The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Assessment of RELAP5/MOD3.2 Against a Main Steam Isolation Valve Closure at TRILLO I Nuclear Power Plant (NUREG/IA-0172)

On this page:

Download complete document

Publication Information

Date Published: February 2000

Prepared by:
A. de Lucas, R. L. Perezagua
Empresarios Agrupados, AIE
Spain

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Code Application and Maintenance Program (CAMP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This report includes an assessment of RELAP5/MOD3.2 against a main steam line isolation at 99% power in Trillo I NPP (PWR, KWU-Siemens, 1040 MWe).

The results used are those obtained during test D-100-306 (Ref. 3), performed August 19, 1988 at Trillo I NPP.

The three plant cooling loops are simulated to take into account:

  1. A single loop containing a valve in which the disturbance occurs
  2. The remaining two loops are simulated using two separate model loops

The Trillo I model used comprises 273 control volumes, 297 junctions, 101 heat structures and 252 control variables.

From this study it can be concluded that the post-test calculation shows a reasonable agreement with the actual plant data.