The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

IBLOCA Analysis for Vandellòs-NPP Using RELAP5/MOD3.3. Sensitivity Calculations to EOP Actions (NUREG/IA-0497)

On this page:

Download complete document

Publication Information

Manuscript Completed: January 2018
Date Published: February 2019

Prepared by:
M. Pérez-Ferrgut, J. Freixa, F. Reventós and I. Sol

Department of Physics
Universitat Politècnica de Catalunya
ETSEIB, Av. Diagonal 647, Pav. C
08028 Barcelona
Spain

Kirk Tien, NRC Project Manager

Division of Systems Analysis
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
Under the Thermal-Hydraulic Code Applications and Maintenance Program (CAMP)

Published by:
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This report analyzes the effect of the plant specific EOPs for the RCPs during a hypothetical IBLOCA in Vandellòs II NPP, a 3 loop Westinghouse design reactor. The scenarios simulated are:

  • Cold leg IBLOCA simulating the rupture of an accumulators connection to the RCS;
  • Hot leg IBLOCA simulating the rupture of the pressurizer surge line connection to the RCS.

The selection of an intermediate break size conforms to the risk-informed approach for the assessment of the ECCS performance.

The RELAP5/MOD3.3 model of Vandellòs II NPP was developed by the Advanced Nuclear Technologies (ANT) group at the Universitat Politècnica de Catalunya (UPC).

Page Last Reviewed/Updated Tuesday, March 09, 2021