2006 Public Meetings for the US-APWR Design Certification Pre-Application Review
The following table lists, in chronological order, the public meetings that the U.S. Nuclear Regulatory Commission (NRC) conducted with Mitsubishi Heavy Industries, Ltd. (MHI), in 2006, as part of the Design Certification Pre-Application Review for the the U.S. Advanced Pressurized-Water Reactor (US-APWR). For public meetings related to the staff's review of the US-APWR design certification application, see Correspondence and Public Meetings Related to the US-APWR Design Certification Application.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date |
Description |
11/29/06 |
US-APWR Pre-Application Review Meeting: Advanced Accumulator (PAR Meeting #3)
|
11/28/06 |
Meeting with Mitsubishi Heavy Industries (MHI), Public Meeting to Discuss MHI's Proposed Quality Assurance Topical Report (PAR Meeting #3)
|
11/28/06 |
Meeting with Mitsubishi Heavy Industries (MHI), Public Meeting to Discuss MHI's Proposed Topical Report on Instrumentation and Controls (PAR Meeting #3)
|
09/26/06 |
US-APWR Pre-Application Review Meeting #2
|
07/13/06 |
US-APWR Pre-Application Review Meeting #1
|