4.5.2 Groundwater ImpactsPotential environmental impacts to groundwater at the Nichols Ranch and Hank site may occurduring all phases of the ISR facility's lifecycle, but primarily during operations and aquiferrestoration.ISR activities can impact aquifers at varying depths (s...
3.5.3 GroundwaterAs discussed in the GEIS (Section 3.3.4.3.1), the Northern Great Plains aquifer system is the majorregional aquifer system in the Wyoming East Uranium Milling Region. Whitehead (1966) grouped theNorthern Great Plains aquifer system into five major aquifers. Th...
On this page:Publication InformationAbstractDownload complete documentNUREG/CR-7105 (PDF - 9.01 MB)Publication InformationManuscript Completed: September 2011 Date Published: October 2011Prepared by: W.L. EbertArgonne National Laboratory 9700 South Cass Avenue Argonne, IL 6043...
§ 60.122 Siting criteria.(a)(1) A geologic setting shall exhibit an appropriate combination of the conditions specified in paragraph (b) of this section so that, together with the engineered barriers system, the favorable conditions present are sufficient to provide reasonable...
4.5.2 Groundwater ImpactsPotential environmental impacts to groundwater at the Nichols Ranch and Hank site may occurduring all phases of the ISR facility's lifecycle, but primarily during operations and aquiferrestoration.ISR activities can impact aquifers at varying depths (s...
INTEGRATED ASSESSMENT OF ISR MINING IMPACTS ON GROUNDWATER QUALITY
AND BIOREMEDIATION EFFECTIVENESS
Applicant/Institution: Texas A&M University – Kingsville
Principal Investigator: Dr. Lee W. Clapp
Co-Principal Investigators: Dr. Kim D. Jones and Dr. Shuangzhen Wang ...
3.5.3 GroundwaterAs indicated in the GEIS (Section 3.2.4.3.2), the Crooks Gap Uranium District is underlain, fromshallowest to deepest, by sedimentary deposits and sandstone layers (Quaternery aged), the Green RiverFormation, the Wasatch/Battle Spring Formation, the Fort Union...
1~4.5.2 Groundwater ImpactsPotential environmental impacts to groundwater at the Nichols Ranch and Hank site may occurduring all phases of the ISR facility's lifecycle, but primarily during operations and aquiferrestoration.ISR activities can impact aquifers at varying depths ...
(FSME-09-061, July, Program, SA-900)
July 24, 2009
ALL AGREEMENT STATES, MICHIGAN, NEW JERSEY
OPPORTUNITY TO COMMENT ON DRAFT REVISION TO FSME PROCEDURES SA-900,
“TERMINATION OF URANIUM MILLING LICENSES IN AGREEMENT STATES”
(FSME-09-061)
Purpose: To ...
POLICY ISSUE
INFORMATION
July 8, 2005 SECY-05-0123
FOR: The Commissioners
FROM: Luis A. Reyes
Executive Director for Operations
SUBJECT: STATUS OF THE DEVELOPMENT OF MEMORANDA OF
UNDERSTANDING WITH NEBRASKA AND WYOMING, REGARDING
THE REGULATION OF GROUNDWATER PROTECTION ...
2.4.12-1RS-002, “PROCESSING APPLICATIONS FOR EARLY SITE PERMITS”ATTACHMENT 22.4.12 GROUNDWATERREVIEW RESPONSIBILITIESPrimary - Mechanical and Civil Engineering Branch (EMEB) Secondary - NoneI. AREAS OF REVIEWFor review of an early site permit (ESP) application, data presented...
All definitions in subpart K of this part, and the following:Accessible environment means any point outside of the controlled area, including:(1) The atmosphere (including the atmosphere above the surface area of the controlled area);(2) Land surfaces;(3) Surface waters;(4) Oc...
2.4.12-1RS-002, “PROCESSING APPLICATIONS FOR EARLY SITE PERMITS”ATTACHMENT 22.4.12 GROUNDWATERREVIEW RESPONSIBILITIESPrimary - Mechanical and Civil Engineering Branch (EMEB) Secondary - NoneI. AREAS OF REVIEWFor review of an early site permit application, data presented in th...
1
Homestake–Grants Uranium Recovery Facility
Site Location and Facility Description
The Homestake Mining Company of California
(Homestake) owns and manages the Grants
Reclamation Project located in the Grants Mining
District, 5.5 miles northeast of Milan in Cibola
C...
NRC Commission Meeting
Groundwater Task Force
Patrick Mulligan, Manager
Conference of Radiation Control Program Directors
and
NJ DEP Bureau of Nuclear Engineering
Theme 1: Regulatory
Framework
“The SMRG concurred with the GTF’s
conclusion that the NRC is accomplishing...
On this page:Publication InformationAbstractDownload complete documentNUREG/CR-6647 (PDF - 2.93 MB)Publication InformationManuscript Completed: May 2000Date Published: July 2000Prepared by:
D.E. Robertson, SJi. Pratt, C.W. ThomasPacific Northwest National Laboratory
Richland...
COMSECY-07-0015
d)
'~~$J5 ~ _________
UiWffED STATES
f', W 1C, EAR R OM 3 UL -6T 0 R Y GC W QM IS S1
VVASHNiGTOH, E.Cý 20555-9001
April 30, 2007
MEMORANDUM TC
FROM:
SUBJECT:
-Chairman Klein Approve, subject to
Commissioner McGaffigan Commissioner Merrifi
Commissioner ...
'-' SEOUOVAH I=UELS ~ A GENERAL ATOMICS COMPANY March 31, 2014 Certified Mail - Return Receipt Requested Receipt No. 7011 0110 0000 0858 4572 Ken Kalman, Project Manager Fuel Cycle Facilities Branch Division of Fuel Cycle Safety and Safeguards Office ofNuclear Material SafetY....
2013 ANNUAL GROUND WATER REPORTSequoyah Fuels CorporationGore, OklahomaSubmitted to:Fuel Cycle Facilities BranchU.S. Nuclear Regulatory CommissionHeadquarters Office, Rockville, MDMarch 26, 2014TABLE OF CONTENTS1.0 INTRODUCTION ....................................................
September 16, 2008
The Honorable Jeff Bingaman
United States Senate
Washington, D.C. 20510
Dear Senator Bingaman:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your
letter of August 8, 2008, regarding the license amendm...
2010 ANNUAL GROUNDWATER REPORTSequoyah Fuels Corporation Gore, Oklahoma Submitted to:Fuel Cycle Facilities BranchU.S. Nuclear Regulatory CommissionHeadquarters Office, Rockville, MD February 22, 2011iTABLE OF CONTENTS1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . ....
U.S. Nuclear Regulatory CommissionOperations Center Event Reports For12/19/2011 - 12/20/2011 ** EVENT NUMBERS ** 47499475264752747534Power ReactorEvent Number: 47499 Facility: TURKEY POINT Region: 2 State: FL Unit: [3] [4] [ ] RX Type: [3] W-3-LP,[4] W-3-LP NRC No...
The Nuclear Regulatory Commission has been overseeing nuclear power plants and their tritium monitoring programs for several years. Our reviews have confirmed leaks with tritium in underground pipes have not affected public health and safety and the environment. More informati...
1 62 NRC 77 (2005).
2 The Hydro Resources Inc. (HRI) license authorizes HRI to conduct in situ leach (ISL)
uranium mining at four sites in McKinley County, New Mexico: Church Rock Section 8, Church
Rock Section 17, Unit 1, and Crownpoint. Phase I of the proceeding focused o...
SECI
I R EU .1UNITED STATES0"° NUCLEAR REGULATORY COMMISSION
,WASHINGTON, D.C. 20555-0001
May 24, 2012
RETARY COMMISSION VOTING RECORD
DECISION ITEM: SECY-12-0046
TITLE: OPTIONS FOR REVISING THE REGULATORY APPROACH
TO GROUND WATER PROTECTION
The Commission acted on the...