Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Research Information Letters – 2023

Document Number Title Publish Date
RIL 2023-11 Proceedings of the High Energy Arc Faulting (HEAF) Workshop 11/03/2023
RIL 2023-10 Report on High Energy Arch Fault Experiments, Photometrics Report for Medium Voltage Bus Duct and Switchgear Enclosures 11/03/2023
RIL 2023-09 An Assessment of the Harmonics Effects on Undervoltage Relays in Nuclear Power Plants 02/01/2024
RIL 2023-08 Seismic Source Characterization in the Central and Eastern United States 12/15/2023
RIL 2023-07 Report on High Energy Arcing Fault Experiments – Experimental Results from Medium-Voltage Bus Duct and Switchgear Enclosures 09/29/2023
RIL 2023-06, ANL-18/08 Steam Generator Inspection Reliability Assessments on Primary Side Cracking in U-Bends 10/17/2023
RIL 2023-06 Literature Review: Safety Review Process for Space Nuclear System Launches 09/29/2023
RIL 2023-05 Proceedings the Eighth Annual Proceedings of the Eighth Annual Probabilistic Flood Hazard Assessment Research Workshop 10/19/2023
RIL 2023-04 Paleoliquefaction Studies of the Central Virginia Seismic Zone 04/12/2023
RIL 2023-03 Magnitude Conversion and Earthquake Recurrence Rate Models for the Central and Eastern United States 04/03/2023
RIL 2023-01 Predicting High Energy Arcing Fault Zones of Influence for Aluminum Using an Arc Flash Modeling Approach 02/10/2023

To top of page

Page Last Reviewed/Updated Friday, February 02, 2024

Page Last Reviewed/Updated Friday, February 02, 2024