The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advisory Committee on Reactor Safeguards (ACRS) 2010 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title EDO
Response
12/20/2010 Long-Term Cooling for the Westinghouse AP1000 Pressurized Water Reactor 01/26/2011
12/15/2010 ACRS Review of Updates to 10 CFR 50.55a, "Codes and Standards" 01/21/2011
12/15/2010 Safety Culture Statement 01/21/2011
12/13/2010 Report on the Final Safety Evaluation Report Associated with the Amendment to the AP1000 Design Control Document 02/05/2010
12/08/2010 Draft Final Regulatory Guides 3.12, 3.71, 4.16, and 5.80 No Response Required
11/17/2010 Draft Final Revisions to Generic License Renewal Guidance Documents 12/21/2010
11/16/2010 Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance (NUREG-1927) 12/17/2010
11/15/2010 ACRS Assessment of the Quality of Selected NRC Research Projects – FY2010 01/25/2011
11/09/2010 Response to the October 7, 2010, EDO Letter Regarding Closure of Design Acceptance Criteria for New Reactors 12/10/2010
11/09/2010 Withdrawl of Regulatory Guides 1.39, 1.81, and 1.154  
10/26/2010 Report on the Safety Aspects of the License Renewal Application for the Duane Arnold Energy Center 11/26/2010
10/26/2010 Report on the Safety Aspects of the License Renewal Application for the Cooper Nuclear Station 11/23/2010
10/20/2010 Report on the Safety Aspects of the General Electric-Hitachi Nuclear Energy (GEH) Application for Certification of the Economic Simplified Boiling Water Reactor (ESBWR) Design 11/22/2010
10/20/2010 Draft Final Digital Instrumentation and Control Interim Staff Guidance-06: Licensing Process 12/07/2010
10/20/2010 Draft Final Rule for Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements (10 CFR 50.46a) 11/19/2010
10/14/2010 Draft Final Regulatory Guide 8.18 No Response Required
10/14/2010 Proposed Regulatory Guides DG-7007 and DG-1250 No Response Required
09/27/2010 License Application for the Mixed Oxide Fuel Fabrication Facility and the Associated Safety Evaluation Report 10/26/2010
09/22/2010 Long-Term Core Cooling for the Economic and Simplified Boiling Water Reactor (ESBWR) 10/18/2010
09/20/2010 Report on the Safety Aspects of the South Texas Project Nuclear Operating Company Application to Amend the Certified U.S. ABWR Design to Incorporate the Aircraft Impact Assessment Rule  
09/17/2010 Comments on SECY-10-0113, "Closure Options for Generic Safety Issue-191, Assessment of Debris Accumulation in Pressurized Water Reactor Sump Performance" 10/25/2010
09/10/2010 Draft Final Interim Staff Guidance (ISG-23) No Response Required
09/10/2010 Draft Final Revision to 10 CFR 50.55a, "Codes and Standards No Response Required
09/10/2010 Proposed Revisions to Regulatory Guide 7.4 No Response Required
09/10/2010 Proposed Revisions to Regulatory Guides 8.39 and 8.23 No Response Required
08/09/2010 Closure of Design Acceptance Criteria for New Reactors 10/07/2010
08/09/2010 Interim Letter: Safety Evaluation Report with Open Items Related to the South Texas Project Combined License Application Referencing the Certified Advanced Boiling Water Reactor Design 09/10/2010
07/29/2010 Draft Final Regulatory Guide 3.74, "Guidance for Fuel Cycle Facility Change Processes" 08/25/2010
07/27/2010 Risk-Informed Regulatory Guidance for New Reactors 08/25/2010
07/21/2010 Withdrawl of Regulatory Guides 3.44 and 3.49 No Response Required
07/21/2010 Draft Final Regulatory Guides 3.13, 8.35, and 8.4 No Response Required
07/21/2010 Proposed Revisions to Regulatory Guides 1.149, 1.179, and 3.71 No Response Required
06/24/2010 Draft Final Regulatory Guide 1.216, "Containment Structural Integrity Evaluation for Internal Pressure Loadings Above Design-Basis Pressure" 07/23/2010
06/16/2010 Response to the April 16, 2010, EDO Letter Regarding Draft Final NUREG-1520, Revision 1, "Standard Review Plan for Review of a License Application for a Fuel Cycle Facility" 07/23/2010
06/14/2010 Proposed Regulatory Guides 1.93 and 7.7 No Response Required
06/14/2010 Draft Final Regulatory Guide 2.5 No Response Required
05/19/2010 Draft Guidance on Crediting Containment Accident Pressure in Meeting the Net Positive Suction Head Required to Demonstrate that Safety Systems can Mitigate Accidents as Designed 06/10/2010
05/17/2010 Revised Standard Review Plan for Spent Fuel Dry Storage Systems (NUREG-1536) 06/15/2010
05/12/2010 Proposed Standard Review Plan, Branch Technical Position 7-19 No Response Required
05/12/2010 Final Interim Staff Guidance ISG-25 No Response Required
05/12/2010 Proposed Revisions to Regulatory Guides 3.67 and 7.3 No Response Required
05/12/2010 Comments Regarding Licensed Operator Training Standards  
04/27/2010 Licensing Topical Report, NEDC-33173P, Supplement 3, "Applicability of GE Methods to Expanded Operating Domains - Supplement for GNF2 Fuel  
04/21/2010 Chapters 2, 4, 5, 8, 10, 12, and 17 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Reactor Design Certification Application 05/27/2010
04/15/2010 Proposed Regulatory Guides 1.127, 3.13, 8.2, and DG-1240, and DG-1247 No Response Required
04/15/2010 Proposed Interim Staff Guidance DC/COL-014 and DC/COL-ISG-021 No Response Required
04/15/2010 Final Interim Staff Guidance DC/COL-ISG-017 and DC/COL-20 No Response Required
04/15/2010 Draft Final Regulatory Guides 1.147, 1.68.2, 1.84, 1.193, 6.9 and 8.40 No Response Required
04/07/2010 Review and Evaluation of the Nuclear Regulatory Commission Safety Research Program 05/25/2010
03/29/2010 Draft Final Revision 1 of Regulatory Guide 1.62, "Manual Initiation of Protective Actions" 05/14/2010
03/25/2010 Draft Revision 2, Regulatory Guide 4.11 (DG-4016), "Terrestrial Environmental Studies for Nuclear Power Plants" Not Available
03/25/2010 Draft Final Revision 1 to Digital Instrumentation and Control Interim Staff Guidance - 07: "Digital Instrumentation & Control Systems in Safety Applications at Fuel Facilities" 05/18/2010
03/25/2010 Draft Final Revision 1 of Regulatory Guide 1.141, "Containment Isolation Provisions For Fluid Systems" 04/30/2010
03/18/2010 Status of Staff Rulemaking Efforts for Depleted Uranium and Other Unique Waste Streams 04/20/2010
03/11/2010 Draft Final Regulatory Guides 1.11, 1.126, 1.128, 1.65 and 3.39 No Response Required
03/11/2010 Proposed Revision 2 to Regulatory Guide 1.54 No Response Required
03/11/2010 Proposed Revision to Regulatory Guide 1.152, 2.6, 4.20, 8.10, 8.19, 8.4, and DG-1216 No Response Required
03/11/2010 Withdrawal of Regulatory Guide 8.6 No Response Required
03/11/2010 Final Interim Staff Guidance ESP/DC/COL-ISG-015, "Post-Combined License Commitments" No Response Required
02/22/2010 Draft Final NUREG-1520 Revision 1, "Standard Review Plan for Review of a License Application for a Fuel Cycle Facility" 04/16/2010
02/17/2010 ACRS Review of Amendments to Previously Certified Reactor Designs  

Page Last Reviewed/Updated Friday, March 13, 2020