Chapter Description Date
1 Introduction and General Description of Plant 05/30/14
2 Site Characteristics 07/20/12
3 Design of Structures, Components, Equipment, and Systems 07/20/12
4 Reactor 04/25/11
5 Reactor Coolant System and Connected Systems 09/07/11
6 Engineered Safety Features 08/17/11
7 Instrumentation and Controls Systems 04/25/11
8 Electric Power 04/25/11
9 Auxiliary Systems 10/31/11
10 Steam and Power Conversion System 04/26/12
11 Radioactive Waste Management 10/31/11
12 Radiation Protection 10/31/11
13 Conduct of Operations 11/01/11
14 Initial Test Program 06/28/12
15 Accident and Analysis 04/25/11
16 Technical Specifications 08/15/11
17 Quality Assurance 09/22/11
18 Human Factors Engineering 04/25/11
19 Response to Severe Accident Policy Statement 09/21/11
20 Fukushima Near-Term Task Force Recommendations 04/25/14