United States Nuclear Regulatory Commission - Protecting People and the Environment

Terry Jackson

Mr. Jackson current serves as the Chief of Quality Assurance Vendor Inspection Branch 1 in the Office of New Reactors.  Prior to this assignment, he served as the Chief of the Instrumentation, Controls, and Electronics Engineering Branch 1 in the Office of New Reactors, where his branch was responsible for the instrumentation and control system safety review for the AP1000, U.S. EPR, and APR-1400 designs.  He also served as the chair for the EPR I&C Technical Expert Subgroup within the Multinational Design Evaluation Program (MDEP).  Prior to his current position, he served as Resident Inspector (2001 – 2005) and Senior Resident Inspector (2005 – 2007) at the Diablo Canyon Power Plant.  Mr. Jackson joined the agency in 1993 through the U.S. NRC Graduate Fellowship Program as a Digital Instrumentation and Control Engineer in the NRC’s Office of Research.  He is currently a licensed electrical engineer in the State of California.
Page Last Reviewed/Updated Friday, June 09, 2017