Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

2006 Public Meetings for the US-APWR Design Certification Pre-Application Review

The following table lists, in chronological order, the public meetings that the U.S. Nuclear Regulatory Commission (NRC) conducted with Mitsubishi Heavy Industries, Ltd. (MHI), in 2006, as part of the Design Certification Pre-Application Review for the the U.S. Advanced Pressurized-Water Reactor (US-APWR). For public meetings related to the staff's review of the US-APWR design certification application, see Correspondence and Public Meetings Related to the US-APWR Design Certification Application.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
11/29/06

US-APWR Pre-Application Review Meeting: Advanced Accumulator (PAR Meeting #3)

11/28/06

Meeting with Mitsubishi Heavy Industries (MHI), Public Meeting to Discuss MHI's Proposed Quality Assurance Topical Report (PAR Meeting #3)

11/28/06

Meeting with Mitsubishi Heavy Industries (MHI), Public Meeting to Discuss MHI's Proposed Topical Report on Instrumentation and Controls (PAR Meeting #3)

09/26/06

US-APWR Pre-Application Review Meeting #2

07/13/06

US-APWR Pre-Application Review Meeting #1

Page Last Reviewed/Updated Tuesday, September 08, 2026

Page Last Reviewed/Updated Tuesday, September 08, 2026