Atomic Safety and Licensing Board Panel (ASLBP) - 2008 Proceedings
Documents pertaining to the proceedings of the Atomic Safety and Licensing Board Panel (ASLBP).
On this page:
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Reactors, Materials and Other
Date(s) | Proceeding/Event | Reference |
---|---|---|
December 8 - 12, 2008 |
Evidentiary Hearing In the Matter of the Enforcement Action Against David Geisen Arising From Activities at the Davis-Besse Nuclear Power Station Docket No. IA-05-052-EA Evidentiary Hearing |
|
October 29, 2008 |
Oral Argument Proceeding for Northern States Power Co., formerly Nuclear Management Company, LLC (License Renewal for Prairie Island Nuclear Generating Plant, Units 1 and 2) Docket No. 50-282 and 50-306 Oral Argument |
|
September 18, 2008 |
Oral Argument Proceeding for AmerGen Energy Company, LLC (License Renewal for Oyster Creek Nuclear Generating Station) Docket No. 50-219 Oral Argument |
Memorandum and Order |
September 3, 2008 |
Initial Prehearing Conference, Duke Energy Carolinas, LLC (Combined License Application William States Lee III Nuclear Station, Units 1 and 2) Docket No. 52-018 and 52-019 Prehearing Conference |
Memorandum and Order |
July 30, 2008 |
Initial Prehearing Conference, Tennessee Valley Authority (Bellefonte Nuclear Power Plant Units 3 and 4) Docket No. 52-014 and 52-015 Prehearing Conference |
Memorandum and Order |
July 23, 2008 |
Oral Argument and Prehearing Conference, Crow Butte Resources, Inc. (In Situ Leach Facility) Docket No. 40-8943 Oral Argument and Prehearing Conference |
Notice |
July 21 - 25, 2008 |
Evidentiary Hearing, Entergy Nuclear Vermont Yankee L.L.C., and Entergy Nuclear Operations Inc. (Vermont Yankee Nuclear Power Station) Docket No. 50-271-LR Evidentiary Hearing |
Order |
April 28, 2008 |
Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site) Docket No. 52-011-ESP Prehearing Conference |
Memorandum and Order |
April 27-28, 2008 |
Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site) Docket No. 52-011-ESP Limited Appearance Statements Session |
Memorandum and Order |
April 10, 2008 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station) Docket No. 50-293-LR Evidentiary Hearing |
Order and Notice |
April 9, 2008 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station) Docket No. 50-293-LR Limited Appearance Statements Session |
Order and Notice |
April 9, 2008 |
Prehearing Conference and Oral Argument, Shaw Areva MOX Services (Mixed Oxide Fuel Fabrication Facility) Docket No. 070-00398 Oral Argument |
Order |
March 10-12, 2008 |
Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) Docket No. 50-247-LR and 50-286-LR Oral Argument |
Order |
January 16-17, 2008 |
Crow Butte Resources, Inc. (License Amendment for the North Trend Expansion Project) Docket No. 40-8943-MLA Oral Argument |
Order |
January 8, 2008 |
Shaw Areva MOX Services (Mixed Oxide Fuel Fabrication Facilities) Docket No. 70-3098 Oral Argument |
Memorandum and Order |
High-Level Waste
Date(s) | Proceeding/Event | Reference |
---|---|---|
December 2, 2008 |
U.S. Department of Energy (High Level Waste Repository) Pre-Application Presiding Officer (PAPO) Board Case Management Conference Docket No. PAPO-00 Conference |
|
May 14, 2008 |
U.S. Department of Energy (High Level Waste Repository: Pre-Application Matters, Advisory PAPO BOARD) Docket No. PAPO-001 Conference |
Memorandum |
February 28, 2008 |
Oral Argument, U.S. Department of Energy (High Level Waste Repository: Pre-Application Matters) Docket No. PAPO-00 Oral Argument |
Order |
Page Last Reviewed/Updated Monday, December 30, 2024
Page Last Reviewed/Updated Monday, December 30, 2024