12/14/2015 | Report on the Safety Aspects of the Duke Energy Carolinas, LLC, Combined License Application for William States Lee III Nuclear Station, Units 1 And 2 | 01/22/16 |
11/17/2015 | ACRS Assessment of the Quality of Selected NRC Research Projects | 12/03/15 |
11/17/2015 | The Revised Fuel Cycle Oversight Process Cornerstones | 12/13/15 |
11/16/2015 | Plans for Resolving the NRC Near-Term Task Force Open Fukushima Tier 2 and 3 Recommendations | 12/16/15 |
11/13/2015 | Draft SECY Paper, "Recommendations on Issues Related to Implementation of a Risk Management Regulatory Framework" | 12/28/15 |
11/12/2015 | Report on the Safety Aspects of the License Renewal Application for Davis-Besse Nuclear Power Station | 12/01/15 |
11/09/2015 | Draft Regulatory Guide | No Response Required |
10/20/2015 | Interim Staff Guidance, "Guidance for the Evaluation of Acute Chemical Exposures and Proposed Quantitative Standards" | 11/24/15 |
10/16/2015 | Reactor Oversight Process Enhancements | 11/25/15 |
10/15/2015 | Report On The Safety Aspects Of The Construction Permit Application For Shine Medical Technologies, Inc. Medical Isotope Production Facility | 11/25/15 |
10/13/2015 | Draft Regulatory Guide | No Response Required |
10/09/2015 | Documentation of Receipt of Applicable Official NRC Notices to the Advisory Committee On Reactor Safeguards for October, 2015 | No Response Required |
09/23/2015 | Interim Staff Guidance: DC/COL-ISG-028, "Assessing the Technical Adequacy of the Advanced Light-Water Reactor Probabilistic Risk Assessment for the Design Certification Application and Combined License Application" | 11/19/15 |
09/22/2015 | Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors | 10/29/15 |
09/21/2015 | Report on the Safety Aspects of the License Renewal Application for Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 | 10/23/15 |
09/15/2015 | Draft Regulatory Guide | No Response Required |
07/21/2015 | Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request | 09/04/15 |
07/13/2015 | Draft Regulatory Guide | No Response Required |
07/13/2015 | Withdrawal of Regulatory Guide | No Response Required |
06/25/2015 | PSEG Early Site Permit | 07/17/15 |
06/24/2015 | Grand Gulf Nuclear Station Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request | 07/29/15 |
06/15/2015 | Draft Final Regulatory Guides | No Response Required |
06/15/2015 | Draft Regulatory Guide | No Response Required |
06/15/2015 | Regulatory Information Summary | No Response Required |
05/11/2015 | Draft Final Regulatory Guide | No Response Required |
05/11/2015 | Interim Staff Guidance | No Response Required |
04/30/2015 | Interim Staff Guidance JLD-ISG-2015-01, "Compliance with Phase 2 of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions" | 05/22/15 |
04/22/2015 | Draft SECY Paper, "Proposed Rulemaking: Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49)" | 05/15/15 |
04/21/2015 | Draft Final Regulatory Guides | No Response Required |
04/21/2015 | Interim Staff Guidance | No Response Required |
04/21/2015 | Withdrawal of Regulatory Guide 1.1 | No Response Required |
04/20/2015 | Topical Report NEDC-33766P, "GEH Simplified Stability Solution (GS3)" | 04/22/15 |
03/13/2015 | Report on the Safety Aspects of the License Renewal Application of the Sequoyah Nuclear Plant Units 1 and 2 | 04/06/15 |
03/11/2015 | Review of Draft SECY Paper, "Cumulative Effects of Regulation Process Enhancements and Risk Prioritization Initiative: Response to Commission Direction and Recommendations | 04/09/15 |
03/11/2015 | Draft Regulatory Guides | No Response Required |
03/11/2015 | Interim Staff Guidance | No Response Required |
02/26/2015 | Proposed Revision for 10 CFR 50.55a to Incorporate by Reference IEEE Standard 603-2009, "IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations" | 04/14/15 |
02/20/2015 | Draft Final Generic Letter 20XX-XX, "Treatment of Natural Phenomena Hazards at Fuel Cycle Facilities" | 03/27/15 |
02/19/2015 | Report On the Safety Aspects of the Nuclear Innovation North America, LLC Combined License Application for South Texas Project Nuclear Station, Units 3 and 4 | 04/02/15 |
02/12/2015 | Draft Regulatory Guides dated February 12, 2015 | No Response Required |
02/12/2015 | Proposed Revision to Branch Technical Position | No Response Required |
02/12/2015 | Final ACRS Review of Watts Bar Nuclear Plant Unit 2 Operating License Application | 03/19/15 |