Skip to main content

Power Reactors (Division 1): Regulatory Guides 1.21 - 1.40

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 1, "Power Reactors," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

Guide
Number
TitleRevision NumberPublish
Date
Additional
Information
1.21

Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste

HISTORY
  • 01/2021 – DG-1377 issued as proposed Revision 3
  • 09/2019 – Periodic Review performed recommended revising
  • 03/2015 – Periodic Review of Revision 2 – Issues identified for future consideration
  • 10/2008 – DG-1186 issued as proposed Revision 2
  • 12/1971 – Atomic Energy Commission issued Safety Guide 21, "Measuring and Reporting of Effluents from Nuclear Power Plants," which is the predecessor of RG 1.21, Rev. 1
309/2021 
206/2009 
106/1974 
012/1971 
1.22

Periodic Testing of Protection System Actuation Functions (Safety Guide 22)

HISTORY
002/1972Periodic Review in 2022 Reviewed with no issues identified

Periodic Review in 2012 – Reviewed with no issues identified
1.23

Meteorological Monitoring Programs for Nuclear Power Plants

HISTORY
  • 03/2023 - Periodic Review - Reviewed with issues identified for future consideration
  • 03/2013 - Periodic Review - Reviewed with issues identified for future consideration
  • 03/2007 - RG 1.23 Revision 1
  • DG-1164, Third Proposed Revision 1, published 10/2006
  • Draft ES 926-4, Second Proposed Revision 1, entitled "Meteorological Measurement Program for Nuclear Power Plants," published 04/1986
  • Draft SS 926-4, First Proposed Revision 1, entitled "Meteorological Programs In Support of Nuclear Power Plants," published 09/1980
  • Revision 0, entitled "Onsite Meteorological Programs," was issued as Safety Guide 23
DG07/2026DG-1463
103/2007Periodic Review in 2023 Reviewed with issues identified for future consideration

Periodic Review in 2013 – Reviewed with issues no issues identified
002/1972 
1.24

Assumptions Used for Evaluating the Potential Radiological Consequences of a Pressurized Water Reactor Radioactive Gas Storage Tank Failure (Safety Guide 24)

HISTORY
003/1972Periodic Review in 2026 - Reviewed with issues identified for future consideration 

Periodic Review in 2016 – Reviewed with issues identified for future consideration
1.25Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Handling and Storage Facility for Boiling and Pressurized Water Reactors (Safety Guide 25)
(Withdrawn – See 81 FR 89510, 12/12/2016)
W12/2016 
003/1972 
1.26

Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants

HISTORY
  • DG 1371, Proposed Revision 6, published 04/2021
  • DG-1314, Proposed Revision 5, published 04/2015
  • DG-1152, Proposed Revision 4, published 11/2006
  • Revision 3 was issued for public comment on 02/1976
612/2021 
502/2017 
403/2007 
302/1976 
206/1975 
109/1974 
003/1972 
1.27

Ultimate Heat Sink for Nuclear Power Plants

HISTORY
  • DG-1275, Proposed Revision 3, published 09/2013
311/2015 
201/1976 
103/1974 
003/1972 
1.28

Quality Assurance Program Criteria (Design and Construction)

HISTORY
  • DG-1403, Proposed Revision 6, published 04/2023
  • DG-1326, Proposed Revision 5, published 03/2017
  • DG-1215, Proposed Revision 4, published 07/2009
  • Prior to the issuance of Revision 4, RG 1.28 was entitled “Quality Assurance Program Requirements (Design and Construction)”
609/2023 
510/2017 
406/2010 
308/1985 
202/1979 
103/1978 
006/1972 
1.29

Seismic Design Classification for Nuclear Power Plants

HISTORY
  • DG-1315, Proposed Revision 5, published 09/2015
  • DG-1156, Proposed Revision 4, published 10/2006
607/2021 
507/2016 
403/2007 
309/1978 
202/1976 
108/1973 
006/1972 
1.30

Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment (Safety Guide 30)

HISTORY
104/2024 
008/1972Periodic Review in 2022 – Revise

Periodic Review in 2018 – Revise
1.31

Control of Ferrite Content in Stainless Steel Weld Metal

HISTORY
410/2013

Periodic Review in 2026 – Reviewed with no issues identified

Periodic Review in 2016 – Reviewed with no issues identified

304/1978 
205/1977 
106/1973 
008/1972 
1.32

Criteria for Power Systems for Nuclear Power Plants

HISTORY
401/2025 
303/2004Periodic Review in 2017 – Reviewed with no issues identified
202/1977 
103/1976 
008/1972 
1.33

Quality Assurance Program Requirements (Operation)

HISTORY
306/2013Periodic Review in 2023 - Reviewed with issues identified for future consideration
202/1978 
101/1977 
011/1972 
1.34

Control of Electroslag Weld Properties

HISTORY
103/2011

Periodic Review in 2026 – Reviewed with no issues identified

Periodic Review in 2016 – Reviewed with no issues identified

012/1972 
1.35

Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments
(WithdrawnSee 80 FR 52067, 08/27/2015)

HISTORY
W08/2015 
307/1990 
201/1976 
106/1974 
002/1973 
1.35.1

Determining Prestressing Forces for Inspection of Prestressed Concrete Containments

HISTORY
007/1990Periodic Review in 2015 – Reviewed with issues identified for future consideration
1.36

Nonmetallic Thermal Insulation for Austenitic Stainless Steel

HISTORY
105/2015Periodic Review in 2025 - Reviewed with Issues Identified for Future Consideration
002/1973 
1.37

Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants
(Withdrawn – See 79 FR 38963, 07/09/2014)

HISTORY
  • DG-1165, Proposed Revision 1, published 10/2006
W07/2014 
103/2007 
003/1973 
1.38Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants
(Withdrawn – See 75 FR 54921, 09/09/2010)
W09/2010 
205/1977 
110/1976 
003/1973 
1.39Housekeeping Requirements for Water-Cooled Nuclear Power Plants
(Withdrawn – See 75 FR 70044, 11/16/2010)
W11/2010 
209/1977 
110/1976 
003/1973 
1.40

Qualification of Continuous Duty Safety-Related Motors for Nuclear Power Plants

HISTORY
1

02/2010

Periodic Review in 2026 – Revise 

Periodic Review in 2015 – Reviewed with no issues identified
003/1973 

Page Last Reviewed/Updated Tuesday, August 11, 2026

Page Last Reviewed/Updated Tuesday, August 11, 2026