Home > NRC Library > ADAMS Public Documents
Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report. Package 1 of 3. Also, see Packages ML17089A435 and ML17093A812.
Accession Number: ML17089A430
Date Released: Wednesday, April 5, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16314A101 - Donald C. Cook Nuclear Plant Units 1 & 2 - 10 CFR 50.71(e) Update and Related Site Change Reports. (36 page(s), 10/24/2016)
- ML16336A225 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Figure 1-1, Standard Symbols. (1 page(s), 10/24/2016)
- ML16336A227 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.3-1, Plot Plan. (1 page(s), 10/24/2016)
- ML16336A228 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.3-1A, Key Plan. (1 page(s), 10/24/2016)
- ML16336A238 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.3-11, Standard Symbols. (1 page(s), 10/24/2016)
- ML16336A239 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Figures. (1 page(s), 10/24/2016)
- ML16336A240 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Tables. (1 page(s), 10/24/2016)
- ML16336A241 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Revision History. (3 page(s), 10/24/2016)
- ML16336A242 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Comparison Of Design Parameters. (22 page(s), 10/24/2016)
- ML16336A243 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, References, Table 1.6-1. (21 page(s), 10/24/2016)
- ML16336A245 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary. (20 page(s), 10/24/2016)
- ML16336A246 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Section 1.4. (48 page(s), 10/24/2016)
- ML16336A247 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Section 1-0 - Introduction and Summary. (24 page(s), 10/24/2016)
- ML16336A280 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 1990 Population Distribution Figure, Figure 2.1-5. (1 page(s), 10/24/2016)
- ML16336A281 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 1990 Population Distribution 0-5 Miles, Figure 2.1-6. (1 page(s), 10/24/2016)
- ML16336A282 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 1990 Population Distribution 5-60 Miles, Figure 2.1-6a. (1 page(s), 10/24/2016)
- ML16336A284 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 1990 Population Distribution 10-60 Miles, Figure 2.1-6b. (1 page(s), 10/24/2016)
- ML16336A285 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 2000 Population Distribution 0-5 Miles, Figure 2.1-7. (1 page(s), 10/24/2016)
- ML16336A286 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 2000 Population Distribution 5-60 Miles, Figure 2.1-7a. (1 page(s), 10/24/2016)
- ML16336A287 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 2000 Population Distribution 10-60 Miles, Figure 2.1-7b. (1 page(s), 10/24/2016)
- ML16336A288 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 2037 Population Distribution 0-5 Miles, Figure 2.1-8. (1 page(s), 10/24/2016)
- ML16336A289 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 2037 Population Distribution 5-60 Miles, Figure 2.1-8a. (1 page(s), 10/24/2016)
- ML16336A290 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 2037 Population Distribution 10-60 Miles, Figure 2.1-8b. (1 page(s), 10/24/2016)
- ML16336A291 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 1972 Diary Cattle Distribution 0 - 10 Miles, Low Population Zone 0 - 2 Miles, Figure 2.1-9. (1 page(s), 10/24/2016)
- ML16336A292 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, 1971 Transient Population Distribution within Population Center Distance 0-8 Miles, Figure 2.1-10. (1 page(s), 10/24/2016)
- ML16336A293 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-1, Meteorological Tower. (1 page(s), 10/24/2016)
- ML16336A294 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-2, Tornados in the State of Michigan. (1 page(s), 10/24/2016)
- ML16336A295 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-3, Main Tower Wind Rose, January - December 1992. (1 page(s), 10/24/2016)
- ML16336A297 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-4, Main Tower Wind Rose, January - March 1992. (1 page(s), 10/24/2016)
- ML16336A298 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-5, Main Tower Wind Rose, April - June 1992. (1 page(s), 10/24/2016)
- ML16336A299 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-6, Main Tower Wind Rose, July - September 1992. (1 page(s), 10/24/2016)
- ML16336A300 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-7, Main Tower Wind Rose, October - December 1992. (1 page(s), 10/24/2016)
- ML16336A301 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-8, Shoreline Tower Wind Rose, January - December 1992. (1 page(s), 10/24/2016)
- ML16336A302 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-9, Shoreline Tower Wind Rose, January - March 1992. (1 page(s), 10/24/2016)
- ML16336A303 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-10, Shoreline Tower Wind Rose, April - June 1992. (1 page(s), 10/24/2016)
- ML16336A304 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-11, Shoreline Tower Wind Rose, July - September 1992. (1 page(s), 10/24/2016)
- ML16336A305 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-12, Shoreline Tower Wind Rose, October - December 1992. (1 page(s), 10/24/2016)
- ML16336A306 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-13. (1 page(s), 10/24/2016)
- ML16336A308 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-14. (1 page(s), 10/24/2016)
- ML16336A309 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-15. (1 page(s), 10/24/2016)
- ML16336A310 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-16. (1 page(s), 10/24/2016)
- ML16336A311 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-17. (1 page(s), 10/24/2016)
- ML16336A312 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-18. (1 page(s), 10/24/2016)
- ML16336A313 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-19. (1 page(s), 10/24/2016)
- ML16336A314 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-20. (1 page(s), 10/24/2016)
- ML16336A315 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-21. (1 page(s), 10/24/2016)
- ML16336A316 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-22. (1 page(s), 10/24/2016)
- ML16336A317 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-23, Monitoring Site Locations. (1 page(s), 10/24/2016)
- ML16336A318 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.3-1, Regional Tectonic Map. (1 page(s), 10/24/2016)
- ML16336A319 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.3-2, Geologic Cross-Section. (1 page(s), 10/24/2016)
- ML16336A320 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-1, Epicentral Location Map. (1 page(s), 10/24/2016)
- ML16336A321 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-1a, Map of Plant Site. (1 page(s), 10/24/2016)
- ML16336A322 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-2, Recommened Response Spectra Operating Basis Eathquake. (1 page(s), 10/24/2016)
- ML16336A323 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3, Recommended Response Spectra Design Basis Earthquake. (1 page(s), 10/24/2016)
- ML16336A324 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3a, Site Spectra vs Modified El Centro '34 Operating Basis Earthquake (2% Damping). (1 page(s), 10/24/2016)
- ML16336A325 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3b, Response Spectra (1/3% Damping) Cook Auxiliary Building Floor EL. 650'-0 Operating Basis Earthquake. (1 page(s), 10/24/2016)
- ML16336A327 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3c, Response Spectra (1/2%) Damping) Cook Auxiliary Building Floor EL. 633'-0" Operating Basis Earthquake. (1 page(s), 10/24/2016)
- ML16336A328 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3d, Response Spectra (1/2% Damping) Cook Diesel Generator Building Floor EL. 609'-0" Operating Basis Earthquake. (1 page(s), 10/24/2016)
- ML16336A329 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3e, Response Spectra (1/3% Damping) Cook Auxiliary Building Floor EL. 587'-0 Operating Basis Earthquake. (1 page(s), 10/24/2016)
- ML16336A330 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3f. (1 page(s), 10/24/2016)
- ML16336A332 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3g. (1 page(s), 10/24/2016)
- ML16336A333 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3h. (1 page(s), 10/24/2016)
- ML16336A334 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3i. (1 page(s), 10/24/2016)
- ML16336A336 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3j. (1 page(s), 10/24/2016)
- ML16336A337 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-1. (1 page(s), 10/24/2016)
- ML16336A338 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-2. (1 page(s), 10/24/2016)
- ML16336A339 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-3. (1 page(s), 10/24/2016)
- ML16336A340 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-4. (1 page(s), 10/24/2016)
- ML16336A341 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-5. (1 page(s), 10/24/2016)
- ML16336A342 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-6. (1 page(s), 10/24/2016)
- ML16336A343 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-7. (1 page(s), 10/24/2016)
- ML16336A344 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-8. (1 page(s), 10/24/2016)
- ML16336A345 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-9. (1 page(s), 10/24/2016)
- ML16336A346 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-10. (1 page(s), 10/24/2016)
- ML16336A347 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-11. (1 page(s), 10/24/2016)
- ML16336A348 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.6-12. (1 page(s), 10/24/2016)
- ML16336A349 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-1, Regional Features. (1 page(s), 10/24/2016)
- ML16336A350 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-2, Local Features. (1 page(s), 10/24/2016)
- ML16336A351 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-3, Topographic Map of Site. (1 page(s), 10/24/2016)
- ML16336A352 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-4, Topographic View of Plant Site. (1 page(s), 10/24/2016)
- ML16336A353 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-4a. (1 page(s), 10/24/2016)
- ML16336A354 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-4B. (1 page(s), 10/24/2016)
- ML16336A355 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figures. (1 page(s), 10/24/2016)
- ML16336A356 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Tables. (1 page(s), 10/24/2016)
- ML16336A357 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-1, Population Trends of the Counties Surrounding The Donald C. Cook Nuclear Plant Site. (1 page(s), 10/24/2016)
- ML16336A358 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-2, Population Trends of Cities and Townships in Berrien County, Michigan. (2 page(s), 10/24/2016)
- ML16336A359 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-3, Population Centers of 25,000 or More Within 60 Miles of the Donald C. Cook Nuclear Plant Site. (1 page(s), 10/24/2016)
- ML16336A360 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-5, Population Distribution (1975). (1 page(s), 10/24/2016)
- ML16336A361 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-6, Population Distribution (1990). (1 page(s), 10/24/2016)
- ML16336A362 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-6A, Population Distribution (1990). (1 page(s), 10/24/2016)
- ML16336A363 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-7, Projected Population Distribution (2000). (1 page(s), 10/24/2016)
- ML16336A364 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-7A, Projected Population Distribution (2000). (1 page(s), 10/24/2016)
- ML16336A365 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-8, Projected Population Distribution (2037). (1 page(s), 10/24/2016)
- ML16336A366 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-8A. (1 page(s), 10/24/2016)
- ML16336A368 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, table 2.1-8B. (1 page(s), 10/24/2016)
- ML16336A370 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-9. (1 page(s), 10/24/2016)
- ML16336A372 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-12. (1 page(s), 10/24/2016)
- ML16336A374 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-1. (2 page(s), 10/24/2016)
- ML16336A376 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-2. (2 page(s), 10/24/2016)
- ML16336A377 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-3. (1 page(s), 10/24/2016)
- ML16336A378 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-4. (1 page(s), 10/24/2016)
- ML16336A379 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-5. (1 page(s), 10/24/2016)
- ML16336A381 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-6, Annual Joint Frequency Distribution - 2005 - 10 m Shoreline Tower - Pasquill Class D. (1 page(s), 10/24/2016)
- ML16336A382 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-7, Annual Joint Frequency Distribution - 2005 - 10 m Shoreline Tower - Pasquill Class E. (1 page(s), 10/24/2016)
- ML16336A384 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-8. (1 page(s), 10/24/2016)
- ML16336A385 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-9, Annual Joint Frequency Distribution - 2005 - 10 m Shoreline Tower - Pasquill Class G. (1 page(s), 10/24/2016)
- ML16336A386 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-10. (1 page(s), 10/24/2016)
- ML16336A387 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-11, Offsite Atmospheric Dispersion Factors. (1 page(s), 10/24/2016)
- ML16336A388 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-12, Control Room Atmospheric Dispersion Factors. (3 page(s), 10/24/2016)
- ML16336A389 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-13. (1 page(s), 10/24/2016)
- ML16336A390 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-14, Hours at Each Wind Speed and Direction. (1 page(s), 10/24/2016)
- ML16336A391 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-15, Hours at Each Wind Speed and Direction. (1 page(s), 10/24/2016)
- ML16336A392 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-16, Hours at Each Wind Speed and Direction. (1 page(s), 10/24/2016)
- ML16336A393 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-17, Hours at Each Wind Speed and Direction. (1 page(s), 10/24/2016)
- ML16336A394 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-18. (1 page(s), 10/24/2016)
- ML16336A395 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-19. (1 page(s), 10/24/2016)
- ML16336A396 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-20, Hours at Each Wind Speed and Direction. (1 page(s), 10/24/2016)
- ML16336A397 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.5-1. (1 page(s), 10/24/2016)
- ML16336A398 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.6-1. (2 page(s), 10/24/2016)
- ML16336A399 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.6-2, Bibliography of Reports Produced as Part of the Pre-Operational and Operational or Technical Specification, Appendix B, ..... (5 page(s), 10/24/2016)
- ML16336A400 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.6-3. (2 page(s), 10/24/2016)
- ML16336A401 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.6-4, Common and Scientific Names of Fish Species Collected from Cook Plant Study Areas, Southeastern Lake Michigan, 1973-1982. (2 page(s), 10/24/2016)
- ML16336A402 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.6-5, Common Names and Total Number of Each Species Impinged During 1975-1982 at the D.C. Cook Nuclear Plant Southeastern Lake Michigan. (4 page(s), 10/24/2016)
- ML16336A404 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.6-6, Estimates (In Millions) of Annual Entrainment Losses of Fish Larvae and Fish at the D.C. Cook Nuclear Plant, Southeastern..... (3 page(s), 10/24/2016)
- ML16336A405 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.9-1, Conditions/Effects Considered. (1 page(s), 10/24/2016)
- ML16336A406 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.9-2, (Part A) Loading Conditions and Stress Limits: Pressure Vessels. (5 page(s), 10/24/2016)
- ML16336A407 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Section 2.0 - Site and Environment. (92 page(s), 10/24/2016)
- ML16336A517 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Cover Page for Chapter 3 (U1) Figures. (1 page(s), 10/24/2016)
- ML16336A518 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Cover Page for Chapter 3 (U2) Figures. (1 page(s), 10/24/2016)
- ML16336A519 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 (U1), Unit 1 Reactor. (122 page(s), 10/24/2016)
- ML16336A520 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 (U2), Unit 2 Reactor. (184 page(s), 10/24/2016)
- ML16336A529 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.2.1-1. (3 page(s), 10/24/2016)
- ML16336A530 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3.1-2. (1 page(s), 10/24/2016)
- ML16336A531 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3.1-3. (1 page(s), 10/24/2016)
- ML16336A532 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.4.1-1. (2 page(s), 10/24/2016)
- ML16336A533 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.4.1-2. (1 page(s), 10/24/2016)
- ML16336A534 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.4.1-3. (1 page(s), 10/24/2016)
- ML16336A535 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.1-1. (1 page(s), 10/24/2016)
- ML16336A537 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.1-2. (1 page(s), 10/24/2016)
- ML16336A538 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.1-3. (1 page(s), 10/24/2016)
- ML16336A539 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.1-3A. (1 page(s), 10/24/2016)
- ML16336A540 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.2-1. (1 page(s), 10/24/2016)
- ML16336A541 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.2-2. (1 page(s), 10/24/2016)
- ML16336A542 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.2-3. (1 page(s), 10/24/2016)
- ML16336A543 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3.1-1. (3 page(s), 10/24/2016)
- ML16336A544 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.1-1. (2 page(s), 10/24/2016)
- ML16336A545 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.5.3-1. (3 page(s), 10/24/2016)
- ML16336A550 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3(UI), Tables. (1 page(s), 10/24/2016)
- ML16336A551 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 (U2), Tables. (1 page(s), 10/24/2016)
- ML16336A558 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.1-1. (8 page(s), 10/24/2016)
- ML16336A559 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.1-2. (2 page(s), 10/24/2016)
- ML16336A560 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.1-3. (1 page(s), 10/24/2016)
- ML16336A561 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.2-1. (1 page(s), 10/24/2016)
- ML16336A562 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3-1. (4 page(s), 10/24/2016)
- ML16336A563 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3-2. (2 page(s), 10/24/2016)
- ML16336A564 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3-3. (1 page(s), 10/24/2016)
- ML16336A565 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3-4. (1 page(s), 10/24/2016)
- ML16336A566 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3-6. (1 page(s), 10/24/2016)
- ML16336A567 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.4-1. (4 page(s), 10/24/2016)
- ML16336A568 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.4-2. (1 page(s), 10/24/2016)
- ML16336A569 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.4-3. (2 page(s), 10/24/2016)
- ML16336A570 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Table 3.4-4. (2 page(s), 10/24/2016)
- ML16336A581 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-1. (1 page(s), 10/24/2016)
- ML16336A582 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-2. (1 page(s), 10/24/2016)
- ML16336A583 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-3. (1 page(s), 10/24/2016)
- ML16336A584 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-4. (1 page(s), 10/24/2016)
- ML16336A585 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1.5, Core Barrel Assembly. (1 page(s), 10/24/2016)
- ML16336A586 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Upper Core Support Structure, Figure 3.2.1-6. (1 page(s), 10/24/2016)
- ML16336A587 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-7. (1 page(s), 10/24/2016)
- ML16336A588 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-8. (1 page(s), 10/24/2016)
- ML16336A589 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Fuel Assembly Outline, Figure 3.2.1-9. (3 page(s), 10/24/2016)
- ML16336A590 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-10. (1 page(s), 10/24/2016)
- ML16336A591 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-11. (1 page(s), 10/24/2016)
- ML16336A592 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-12. (1 page(s), 10/24/2016)
- ML16336A593 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-13. (1 page(s), 10/24/2016)
- ML16336A594 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-14. (1 page(s), 10/24/2016)
- ML16336A595 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.1-15. (1 page(s), 10/24/2016)
- ML16336A596 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-1. (1 page(s), 10/24/2016)
- ML16336A597 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-2. (1 page(s), 10/24/2016)
- ML16336A598 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-3. (1 page(s), 10/24/2016)
- ML16336A599 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-4. (1 page(s), 10/24/2016)
- ML16336A600 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-11. (1 page(s), 10/24/2016)
- ML16336A601 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-12. (1 page(s), 10/24/2016)
- ML16336A602 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-13. (1 page(s), 10/24/2016)
- ML16336A603 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-14. (1 page(s), 10/24/2016)
- ML16336A604 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-15. (1 page(s), 10/24/2016)
- ML16336A605 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-16. (1 page(s), 10/24/2016)
- ML16336A606 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1-17. (1 page(s), 10/24/2016)
- ML16336A607 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-1. (1 page(s), 10/24/2016)
- ML16336A608 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-2. (1 page(s), 10/24/2016)
- ML16336A609 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-3. (1 page(s), 10/24/2016)
- ML16336A610 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-4. (1 page(s), 10/24/2016)
- ML16336A611 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-4a. (1 page(s), 10/24/2016)
- ML16336A612 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-5. (1 page(s), 10/24/2016)
- ML16336A613 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-6. (1 page(s), 10/24/2016)
- ML16336A614 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-7. (1 page(s), 10/24/2016)
- ML16336A615 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-8. (1 page(s), 10/24/2016)
- ML16336A616 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4.1-9. (1 page(s), 10/24/2016)
- ML16336A617 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.5.1-1. (1 page(s), 10/24/2016)
- ML16336A618 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5.1-2. (1 page(s), 10/24/2016)
- ML16336A619 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5.1-3. (1 page(s), 10/24/2016)
- ML16336A620 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.5.1-4. (1 page(s), 10/24/2016)
- ML16336A621 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5.1-5. (1 page(s), 10/24/2016)
- ML16336A622 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.5.1-6. (1 page(s), 10/24/2016)
- ML16336A623 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5.1-7. (1 page(s), 10/24/2016)
- ML16336A624 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5.1-8. (1 page(s), 10/24/2016)
- ML16336A625 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.5.2-1. (1 page(s), 10/24/2016)
- ML16336A626 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5.2-2. (1 page(s), 10/24/2016)
- ML16336A627 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.5.3-1. (1 page(s), 10/24/2016)
- ML16336A629 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5.3-2. (1 page(s), 10/24/2016)
- ML16336A647 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3. (1 page(s), 10/24/2016)
- ML16336A648 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Plan View, Figure 3.2-4. (1 page(s), 10/24/2016)
- ML16336A649 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Top Grid to Thimble Attachment, Figure 3.2-5. (1 page(s), 10/24/2016)
- ML16336A650 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Grid to Thimble Attachment Joints, Figure 3.2-5A. (1 page(s), 10/24/2016)
- ML16336A651 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Top Nozzle to Thimble Attachment, Figure 3.2-6. (1 page(s), 10/24/2016)
- ML16336A652 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Guide Thimble to Bottom nozzle Joint, Figure 3.2-7. (1 page(s), 10/24/2016)
- ML16336A653 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Typical Core Barrel Assembly, Figure 3.2-8. (1 page(s), 10/24/2016)
- ML16336A654 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Upper Core Support Structure, Figure 3.2-9. (1 page(s), 10/24/2016)
- ML16336A655 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Plan View of Upper Core Support Structure, Figure 3.2-10. (1 page(s), 10/24/2016)
- ML16336A656 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Typical Full Length Rod Cluster Control and Drive Rod Assembly with Interfacing Components, Figure 3.2-11. (1 page(s), 10/24/2016)
- ML16336A657 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Full Length Rod Cluster Control Assembly Outline, Figure 3.2-12. (1 page(s), 10/24/2016)
- ML16336A658 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Full Length Absorber Rod, Figure 3.2-13. (1 page(s), 10/24/2016)
- ML16336A659 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Typical Burnable Poison Assembly, Figure 3.2-15A. (1 page(s), 10/24/2016)
- ML16336A660 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Wet Annular Burnable Absorber (WABA Assembly), Figure 3.2-15B. (1 page(s), 10/24/2016)
- ML16336A661 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Typical Burnable Poison Rod Cross Section, Figure 3.2-16A. (1 page(s), 10/24/2016)
- ML16336A662 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, BA Rod Cross Section (Wet Annular Burnable Absorber), Figure 3.2-16B. (1 page(s), 10/24/2016)
- ML16336A663 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Primary Source Assembly, Figure 3.2-17. (1 page(s), 10/24/2016)
- ML16336A664 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Secondary Source Assembly, Figure 3.2-18. (1 page(s), 10/24/2016)
- ML16336A665 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Thimble Plug Assembly, Figure 3.2-19. (1 page(s), 10/24/2016)
- ML16336A666 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Full Length Control Rod Drive Mechanism, Figure 3.2-20. (1 page(s), 10/24/2016)
- ML16336A667 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Full Length Rod Drive Mechanism Schematic, Figure 3.2-21. (1 page(s), 10/24/2016)
- ML16336A668 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23 - Nominal Latch Clearance at Minimum and Maximum Temperature. (1 page(s), 10/24/2016)
- ML16336A669 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2.24 - Control Rod Drive Mechanism Latch Clearance Thermal Effect. (1 page(s), 10/24/2016)
- ML16336A670 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-1 - Typical Axial Zoning of Uranium Enrichment and IFBA Poisoning. (1 page(s), 10/24/2016)
- ML16336A671 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-2 - Example Low Leakage Fuel Loading Arrangement. (1 page(s), 10/24/2016)
- ML16336A672 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-3 - Typical Production and Consumption of Higher Isotopes. (1 page(s), 10/24/2016)
- ML16336A673 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-4 - Example IFBA Arrangements Within an Assembly. (1 page(s), 10/24/2016)
- ML16336A674 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-5 - Example IFBA Loading Pattern. (1 page(s), 10/24/2016)
- ML16336A675 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-6 - Example Boron Concentration Over Cycle Length. (1 page(s), 10/24/2016)
- ML16336A677 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-7 - Typical Normalized Power Density Distribution At Beginning-of-Life Unrodded Core, Hot Full Power, No Xenon. (1 page(s), 10/24/2016)
- ML16336A678 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-8. (1 page(s), 10/24/2016)
- ML16336A679 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-9 - Typical Normalized Power Density Distribution Near Beginning-Of-Life Group D At Insertion Limit, Hot Full Power, Equilibrium Xenon. (1 page(s), 10/24/2016)
- ML16336A680 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-10 - Typical Normalized Power Density Distribution At Middle-Of-Life Unrodded Core, Hot Full Power, Equilibrium Xenon. (1 page(s), 10/24/2016)
- ML16336A681 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-11 - Typical Normalized Power Density Distribution Near End-Of-Life Unrodded Core, Hot Full Power, Equilibrium Xenon. (1 page(s), 10/24/2016)
- ML16336A682 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-12 - Typical Rodwise Power Distribution In A Typical Assembly (Assembly G-12) Near Beginning-Of-Life, Hot Full Power, Equilibrium..... (1 page(s), 10/24/2016)
- ML16336A683 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-13 - Typical Rodwise Power Distribution In A Typical Assembly (Assembly G-12) Near End-Of-Life, Hot Full Power Equilibrium Xenon..... (1 page(s), 10/24/2016)
- ML16336A684 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.314 - Example Axial Power Shapes Occurring at BOL. (1 page(s), 10/24/2016)
- ML16336A685 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-15 - Example Axial Power Shapes Occurring At MOL. (1 page(s), 10/24/2016)
- ML16336A686 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-16 - Example Axial Power Shapes Occurring At EOL. (1 page(s), 10/24/2016)
- ML16336A687 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-20 - Maximum F(Z) X Power Versus Axial Height (Z) During Normal Operation. (1 page(s), 10/24/2016)
- ML16336A688 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-21 - Typical Peak Linear Power During Control Rod Malfunction Overpower Transients. (1 page(s), 10/24/2016)
- ML16336A689 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Typical Peak Linear Power During Boration/Dilution Overpower Transients. (1 page(s), 10/24/2016)
- ML16336A690 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-23. (1 page(s), 10/24/2016)
- ML16336A691 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-24. (1 page(s), 10/24/2016)
- ML16336A692 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-25. (1 page(s), 10/24/2016)
- ML16336A693 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-26. (1 page(s), 10/24/2016)
- ML16336A694 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-27. (1 page(s), 10/24/2016)
- ML16336A695 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-28. (1 page(s), 10/24/2016)
- ML16336A696 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-29. (1 page(s), 10/24/2016)
- ML16336A697 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-30. (1 page(s), 10/24/2016)
- ML16336A698 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-31. (1 page(s), 10/24/2016)
- ML16336A699 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-32. (1 page(s), 10/24/2016)
- ML16336A700 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-33. (1 page(s), 10/24/2016)
- ML16336A701 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-34. (1 page(s), 10/24/2016)
- ML16336A702 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-35. (1 page(s), 10/24/2016)
- ML16336A703 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3-36 - Axial Offset Versus Time PWR Core with a 12-Ft Height and 121 Assemblies. (1 page(s), 10/24/2016)
- ML16336A704 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.3-37 - XY Xenon Test Thermocouple Response Quadrant Tilt Difference Versus Time. (1 page(s), 10/24/2016)
- ML16336A705 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.3-38 - Calculated and Measured Doppler Defect and Coefficients at BOL Two-Loop Plant, 121 Assemblies, 12-Ft Core. (1 page(s), 10/24/2016)
- ML16336A706 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-1 - Thermal Conductivity of U02 (Data Corrected to 95% Theoretical Density). (1 page(s), 10/24/2016)
- ML16336A708 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-2 - Measured Versus Predicted Critical Heat Flux URB2 Correlation. (1 page(s), 10/24/2016)
- ML16336A710 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-3 - TDC Versus Reynolds Number for 26" Grid Spacing. (1 page(s), 10/24/2016)
- ML16336A711 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-4 - Normalized Radial Flow and Enthalpy Distribution at 4-Ft Elevation. (1 page(s), 10/24/2016)
- ML16336A712 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-5 - Normalized Radial Flow and Enthalpy Distribution at 8-Ft Elevation. (1 page(s), 10/24/2016)
- ML16336A713 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-6 - Normalized Radial Flow and Enthalpy Distribution at 12-Ft Elevation - Core Exit. (1 page(s), 10/24/2016)
- ML16336A714 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-7 - Void Fraction Versus Thermodynamic Quality. (1 page(s), 10/24/2016)
- ML16336A715 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.4-6 - Normalized Radial Flow and Enthalpy Distribution at 12-Ft Elevation - Core Exit. (1 page(s), 10/24/2016)
- ML16336A716 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4-9. (1 page(s), 10/24/2016)
- ML16336A717 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4-10. (1 page(s), 10/24/2016)
- ML16336A718 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4-11. (1 page(s), 10/24/2016)
- ML16336A719 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4-12. (1 page(s), 10/24/2016)
- ML16336A720 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4-13. (1 page(s), 10/24/2016)
- ML16336A721 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4-14. (1 page(s), 10/24/2016)
- ML16336A722 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1. (1 page(s), 10/24/2016)
- ML16336A723 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Update Final Safety Analysis Report, Chapter 3, Figure 3.2-2. (1 page(s), 10/24/2016)
- ML16336A724 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3. (1 page(s), 10/24/2016)
- ML16340A075 - Donald C. Cook Nuclear Plant, Unit 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4 - Figures. (1 page(s), 10/24/2016)
- ML16340A076 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Tables. (1 page(s), 10/24/2016)
- ML16340A077 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System, Section 4.1. (15 page(s), 10/24/2016)
- ML16340A078 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Section 4.2, System Design and Operation. (30 page(s), 10/24/2016)
- ML16340A079 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Sections 4.3 and 4.4. (25 page(s), 10/24/2016)
- ML16340A080 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Section 4.5, Tests and Inspections. (24 page(s), 10/24/2016)
- ML16340A087 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.1-1, System Design and Operating Parameters. (2 page(s), 10/24/2016)
- ML16340A088 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.1-2, Reactor Coolant System Design Pressure Settings. (1 page(s), 10/24/2016)
- ML16340A089 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.1-3, Reactor Vessel Design Data. (2 page(s), 10/24/2016)
- ML16340A090 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.1-4, Pressurizer and Pressurizer Relief Tank Design Data. (2 page(s), 10/24/2016)
- ML16340A091 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.1-7, Reactor Coolant Piping Design Parameters. (1 page(s), 10/24/2016)
- ML16340A092 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Pressurizer Valves Design Parameters, Table 4.1-8. (1 page(s), 10/24/2016)
- ML16340A093 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System Design Pressure Drop, Table 4.1-9. (1 page(s), 10/24/2016)
- ML16340A094 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Design Thermal and Loading Cycles, Table 4.1-10. (3 page(s), 10/24/2016)
- ML16340A095 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System Design Pressure Settings, Table 4.1-2. (1 page(s), 10/24/2016)
- ML16340A097 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor Vessel Design Data, Table 4.1-3. (1 page(s), 10/24/2016)
- ML16340A098 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Pressurizer and Pressurizer Relief Tank Design Data, Table 4.1-4. (1 page(s), 10/24/2016)
- ML16340A099 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Steam Generator Design Data, Table 4.1-5. (2 page(s), 10/24/2016)
- ML16340A100 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant Pumps Design Data, Table 4.1-6. (2 page(s), 10/24/2016)
- ML16340A101 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant Piping Design Parameters, Table 4.1-7. (1 page(s), 10/24/2016)
- ML16340A103 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Summary of Plant Outage For Yankee-Rowe(1964 - 1969), Table 4.1-11. (3 page(s), 10/24/2016)
- ML16340A104 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.1-12, Unit 1 and Unit 2 - Reactor Coolant System Codes. (2 page(s), 10/24/2016)
- ML16340A106 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.1-13, Component Transient Limits. (1 page(s), 10/24/2016)
- ML16340A107 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.2-1, Materials of Construction of the Reactor Coolant System Components. (2 page(s), 10/24/2016)
- ML16340A108 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.2-2, Reactor Coolant Water Chemistry Specification. (1 page(s), 10/24/2016)
- ML16340A109 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.3-1, Summary of Estimated Primary Plus Secondary Stress Intensity for Components of the Reactor Vessel (Unit 1). (1 page(s), 10/24/2016)
- ML16340A110 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.3-2, Summary of Estimated Cumulative Fatigue Usage Factors for Components of the Reactor Vessel (Unit 1). (1 page(s), 10/24/2016)
- ML16340A111 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Table 4.5-1, Reactor Coolant System Quality Control Program. (4 page(s), 10/24/2016)
- ML16341A766 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-1-1. (1 page(s), 10/24/2016)
- ML16341A767 - Donald C. Cook Nuclear Plant, Unit 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-1. (1 page(s), 10/24/2016)
- ML16341A768 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-1A. (1 page(s), 10/24/2016)
- ML16341A769 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-2. (1 page(s), 10/24/2016)
- ML16341A770 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-2A. (1 page(s), 10/24/2016)
- ML16341A771 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-3. (1 page(s), 10/24/2016)
- ML16341A772 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-4. (1 page(s), 10/24/2016)
- ML16341A773 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-4A. (1 page(s), 10/24/2016)
- ML16341A774 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-4B. (1 page(s), 10/24/2016)
- ML16341A775 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-4C. (1 page(s), 10/24/2016)
- ML16341A776 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-4D, Unit 1 Model 51R Replacement Steam Generator, B&W Lattice Grid Tube Support. (1 page(s), 10/24/2016)
- ML16341A777 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-4E, Unit 1 Model 51R Replacement Steam Generator, Tubesheet Blowdown Configuration. (1 page(s), 10/24/2016)
- ML16341A778 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-5, Reactor Coolant Pump. (1 page(s), 10/24/2016)
- ML16341A779 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-6. (1 page(s), 10/24/2016)
- ML16341A780 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-7. (1 page(s), 10/24/2016)
- ML16341A781 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-8. (1 page(s), 10/24/2016)
- ML16341A782 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-9. (1 page(s), 10/24/2016)
- ML16341A783 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.3-1. (1 page(s), 10/24/2016)
- ML16341A784 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.3-2. (1 page(s), 10/24/2016)
- ML16341A785 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.3-3. (1 page(s), 10/24/2016)
- ML16341A786 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.5-1. (1 page(s), 10/24/2016)
- ML16341A788 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.5-2. (1 page(s), 10/24/2016)
- ML16341A789 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.5-3. (1 page(s), 10/24/2016)
- ML16341A822 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Containment System. Page 1 of 195. (209 page(s), 10/24/2016)
- ML16341A826 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report. Chapter 5, Tables. (1 page(s), 10/24/2016)
- ML16341A844 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.1-1 - Potential Missiles Considered In Class I (Seismic) Structure Design. Page 1 of 2. (2 page(s), 10/24/2016)
- ML16341A845 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-1 - Wind Velocities And Velocity Pressures. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341A846 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-2 - Site Soil Resistivity Measurements Data Taken April 10 And 11, 1969. Page 1 of 3. (3 page(s), 10/24/2016)
- ML16341A847 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-3 - Electrical Penetration - Prototype Tests Penetrations. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341A849 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-4 - Table Of Damping Values. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341A850 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-5 - Summary Of Analyses-Jet Forces Impacting On Internal Structures. Page 1 of 2. (2 page(s), 10/24/2016)
- ML16341A851 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-6 - Summary Of Dynamic Motions. (1 page(s), 10/24/2016)
- ML16341A852 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-7 - Dynamic Rotations. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341A853 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-8 - Containment Internal Structural Element Design Pressures. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341A854 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.2-1 - Ice Condenser Design Parameters. Page 1 of 1. (16 page(s), 10/24/2016)
- ML16341A855 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.2-1 - Ice Condenser Design Parameters. Page 1 of 2. (2 page(s), 10/24/2016)
- ML16341A856 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.4-1 - Ice Condenser Allowable Limits. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341A859 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table: 5.3.5.1-1 - Summary Of Results For Wear Slab Structural Analysis. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341A860 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.2-1, Summary of Results for Wall Panels. (1 page(s), 10/24/2016)
- ML16341A862 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.2-2, Summary of Results for Wall Panel Transverse Beam Stress. (1 page(s), 10/24/2016)
- ML16341A863 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.3-1, Summary of Stress Results for Lattice Frame. (1 page(s), 10/24/2016)
- ML16341A864 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.3-2, Summary of Results of Fatigue Analysis for Lattice Frame. (1 page(s), 10/24/2016)
- ML16341A865 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.6-1, Summary of Results for Member Stresses in Lower Support Structure Compared to Design Allowable Member Stresses. (2 page(s), 10/24/2016)
- ML16341A866 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.8-1, Summary of Stress Results for Lower Personnel Access Door Analyses Due to LOCA. (1 page(s), 10/24/2016)
- ML16341A867 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.9-1, Summary of Results for Inlet Door Structural Analysis - LOCA. (1 page(s), 10/24/2016)
- ML16341A868 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.10-1, Summary of Results for Top Deck Door Structural Analysis - LOCA. (1 page(s), 10/24/2016)
- ML16341A869 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.10-2, Summary of Results for Top Deck Structure (Stress Levels Within the Ice Condenser). (1 page(s), 10/24/2016)
- ML16341A870 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.10-3, Summary of Results for Intermediate Deck and Door Assembly Structural Analysis - LOCA. (1 page(s), 10/24/2016)
- ML16341A871 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.3.5.12-1, Summary of Results for Air Handling Unit Support Beams (A500 GR B Steel). (1 page(s), 10/24/2016)
- ML16341A872 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.4-1, Unit 1 Containment Penetration Isolation Barriers. (27 page(s), 10/24/2016)
- ML16341A874 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.8-1, Containment Regional Designation/Igniter Assembly Locations - Unit 1. (2 page(s), 10/24/2016)
- ML16341A876 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Table 5.8-2, Igniter Assembly Locations - Unit 2. (2 page(s), 10/24/2016)
- ML16341A883 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figures. (1 page(s), 10/24/2016)
- ML16341A891 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2.11. (1 page(s), 10/24/2016)
- ML16341A892 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2.11A. (1 page(s), 10/24/2016)
- ML16341A894 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-6. (1 page(s), 10/24/2016)
- ML16341A895 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-6A. (1 page(s), 10/24/2016)
- ML16341A896 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-6B. (1 page(s), 10/24/2016)
- ML16341A897 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-6C. (1 page(s), 10/24/2016)
- ML16341A898 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-6D. (1 page(s), 10/24/2016)
- ML16341A899 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.5-1. (1 page(s), 10/24/2016)
- ML16341A900 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.5-3. (1 page(s), 10/24/2016)
- ML16341A901 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.6-1. (1 page(s), 10/24/2016)
- ML16341A902 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-1 (1 page(s), 10/24/2016)
- ML16341A903 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-2. (1 page(s), 10/24/2016)
- ML16341A905 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-3. (1 page(s), 10/24/2016)
- ML16341A906 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-4. (1 page(s), 10/24/2016)
- ML16341A907 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-5. (1 page(s), 10/24/2016)
- ML16341A911 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-3. (1 page(s), 10/24/2016)
- ML16341A912 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-4. (1 page(s), 10/24/2016)
- ML16341A913 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-4A. (1 page(s), 10/24/2016)
- ML16341A914 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-4B. (1 page(s), 10/24/2016)
- ML16341A915 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-5. (1 page(s), 10/24/2016)
- ML16341A916 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-7. (1 page(s), 10/24/2016)
- ML16341A918 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-8. (1 page(s), 10/24/2016)
- ML16341A919 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-9. (1 page(s), 10/24/2016)
- ML16341A920 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-10. (1 page(s), 10/24/2016)
- ML16341A928 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-10A. (1 page(s), 10/24/2016)
- ML16341A929 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-12. (1 page(s), 10/24/2016)
- ML16341A930 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-12A. (1 page(s), 10/24/2016)
- ML16341A932 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-13 (Legend for Figures 5.2.2-14 to 5.2.2-50). (1 page(s), 10/24/2016)
- ML16341A933 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-14. (1 page(s), 10/24/2016)
- ML16341A934 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-15. (1 page(s), 10/24/2016)
- ML16341A935 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-16. (1 page(s), 10/24/2016)
- ML16341A936 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-17. (1 page(s), 10/24/2016)
- ML16341A937 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-18. (1 page(s), 10/24/2016)
- ML16341A938 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-19. (1 page(s), 10/24/2016)
- ML16341A939 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-20. (1 page(s), 10/24/2016)
- ML16341A940 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-21. (1 page(s), 10/24/2016)
- ML16341A941 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-22. (1 page(s), 10/24/2016)
- ML16341A942 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-23. (1 page(s), 10/24/2016)
- ML16341A943 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-24. (1 page(s), 10/24/2016)
- ML16341A944 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-25. (1 page(s), 10/24/2016)
- ML16341A946 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-26. (1 page(s), 10/24/2016)
- ML16341A947 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-27, (1 page(s), 10/24/2016)
- ML16341A948 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-28. (1 page(s), 10/24/2016)
- ML16341A949 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-29. (1 page(s), 10/24/2016)
- ML16341A950 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-30. (1 page(s), 10/24/2016)
- ML16341A951 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-31. (1 page(s), 10/24/2016)
- ML16341A952 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-32. (1 page(s), 10/24/2016)
- ML16341A953 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-33. (1 page(s), 10/24/2016)
- ML16341A954 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-34. (1 page(s), 10/24/2016)
- ML16341A955 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-35. (1 page(s), 10/24/2016)
- ML16341A956 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-36. (1 page(s), 10/24/2016)
- ML16341A957 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-37. (1 page(s), 10/24/2016)
- ML16341A960 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-38. (1 page(s), 10/24/2016)
- ML16341A961 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-39. (1 page(s), 10/24/2016)
- ML16341A962 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-40. (1 page(s), 10/24/2016)
- ML16341A963 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-41. (1 page(s), 10/24/2016)
- ML16341A964 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-42. (1 page(s), 10/24/2016)
- ML16341A965 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-43 (1 page(s), 10/24/2016)
- ML16341A966 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-44. (1 page(s), 10/24/2016)
- ML16341A967 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-45. (1 page(s), 10/24/2016)
- ML16341A969 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-46. (1 page(s), 10/24/2016)
- ML16341A970 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-47. (1 page(s), 10/24/2016)
- ML16341A971 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-48. (1 page(s), 10/24/2016)
- ML16341A972 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-49. (1 page(s), 10/24/2016)
- ML16341A973 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-50. (1 page(s), 10/24/2016)
- ML16341A974 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-51. (1 page(s), 10/24/2016)
- ML16341A975 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-51A. (1 page(s), 10/24/2016)
- ML16341A976 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-51B. (1 page(s), 10/24/2016)
- ML16341A977 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-51C, Plan-Missile Shield Cover On Top Of Reactor Cavity. (1 page(s), 10/24/2016)
- ML16341A978 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-51D, Missile Shield Cover-Reine Beam 1& 4, Section B-B. (1 page(s), 10/24/2016)
- ML16341A979 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-51E, Anchorage Assembly Of Missile Shield Cover. (1 page(s), 10/24/2016)
- ML16341A980 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-52, Removable Bulkheads Separating the Reactor Cavity from The Refueling Canal. (1 page(s), 10/24/2016)
- ML16341A981 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-52A, Removable Bulkheads Separating the Reactor Cavity from The Refueling Canal. (1 page(s), 10/24/2016)
- ML16341A983 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-53, Structural Barrier. (1 page(s), 10/24/2016)
- ML16341A984 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-54, Typical Section Loading Distribution. (1 page(s), 10/24/2016)
- ML16341A985 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.26.2-1, Loading Diagram of Upper Crane Wall. (1 page(s), 10/24/2016)
- ML16341A986 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-54B, Loading Diagram of 22.5 PSI of Pressurizer Enclosure. (1 page(s), 10/24/2016)
- ML16341A987 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-55, Typical Cover Without Concrete. (1 page(s), 10/24/2016)
- ML16341A988 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-55A, Typical Section of Cover. (1 page(s), 10/24/2016)
- ML16341A989 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-56, Jet load Locations Plan & Sects. (1 page(s), 10/24/2016)
- ML16341A990 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-56A, Jet Load Locations Sections. (1 page(s), 10/24/2016)
- ML16341A991 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-57, Distribution of Soil Reaction Beneath Containment Units. (1 page(s), 10/24/2016)
- ML16341A994 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-57A, Distribution of Soil Reaction Beneath Containment Units. (1 page(s), 10/24/2016)
- ML16341A995 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-58, Combination. (1 page(s), 10/24/2016)
- ML16341A996 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-58A, Combination. (1 page(s), 10/24/2016)
- ML16341A997 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-59, Liner At reactor Pool. (1 page(s), 10/24/2016)
- ML16341A998 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-59A, Liner Junction - Wall and Fdn. Slab. (1 page(s), 10/24/2016)
- ML16341B000 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-59B, Development of Crane Wall (Inside Face). (1 page(s), 10/24/2016)
- ML16341B002 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-59C, Containment Building. (1 page(s), 10/24/2016)
- ML16341B003 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-59D. (1 page(s), 10/24/2016)
- ML16341B004 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-59E, Containment Building Shear Recess & Uplift Anchor of Crane Wall. (1 page(s), 10/24/2016)
- ML16341B005 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-60B. (1 page(s), 10/24/2016)
- ML16341B006 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-60C. (1 page(s), 10/24/2016)
- ML16341B008 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-61. (1 page(s), 10/24/2016)
- ML16341B009 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-63, Containment Building. (1 page(s), 10/24/2016)
- ML16341B010 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-64. (1 page(s), 10/24/2016)
- ML16341B011 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-65, Containment Building Equipment Access Opening. (1 page(s), 10/24/2016)
- ML16341B012 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2.2-65A, Containment Building Personnel Access Opening. (1 page(s), 10/24/2016)
- ML16341B013 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.2-1, Isometric of Ice Condenser. (1 page(s), 10/24/2016)
- ML16341B014 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.1-1, Floor Structure. (1 page(s), 10/24/2016)
- ML16341B015 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.1-2, Ice Condenser Inlet Region Drain Arrangement. (1 page(s), 10/24/2016)
- ML16341B016 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.10-1, Top Deck Door Assembly. (1 page(s), 10/24/2016)
- ML16341B017 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.10-2, Intermediate Deck Door Assembly. (1 page(s), 10/24/2016)
- ML16341B018 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.12-1, Ice Condenser Refrigeration Units No. 1 & 2, Sheet 1 of 2. (1 page(s), 10/24/2016)
- ML16341B019 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.12-1A, Units No. 1 or 2, Sheet 2 of 2. (1 page(s), 10/24/2016)
- ML16341B020 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.12-2, Refrigerant Cycle Diagram. (1 page(s), 10/24/2016)
- ML16341B021 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.12-3, Glycol Cycle to Each Containment. (1 page(s), 10/24/2016)
- ML16341B022 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.12-4, Schematic Flow Diagram of Air Cooling Cycle. (1 page(s), 10/24/2016)
- ML16341B023 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.2-1, Ice Condenser Wall Panels. (1 page(s), 10/24/2016)
- ML16341B024 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.3-1, Typical Lattice Frame. (1 page(s), 10/24/2016)
- ML16341B025 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.4-1, Typical Ice Basket Assembly. (1 page(s), 10/24/2016)
- ML16341B026 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.8-1, Horizontal Through Section of Lower Personnel Access Door. (1 page(s), 10/24/2016)
- ML16341B027 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.9-1, Typical Ice Condenser Door Frame Section. (1 page(s), 10/24/2016)
- ML16341B028 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.9-2, Inlet Door Panel Assembly. (1 page(s), 10/24/2016)
- ML16341B029 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.9-3, Inlet Door Frame Assembly. (1 page(s), 10/24/2016)
- ML16341B030 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.5-2, Containment Ventilation Units No. 1 or 2, Sheet 2 of 2. (1 page(s), 10/24/2016)
- ML16341B031 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.7-1, Computed Strains. (1 page(s), 10/24/2016)
- ML16341B032 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.7-2, Computed Displacement. (1 page(s), 10/24/2016)
- ML16341B033 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.8-1. (1 page(s), 10/24/2016)
- ML16341B034 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.8-2. (1 page(s), 10/24/2016)
- ML16341B035 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.8-3. (1 page(s), 10/24/2016)
- ML16341B036 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.8-4. (1 page(s), 10/24/2016)
- ML16341B078 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (50 page(s), 10/24/2016)
- ML16341B079 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Tables. (1 page(s), 10/24/2016)
- ML16341B083 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table: 6.1-1, Net Positive Suction Heads for Post-DBA Operational Pumps. (1 page(s), 10/24/2016)
- ML16341B084 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3-2, Containment Spray Heat Exchanger Design Parameters. (2 page(s), 10/24/2016)
- ML16341B085 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3-4, Containment Spray System Malfunction Analysis. (2 page(s), 10/24/2016)
- ML16341B086 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-1 - Safety Injection System Code Requirements. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341B087 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-2 - Accumulator Design Parameters. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341B088 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-3 Boron Injection Tank Design Parameters. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341B089 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-4 - Refueling Water Storage Tank Design parameters. Page 1 of 1. (1 page(s), 10/24/2016)
- ML16341B090 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-5, Design Parameters - ECCS Pump. (1 page(s), 10/24/2016)
- ML16341B091 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-6, Single Active Failure Analysis Emergency Core Cooling System Recirculation Phase. (3 page(s), 10/24/2016)
- ML16341B092 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-7, Single Passive Failure Analysis - Emergency Core Cooling System Recirculation Phase. (1 page(s), 10/24/2016)
- ML16341B093 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-8, Accumulator Inleakage. (1 page(s), 10/24/2016)
- ML16341B095 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-9, Recirculation Loop Leakage. (1 page(s), 10/24/2016)
- ML16341B096 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table: 6.2-10, Recirculation Sump Component Design Load Combinations. (1 page(s), 10/24/2016)
- ML16341B097 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3-1, Containment Spray Pump Design Parameters. (1 page(s), 10/24/2016)
- ML16341B098 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3-3, Spray Additive Tank Design Parametters. (1 page(s), 10/24/2016)
- ML16341B131 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figures. (1 page(s), 10/24/2016)
- ML16341B159 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-1 - Flow Diagram EMERG. Core Cooling (SIS). (1 page(s), 10/24/2016)
- ML16341B162 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-2 - Range of Core Protection Provided by Various Components of the Emergency Core cooling System. (1 page(s), 10/24/2016)
- ML16341B164 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-3 - Equivalent Break Diameter. (1 page(s), 10/24/2016)
- ML16341B166 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.3-1 - Containment Spray. (1 page(s), 10/24/2016)
- ML16341B168 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, (Figure 6.2-1A & Figure 9.3-1 - Emergency Core Cooling (RHR). (1 page(s), 10/24/2016)
- ML16341B215 - Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control. (90 page(s), 10/24/2016)