Assessment of TRACE 5.0 Against ROSA-2 Test 5, Main Steam Line Break with Steam Generator Tube Rupture (NUREG/IA-0505)

File Title
Revision 1 Assessment of TRACE 5.0 Against ROSA-2 Test 5, Main Steam Line Break with Steam Generator Tube Rupture (NUREG/IA-0505, Revision 1)
Initial Assessment of TRACE 5.0 Against ROSA-2 Test 5, Main Steam Line Break with Steam Generator Tube Rupture (NUREG/IA-0505)

Page Last Reviewed/Updated Tuesday, March 09, 2021