ACRS 2014 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date | Title | Response |
---|---|---|
12/17/2014 | Draft Branch Technical Position 8-9 on Open Phase Conditions in Electric Power Systems | 01/16/15 |
12/10/2014 | Commission Paper, Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flooding Hazards | 02/18/15 |
12/09/2014 | Draft Final Regulatory Guide – RG 1.138, Revision 3 | No Response Required |
11/25/2014 | ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2014 | 02/13/15 |
11/13/2014 | Standard Review Plan Chapter 19 and Section 17.4 | 12/22/14 |
11/10/2014 | Draft Regulatory Guides (DG-1316 and DG-4023) | No Response Required |
11/10/2014 | Draft Revisions to Standard Review Plan Sections and Branch Technical Positions | No Response Required |
10/14/2014 | Report on the Safety Aspects of the License Renewal Application of the Callaway Plant, Unit 1 | 11/20/14 |
10/06/2014 | Draft Final Regulatory Guides – Revision 3 of RG 7.10 | No Response Required |
10/06/2014 | Draft Regulatory Guides: DG-1245 and DG-5036 | No Response Required |
09/22/2014 | Report on the Safety Aspects of the DTE Electric Company Combined License Application for Fermi Unit 3 | 11/20/14 |
09/15/2014 | Generic Letter 20XX-XX, "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools" | 12/15/14 |
09/11/2014 | SECY-14-0087, Qualitative Consideration of Factors in the Development of Regulatory Analyses and Backfit Analyses | 10/09/15 |
09/10/2014 | Revision to 10 CFR Part 71 | No Response Required |
09/10/2014 | Supplemental Safety Evaluation Report | No Response Required |
09/09/2014 | ACRS Review of Interim Staff Guidance | 10/27/14 |
09/09/2014 | Draft Regulatory Guides 1312 and 1305 | No Response Required |
09/09/2014 | Proposed Branch Technical Position | No Response Required |
09/09/2014 | Proposed Generic Letter | No Response Required |
08/06/2014 | Draft Final Design Specific Review Standard for mPower iPWR Chapter 7, Instrumentation and Control Systems | 11/25/14 |
08/05/2014 | Proposed Revision for 10 CFR 50.55a to Incorporate by Reference IEEE Standard 603-2009, "IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations" dated August 5, 2014 | 10/16/14 |
07/28/2014 | Draft NUREG-1520, Revision 2 | No Response Required |
07/28/2014 | Proposed New Standard Review Plan Section | No Response Required |
07/28/2014 | Proposed Revisions to Draft Regulatory Guides | No Response Required |
07/28/2014 | Proposed Revisions to South Texas Project, Units 3 and 4 Combined License Application Safety Evaluation Report | No Response Required |
07/17/2014 | Draft Final Rule: ESBWR Design Certification | No Response Required |
07/18/2014 | Peach Bottom Atomic Power Station Units 2 And 3 Extended Power Uprate License Amendment Request | 08/12/14 |
07/16/2014 | Standard Review Plan Chapter 19 and Section 17.4 | 08/28/14 |
06/19/2014 | Revised Fuel Cycle Oversight Process | 07/25/14 |
06/13/2014 | Draft Final Regulatory Guide 1.193 | No Response Required |
06/13/2014 | Draft Regulatory Guide 1.105 | No Response Required |
06/13/2014 | Proposed Generic Issue Pertaining to the Dispersal of Fuel Particles During a Loss-of-Coolant Accident | No Response Required |
05/22/2014 | SECY-14-0016, "Ongoing Staff Activities to Assess Regulatory Considerations for Power Reactor Subsequent License Renewal" | 09/22/14 |
05/14/2014 | Human Reliability Analysis Models | 06/25/14 |
05/09/2014 | Draft Final Regulatory Guide 8.20, Revision 2 | No Response Required |
04/21/2014 | Credit for Containment Accident Pressure to Ensure Operation of US-APWR Emergency Core Cooling System Pumps | 06/25/14 |
04/18/2014 | Draft Final Regulatory Guides – 1.60, Revision 2 and 3.50, Revision 2 | No Response Required |
04/18/2014 | Withdrawal of Regulatory Guides – 1.37, 3.28, and 3.29 | No Response Required |
04/17/2014 | Supplemental Final Safety Evaluation Report on the General Electric-Hitachi Nuclear Energy (GEH) Application For Certification of the Economic Simplified Boiling Water Reactor (ESBWR) Design | 05/27/14 |
04/15/2014 | Review and Evaluation of the NRC Safety Research Program | 07/09/14 |
03/14/2014 | Chapters 3 (Partial), 9, and 14 of the Safety Evaluation Report with Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application | 04/17/14 |
03/13/2014 | Chapters 3 (Partial) and 14 of the Safety Evaluation Report with Open Items for Certification of the US-APWR Design | 04/17/14 |
02/19/2014 | Draft Final Regulatory Guides | No Response Required |
02/19/2014 | Proposed Regulatory Guide DG-1289 | No Response Required |
02/19/2014 | South Texas Project Combined License Application (COLA) and Revised Safety Evaluation Report | No Response Required |
02/19/2014 | 10 CFR Part 61 – Revisions to Low-Level Radioactive Waste Disposal Requirements | 03/20/14 |
02/18/2014 | Monticello Nuclear Generating Plant Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request | 03/20/14 |
02/12/2014 | Proposed Rulemaking on Station Blackout Mitigation Strategies | 04/10/14 |
01/06/2014 | Safety Evaluation of US-APWR Topical Report MUAP-07001, Revision 5, "The Advanced Accumulator" | 02/11/14 |