The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Application of Full Power Blackout for C. N. Almaraz with RELAP5/MOD2 (NUREG/IA-0123, ICSP–AL–BOUT–R)

On this page:

Download complete document

Publication Information

Date Published: June 1993

Prepared by:
A. L. Lechas

C. N. Almaraz I y II
c/Claudio Coello, 123
28006 - Madrid, Spain

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Thermal-Hydraulic Code Assessment
and Application Program (ICAP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

The analysis group of Almaraz Nuclear Power Plant has developed a model of the plant with RELAP 5 / MOD. 2 / 36:04. This model is the result of the work-experience on the code RELAP 5 / MOD. 1 / that was the standar code during the period 1.984/1.989. Different solutions were adopted in the network to adecuate the model to RELAP 5 MOD. 2 Computer Code.

This transient was selected for ICAP because it presents an experience with the same transient calculated with RELAP 5 / MOD. 1 / CY 29 computer code. The comparison between both analysis will be interesting.