s), 8/30/2011)
- ML11252A875 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 275-283 (9 page(s), 8/30/2011)
- ML11252A876 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 284-312 (29 page(s), 8/30/2011)
- ML11252A877 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 313-335 (23 page(s), 8/30/2011)
- ML11252A878 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 336-348 (13 page(s), 8/30/2011)
- ML11252A879 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 349-370 (22 page(s), 8/30/2011)
- ML11252A880 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 371-390 (20 page(s), 8/30/2011)
- ML11252A881 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 391-404 (14 page(s), 8/30/2011)
- ML11252A882 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 405-432 (28 page(s), 8/30/2011)
- ML11252A883 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 433-452 (20 page(s), 8/30/2011)
- ML11252A884 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Chapter 21 - Large-Scale Drawings - Pages 453-466 (14 page(s), 8/30/2011)
- ML11252A885 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 6 - Tier 2 - Table of Contents (8 page(s), 8/30/2011)