SUBJECT: NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTIES - $210,000 (NRC Inspection Report Nos. 50-387 & 50-388/96-08; 96-09)

Dear Mr. Byram:

This letter refers to two NRC inspections conducted at Susquehanna Steam Electric Station between June 11, 1996, and September 9, 1996, as well as two investigations conducted by the NRC Office of Investigations (OI) at your Susquehanna nuclear facility. During the first inspection, four apparent violations of NRC requirements were identified, three of which related to a misalignment of an electrical breaker for the `E' diesel generator. Those three violations involved not having the required number of operable diesel generators, inaccurate electrical distribution surveillances, and failures to implement procedures. The fourth violation related to a non-licensed operator's failure to follow your administrative procedures for controlling the status of equipment associated with the Standby Liquid Control system. During the second inspection, one apparent violation was identified involving a single Core Spray system test line containment isolation valve being opened and deactivated for 24 hours during performance of preventive maintenance, without the required actions being taken in accordance with the Technical Specifications (TSs). The OI investigations were initiated after you had conducted internal investigations of these matters that were identified by your staff. The inspection reports and the synopsis of the first OI investigation were forwarded to you previously. The synopsis of the second OI investigation is enclosed.

Based on the investigations conducted by the NRC and your staff, the NRC has concluded that a number of nuclear plant operators (NPOs), as well as licensed operators, did not perform certain activities, yet documented that the activities had been performed. As a result of these findings, a predecisional enforcement conference (conference) was conducted with you on March 21, 1997, to discuss the violations, their causes, and your corrective actions.

Based on the information developed during the inspections and investigations, the information provided during the March 21, 1997, conference, and the information provided in your supplemental letter, dated April 9, 1997, a number of violations of NRC requirements were identified. The violations are described in detail in the enclosed Notice of Violation and Proposed Imposition of Civil Penalties (Notice).

Most of the violations are described in Section I of the enclosed Notice. Of those violations in Section I, the majority relate to an event in which one of the required four independent diesel generators was inoperable for approximately 20 days because of a circuit breaker alignment error. This inoperability was caused by the failure of a nuclear plant operator (NPO) to align the diesel generator in accordance with procedures. The supply breaker for the diesel's auxiliary equipment was removed inadvertently as a result of the operator's failure to identify the correct component before taking action while performing the alignment. Furthermore, multiple barriers that should have prevented or detected the misalignment failed. The procedure approved for use in aligning the `E' diesel generator was inadequate in that it did not specifically require that the alignment of the supply breaker for the diesel's auxiliary equipment be independently verified. In addition, although shift supervision was informed that there was a potential breaker alignment problem, no action was taken to investigate or verify the reported condition. Finally, even though the TS surveillance (designed to verify that the safety-related electrical systems were properly aligned) was performed on three separate occasions by three different NPOs, the NPOs failed to properly complete the check of the auxiliary equipment supply breaker and the misalignment went undetected for 20 days.

The NRC is particularly concerned that even though the surveillance procedure requirement to verify the alignment of the `E' diesel generator auxiliary equipment supply breaker was not performed, records were completed to indicate that the verification was performed. The completion of records without actually having conducted the activity documented in the record takes on greater significance after considering that on approximately 157 occasions between January 1996 and June 1996, more than half of your NPOs failed to perform a required panel alarm test, yet completed a record to indicate that the test was completed. In addition, on multiple occasions between January 1994 and June 1996, Shift Supervisors (SSs), signed a record indicating that they performed the required general station inspection which included an in-plant tour, when in fact, the in-plant tours in some cases were not conducted, in that the SSs did not leave the control room during those periods. In addition to the SSs, two Assistant Unit Supervisors (AUSs) performing Preventive Maintenance Worklist activities, signed off work as completed between January 1996 and June 1996 indicating that they had accompanied NPOs during their rounds, when, in fact, the individuals had not entered the plant areas during those periods necessary to accompany the NPOs.

These numerous examples of both licensed and non-licensed personnel not performing required activities, yet documenting on records that the activities were performed, raise serious questions regarding the adequacy of management and supervisory oversight at the station to ensure that management expectations were clearly communicated, understood and followed. In your April 9, 1997, letter to the NRC subsequent to the conference, you acknowledged that these conditions, that were identified and investigated by your staff, were serious regulatory and management issues. Even though no actual safety consequences resulted, management's failure to effectively communicate the expectation that activities be performed in accordance with procedures and with attention to detail, had the potential for significant safety consequences. Given the number of individuals involved in these activities, including licensed operators, the actual and potential impact on equipment operability, the duration of the problem, and the lack of management and supervisory oversight that resulted in the failure to detect this widespread condition; the violations in Section I are categorized in the aggregate as a Severity Level II problem in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600.

With respect to the violations in Section I, in accordance with the Enforcement Policy in effect at the time these violations occurred, a base civil penalty in the amount of $80,000 is considered for a Severity Level II problem. Since this issue constitutes a Severity Level II problem, the NRC would normally consider whether credit was warranted for Identification and Corrective Action in accordance with the civil penalty assessment process in Section VI.B.2 of the Enforcement Policy. Credit would normally be warranted for both factors because you identified most of these issues during your investigations, and your corrective actions were considered prompt and comprehensive. Those corrective actions included: (1) improvements in supervisory oversight; (2) training on the event, on the `E' diesel generator design, and on management expectations; and (3) expanded self-assessment in the Operations Department. However, this case represents particularly poor licensee performance, as evidenced by (1) the nature of the violations associated with the Severity Level II problem including the inoperability of the diesel generator for almost three weeks and the number of employees involved, (2) the extensiveness of the problem with inaccurate records; and (3) the management and supervisory failures demonstrated by these violations. Additionally, the NRC previously issued Information Notice 92-30 on April 23, 1992, and Generic Letter 93-03 on October 20, 1993, that described similar occurrences at other facilities. Your actions in response to these communications did not assure that plant personnel were properly performing their assigned duties at Susquehanna. It is not acceptable that these types of failures occurred in 1996. Therefore, notwithstanding the normal civil penalty assessment outcome, I have decided, in light of this performance, to exercise discretion in accordance with Section VII.A.1 of the Enforcement Policy and propose a civil penalty at two times the base amount.

Accordingly, to emphasize the importance of performing activities as required, maintaining accurate records of such activities, and providing appropriate control and oversight of such activities, I have been authorized, after consultation with the Director, Office of Enforcement and the Deputy Executive Director for Regulatory Effectiveness, to exercise enforcement discretion and issue the enclosed Notice of Violation and Proposed Imposition of Civil Penalties (Notice) in the total amount of $160,000 for the violations in Section I.

With respect to the violation in Section II of the Notice, a containment isolation valve in a core spray system test line was opened and deactivated for 24 hours, contrary to the TSs, and operators did not initiate action in accordance with the TSs to place the unit in an operational condition in which the TS did not apply. Since the valve in the test line was the only isolation valve in the affected penetration, none of the actions specified by TSs could be taken to isolate the penetration within 4 hours as required. Instead of taking the action required when a limiting condition for operation cannot be met, you considered the closed system boundary to meet the requirement of the operable isolation valve in the system. Even though actions were taken to ensure that this boundary remained intact, none of the additional actions required by TSs to isolate the penetration were taken. This violation of your TSs is of concern because the single isolation valve in the system was open and inoperable and, based on your interpretation, could have remained in this condition with no time constraint. Therefore, this violation is classified individually at Severity Level III in accordance with the Enforcement Policy.

With respect to the violation in Section II, in accordance with the Enforcement Policy in effect at the time this violation occurred, the base civil penalty in the amount of $50,000 is considered for a Severity Level III violation. Since PP&L has been the subject of escalated enforcement action within the last 2 years 1 , the NRC considered whether credit was warranted for Identification and Corrective Action in accordance with the civil penalty assessment process in Section VI.B.2 of the Enforcement Policy. Credit for identification is not warranted because the violation was identified by the NRC. Credit for corrective actions is warranted because your corrective actions were considered prompt and comprehensive once the violation was identified. These actions included, but were not limited to:  (1) formalizing the processes for interpretation of TSs and altering boundaries of closed systems; (2) providing training on the requirements for TS interpretations and documentation of engineering guidance; and (3) reviews to ensure that no other informal guidance was being utilized to support plant operations.

Therefore, to emphasize the importance of operating the facility in accordance with TSs, I have been authorized, after consultation with the Director, Office of Enforcement, to issue a civil penalty in the amount of $50,000.

Another violation of NRC requirements is described in Section III of the enclosed Notice and is classified individually at Severity Level IV. That violation involves a nuclear plant operator repositioning a breaker switch in a cabinet that was being controlled by a status control tag, without obtaining the permission of the individual or work group who required the tag and either Operations Shift Supervision or Operations Outage Group Supervision. This action resulted in the de-energization of heat tracing for an operable standby liquid control pump, for a period of 34 hours. At the conference, your staff indicated that the work permit indicated that there were discrepancies between the wiring diagrams and the actual wiring in the field. During a subsequent telephone conversation on April 15, 1997, Mr. J. Kenny of your staff informed Ms. T. Walker of my staff that the note indicating that there were wiring discrepancies was not added to the permit until after the event occurred. This information was considered in our assessment of this problem.

You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room (PDR). In addition, a summary of the conference that was conducted on March 21, 1997, including the slides that were used during the conference and a redacted transcript of the conference, will be placed in the PDR.

Sincerely, Hubert J. Miller Regional Administrator

Docket Nos. 50-387: 50-388
License Nos. NPF-14; NPF-22

Enclosures:
1. Notice of Violation and Proposed Imposition of Civil Penalties
2. Synopsis of OI Investigation Report No. 1-96-046

cc w/encls:
G. Jones, Vice President - Nuclear Operations
G. Kuczynski, Plant Manager
J. Kenny, Supervisor, Nuclear Licensing
G. Miller, Manager - Nuclear Engineering
R. Wehry, Nuclear Licensing
M. Urioste, Nuclear Services Manager, General Electric
C. Lopes, Manager - Nuclear Security
W. Burchill, Manager, Nuclear Safety Assessment
H. Woodeshick, Special Office of the President
J. Tilton, III, Allegheny Electric Cooperative, Inc.
Commonwealth of Pennsylvania


NOTICE OF VIOLATION
AND
PROPOSED IMPOSITION OF CIVIL PENALTIES

Pennsylvania Power and Light Company Docket Nos. 50-387; 50-388 Susquehanna Units 1 & 2 License Nos. NPF-14; NPF-22 EA Nos. 96-270; 96-347; 97-054

During NRC inspections conducted between June 11, 1996 and September 9, 1996, as well as during two OI investigations, for which one OI synopsis was forwarded to you on February 19, 1997, and for which the other OI synopsis is enclosed, violations of NRC requirements were identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the Nuclear Regulatory Commission proposes to impose civil penalties pursuant to Section 234 of the Atomic Energy Act of 1954, as amended (Act), 42 U.S.C. 2282, and 10 CFR 2.205. The particular violations and associated civil penalties are set forth below:

I. VIOLATIONS CLASSIFIED IN THE AGGREGATE AS A SEVERITY LEVEL II PROBLEM

A. Technical Specification 3.8.1.1 for Units 1 and 2 require four of the five independent diesel generators (DGs) to be operable in Operational Condition 1, 2, and 3. With one of the required diesel generators inoperable, it must be restored to an operable status within 72 hours or the units must be placed in Hot Shutdown within the next 12 hours.

Contrary to the above, between June 14, 1996, and July 4, 1996, less than four independent diesel generators were operable, and during that time, neither unit was placed in Hot Shutdown. Specifically, DG `E' was substituted for DG 'D' on June 14, 1996, that made DG 'D' inoperable. However, DG 'E' was also inoperable because of a circuit breaker alignment error made during the substitution, that resulted in removal of the circuit breaker that supplied power to the auxiliary equipment for DG 'E'.

B. Technical Specification 6.8.1 for Units 1 and 2 requires, in part, that the applicable procedures recommended in Appendix `A' of Regulatory Guide 1.33, Revision 2, February 1978, shall be established, implemented and maintained.

1. Regulatory Guide 1.33, Revision 2, February 1978, Appendix `A', Section 4.w, recommends instructions for energizing and changing modes of operation for electrical systems, including emergency power sources such as diesel generators. Operations Procedure OP-024-004, "Transfer and Test Mode Operations of Diesel Generator E," Revision 14 (a procedure established to implement Regulatory Guide 1.33), provides the instruction for the alignment of DG `E' in substitution for another diesel generator. Step 3.1.26 of OP-024-004 requires that transfer breaker OA51006 be removed and placed in the breaker cubicle for the diesel generator that will be substituted.

Contrary to the above, on June 14, 1996, a nuclear plant operator failed to align DG `E' in accordance with OP-024-004, in that breaker OA51005, the supply breaker for the diesel's auxiliary equipment, was removed, instead of transfer breaker OA51006. As a result, DG `E' was inoperable for 20 days.

2. Regulatory Guide 1.33, Revision 2, February 1978, Appendix `A', Section 1, recommends administrative procedures for equipment control, shift and relief turnover, log entries, and responsibilities for safe operation.

a. Administrative Procedure NDAP-QA-0022, "Self Checking," Revision 1 (a procedure established to implement Regulatory Guide 1.33), requires self-checking including, a step to identify the correct component, train, unit, etc, before taking action.

Contrary to the above, on June 14, 1996, a nuclear plant operator (NPO) failed to identify the correct component before taking action while aligning DG `E' in accordance with OP-024-004, in that the operator manipulated the incorrect breaker, as described in Item I.B.1, and caused DG `E' to be inoperable for 20 days.

b. Operations Instruction OI-AD-080, "Investigation of Status Control Occurrences," (a procedure established to implement Regulatory Guide 1.33), requires immediate investigation and documentation of the occurrence and that Shift Supervision will complete the investigation prior to leaving the site on the day of the occurrence. OI-AD-080 defines a category 1 status control occurrence as a plant component (valve, breaker, switch, fuse, lead, etc.) out of required position.

Contrary to the above, on June 14, 1996, Shift Supervision did not immediately initiate an investigation for a status control occurrence and did not adequately complete the investigation prior to leaving the site. Specifically, when Shift Supervision was notified by a nuclear plant operator that breaker OA51006, the DG 'E' transfer breaker, was out of its required position, no action was taken to independently investigate the occurrence or locally verify the reported condition. Additionally, the investigation was not completed before Shift Supervision left the site on June 14, 1996.

c. Administrative Procedure NDAP-QA-300, "Conduct of Operations," Revision 6, (a procedure established to implement Regulatory Guide 1.33), step 4.13.2, requires NPOs to keep the Plant Control Operator (PCO) informed of potential problems.

Contrary to the above, during the evening shift of July 3, 1996, an NPO identified potential problems on DG `E' and failed to report the problem to a PCO until the following evening shift of July 4, 1996.

d. Operations Department Administrative Procedure OP-AD-003, "Shift Routine," Revision 6, section 6.5.2 c.(3) (a procedure established to implement Regulatory Guide 1.33), requires NPOs to perform rounds in accordance with OI-AD-016, "Operator Rounds." OI-AD-016, step 4.5.1, requires NPOs to perform all checks and preventive maintenance activities identified on Plant Logs. NPO Plant Log OI-PL-0171, "Diesel Generator and ESS XFMRs," requires NPOs to perform an alarm test on panel OC577E twice per shift.

Contrary to the above, between January 1996 and June 1996, Nuclear Plant Operators failed to perform approximately 157 of the required alarm tests on panel OC577E.

e. Administrative Procedure NDAP-QA-0300, step 6.2.3, Shift Turnover, provides general requirements for this activity and references additional requirements in OP-AD-003, "Shift Routine." OP-AD-003, Revision 6, step 6.5.2, states "Shift Supervisor rounds shall consist of an in-plant tour. Shift Supervisors assigned to the night shift (1900-0700) are responsible to conduct a general station inspection nightly".

Contrary to the above, on at least 22 occasions between January 1994 and June 1996, Shift Supervisors did not complete the required general station inspection (GSI). Specifically, an in-plant tour was not completed in that the SSs did not leave the control room during their assigned shift on those occasions and; therefore, did not conduct the in-plant portion of the GSI.

3. Regulatory Guide 1.33, Revision 2, February 1978, Appendix `A', Section 8.b, recommends implementing procedures for each surveillance test, inspection, or calibration listed in the Technical Specifications. Technical Specification surveillance requirement 4.8.3.1.1 for Units 1 and 2 requires, in part, that MCC 0B565 shall be determined to be energized at least once per 7 days by verifying correct breaker alignment. Procedure SO-100-005, "Weekly Electrical Distribution Verification", Revision 12, implements the requirements of TS 4.8.3.1.1. SO-100-005, Check Sheet 2, step B.25, requires that breaker OA51005, 1E Supply to OB565, be confirmed open and racked in.

Contrary to the above, on June 20, June 27, and July 3, 1996, NPOs failed to confirm that breaker OA51005 was open and racked in. Specifically, breaker OA51005 was removed from its assigned cubicle on June 14, 1996, and was not returned to its assigned location until July 4, 1996, and the NPOs failed to identify that the breaker was not in the required position.

C. 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires that activities affecting quality be prescribed by procedures of a type appropriate to the circumstances. Implementing this requirement is the SSES Operational Quality Assurance Manual, Policy OPS-12, item 6.5.4, which requires that procedures shall require independent verifications where appropriate to ensure that procedures for control of equipment have been implemented correctly. SSES Policy Letter 89-003, Revision 3, "Verification of Component Status," requires that alignment of safety related systems for operation requires independent verification, or as an alternative, verification by system test.

Operations Procedure OP-024-004, "Transfer and Test Mode Operations of Diesel Generator E," for Units 1 and 2 provides direction for the alignment of DG `E'. Procedure SO-024-001, "Monthly Diesel Generator Operability Test," provides direction for performing a system test on the diesel generators.

Contrary to the above, on September 28, 1995, Operations Procedure OP-024-004, Revision 14, was approved for use in alignment of DG `E', and the procedure was not appropriate to the circumstances in that the procedure did not require independent verification for proper alignment of the supply breaker for the diesel's auxiliary equipment. No verification of the breaker's proper alignment is made during performance of the system test in accordance with procedure SO-024-001.

D. 10 CFR 50.9 requires, in part, that information required by the Commission's regulations to be maintained by the licensee shall be complete and accurate in all material respects.

Technical Specification 6.8.1 for Units 1 and 2 requires, in part, that the applicable procedures recommended in Appendix `A' of Regulatory Guide 1.33, Revision 2, February 1978, shall be established, implemented and maintained.

1. Regulatory Guide 1.33, Revision 2, February 1978, Appendix `A', Section 8.b, recommends implementing procedures for each surveillance test, inspection, or calibration listed in the Technical Specifications. Technical Specification surveillance requirement 4.8.3.1.1 for Units 1 and 2 requires, in part, that MCC 0B565 shall be determined to be energized at least once per 7 days by verifying correct breaker alignment. Procedure SO-100-005, "Weekly Electrical Distribution Verification," Revision 12, implements the requirements of TS 4.8.3.1.1. SO-100-005, Check Sheet 2, step B.25 requires that breaker OA51005, 1E Supply to OB565, be confirmed open and racked in. Step 7.2 of SO-100-005 requires that a completed record be maintained.

Contrary to the above, information required to be maintained by the licensee was not complete and accurate in all material respects. Specifically, on June 20, June 27, and July 3, 1996, NPOs assigned to verifying the correct breaker alignment of OA51005, the safety related supply breaker to MCC 0B565, created records to indicate that they verified that the breaker was in the correct position, and those records were inaccurate in that the individuals did not verify that the breaker was in the correct position as described in Item I.B.3. These records were material in that they provided indication that certain safety activities had been completed when in fact they had not been completed.

2. Regulatory Guide 1.33, Revision 2, February 1978, Appendix `A', Section 1, recommends administrative procedures for equipment control, shift and relief turnover, log entries, and responsibilities for safe operation. Operations Department Administrative Procedure OP-AD-003, "Shift Routine," Revision 6, Section 6.5.2 c.(3), requires NPOs to perform rounds in accordance with OI-AD-016, "Operator Rounds." OI-AD-016, step 4.5.1, requires NPOs to perform all checks and preventive maintenance activities identified on Plant Logs and step 5.0 requires that completed Plant Logs be maintained. NPO Plant Log OI-PL-0171, "Diesel Generator and ESS XFMRs," requires NPOs to perform an alarm test on panel OC577E twice per shift.

Contrary to the above, information required to be maintained by the licensee was not complete and accurate in all material respects. Specifically, on approximately 157 occasions between January 1996 and June 1996, Nuclear Plant Operators created records to indicate that they had performed a panel OC577E alarm test, and the records were inaccurate in that the tests had not been performed as described in Item I.B.2.d. These records were material in that they provided indication that certain safety activities had been completed when in fact they had not been completed.

3. Regulatory Guide 1.33, Revision 2, February 1978, Appendix `A', Section 1, recommends administrative procedures for equipment control, shift and relief turnover, log entries, and responsibilities for safe operation. Administrative Procedure NDAP-QA-0300, step 6.2.3, Shift Turnover, provides general requirements for this activity and references additional requirements in OP-AD-003, "Shift Routine." OP-AD-003, Revision 6, step 6.5.2, states "Shift Supervisor rounds shall consist of an in-plant tour. Shift Supervisors assigned to night shift (1900-0700) are responsible to conduct a general station inspection nightly". Step 6.10.9 requires personnel to indicate all items of their shift turnover sheet "offgoing" section are complete by marking applicable boxes and signing the form. Attachment F, Shift Supervisor Turnover Sheet, Offgoing Shift Supervisor Checklist, item 1, documents performance of the general station inspection. Step 7.1.1 requires that Shift Supervisor Logs and Shift Supervisor Turnover Sheets be maintained.

Contrary to the above, information required to be maintained by the licensee was not complete and accurate in all material respects. Specifically, on at least 22 occasions between January 1994 and June 1996, Shift Supervisors signed Attachment F of procedure OP-AD-003 indicating that they performed the required general station inspection, and these records were inaccurate in that the in-plant tours had not been conducted by the shift supervisors in that they did not leave the control room during those periods as described in Item I.B.2.e. These records were material in that they provided indication that certain safety activities had been completed when in fact they had not been completed.

4. Regulatory Guide 1.33, Revision 2, February 1978, Appendix `A', Section 9.b, recommends the development of procedures for preventative maintenance schedules. NDAP-00-0540, Preventive Maintenance Scheduling System, Revision 2, is a program for uniform scheduling and tracking of preventive maintenance (PM) activities. NDAP-00-0540, section 6.4.2, PM Worklists, states that upon completion of a PM Worklist activity, the worker shall enter his employee number and date performed in the work completed block. Weekly PM worklist activities S0603, and S5603, require the Assistant Unit Supervisor to monitor one complete set of rounds by accompanying the reactor building nuclear plant operators on Saturday night and Monday night shifts. Step 7.1 of NDAP-00-0540 requires that a completed PM Worklist activity be maintained as a plant document.

Contrary to the above, information required to be maintained by the licensee was not complete and accurate in all material respects. Specifically, between January 1996 and June 1996, five PM Worklist activities were signed off as completed by two Assistant Unit Supervisors, and those records were inaccurate in that the individuals had not entered the plant areas during those periods necessary to perform the activity. These records were material in that they provided indication that certain safety activities had been completed when in fact they had not been completed.

These violations are classified in the aggregate as a Severity Level II problem (Supplements I and VII)
Civil Penalty - $160,000.

II. VIOLATION INVOLVING AN INOPERABLE CONTAINMENT ISOLATION VALVE

Unit 1 Technical Specification (TS) 3.6.3, requires primary containment isolation valves, including the core spray valve F015B, to be operable in Operational Condition 1, 2, and 3. TS Action statement 3.6.3.a requires that with one of the primary containment isolation valves inoperable, at least one isolation valve shall be maintained operable in each penetration that is open and that action must be taken within 4 hours to restore the inoperable valve to operable status or to isolate the affected penetration. When a Limiting Condition for Operation can not be met, TS 3.0.3 requires, in part, that actions be taken to place the unit be in at least STARTUP within 7 hours.

Contrary to the above, on July 30, 1997, with Unit 1 in Operational Condition 1, containment isolation valve F015B was opened and deactivated for 24 hours, rendering the valve inoperable and action could not be taken to meet the requirements specified to isolate the affected penetration because FO15B was the only isolation valve in the penetration. As a result, TS 3.6.3 could not be met; therefore, the actions of TS 3.0.3 were required. However, contrary to the requirements of TS 3.0.3, the licensee failed to take actions to place the unit in at least STARTUP within 7 hours.

This is a Severity Level III violation (Supplement I).
Civil Penalty - $50,000.

III. VIOLATION NOT ASSESSED A CIVIL PENALTY

Technical Specification 6.8.1 requires, in part, that the applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978, shall be established, implemented and maintained. Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978, Section 1 recommends administrative procedures for equipment control. Administrative Procedure NDAP-QA-302, Revision 6 (a procedure established to implement Regulatory Guide 1.33), states that repositioning/operating components controlled by status control tags may be performed with the permission of the individual or work group who required the tag and either Operations Shift Supervision or Operations Outage Group Supervision.

Contrary to the above, on June 12, 1996, a NPO repositioned a breaker switch in a cabinet which was being controlled by a status control tag, and the NPO failed to obtain the permission of the individual or work group who required the tag and either Operations Shift Supervision or Operations Outage Group Supervision. This action resulted in the de-energization of heat tracing for an operable standby liquid control pump for a period of 34 hours.

This is a Severity Level IV Violation (Supplement I)

Pursuant to the provisions of 10 CFR 2.201, Pennsylvania Power and Light Company (Licensee) is hereby required to submit a written statement or explanation to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, within 30 days of the receipt of this Notice of Violation and Proposed Imposition of Civil Penalties (Notice). This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each alleged violation: (1) admission or denial of the alleged violation, (2) the reasons for the violation if admitted, and if denied, the reasons why, (3) the corrective steps that have been taken and the results achieved, (4) the corrective steps that will be taken to avoid further violations, and (5) the date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, an Order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken. Consideration may be given to extending the response time for good cause shown. Under the authority of Section 182 of the Act, 42 U.S.C. 2232, this response shall be submitted under oath or affirmation.

Within the same time as provided for the response required above under 10 CFR 2.201, the Licensee may pay the civil penalties by letter addressed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, with a check, draft, money order, or electronic transfer payable to the Treasurer of the United States in the amount of the civil penalties proposed above, or may protest imposition of the civil penalties, in whole or in part, by a written answer addressed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission. Should the Licensee fail to answer within the time specified, an order imposing the civil penalties will be issued. Should the Licensee elect to file an answer in accordance with 10 CFR 2.205 protesting the civil penalties, in whole or in part, such answer should be clearly marked as an "Answer to a Notice of Violation" and may: (1) deny the violations listed in this Notice, in whole or in part, (2) demonstrate extenuating circumstances, (3) show error in this Notice, or (4) show other reasons why the penalties should not be imposed. In addition to protesting the civil penalties in whole or in part, such answer may request remission or mitigation of the penalties.

In requesting mitigation of the proposed penalties, the factors addressed in Section VI.B.2 of the Enforcement Policy should be addressed. Any written answer in accordance with 10 CFR 2.205 should be set forth separately from the statement or explanation in reply pursuant to 10 CFR 2.201, but may incorporate parts of the 10 CFR 2.201 reply by specific reference (e.g., citing page and paragraph numbers) to avoid repetition. The attention of the Licensee is directed to the other provisions of 10 CFR 2.205, regarding the procedure for imposing civil penalties.

Upon failure to pay any civil penalty due that subsequently has been determined in accordance with the applicable provisions of 10 CFR 2.205, this matter may be referred to the Attorney General, and the penalty, unless compromised, remitted, or mitigated, may be collected by civil action pursuant to Section 234c of the Act, 42 U.S.C. 2282c.

The response noted above (Reply to Notice of Violation, letter with payment of civil penalty, and Answer to a Notice of Violation) should be addressed to: James Lieberman, Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852-2738, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission, Region I, and a copy to the NRC Senior Resident Inspector at the facility that is the subject of this Notice.

Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Dated at King of Prussia, Pennsylvania
this 20th day of June 1997


1. e.g., A Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $100,000 was issued to PP&L on February 9, 1996, for a Severity Level III violation involving the discrimination of an employee who engaged in protected activities. (EA 95-250).