Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Application of Full Power Blackout for C. N. Almaraz with RELAP5/MOD2 (NUREG/IA-0123, ICSP–AL–BOUT–R)

On this page:

Download complete document

Publication Information

Date Published: June 1993

Prepared by:
A. L. Lechas

C. N. Almaraz I y II
c/Claudio Coello, 123
28006 - Madrid, Spain

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Thermal-Hydraulic Code Assessment
and Application Program (ICAP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

The analysis group of Almaraz Nuclear Power Plant has developed a model of the plant with RELAP 5 / MOD. 2 / 36:04. This model is the result of the work-experience on the code RELAP 5 / MOD. 1 / that was the standar code during the period 1.984/1.989. Different solutions were adopted in the network to adecuate the model to RELAP 5 MOD. 2 Computer Code.

This transient was selected for ICAP because it presents an experience with the same transient calculated with RELAP 5 / MOD. 1 / CY 29 computer code. The comparison between both analysis will be interesting.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021