Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

Guide
Number
TitleRevision NumberPublish
Date
Additional Information
1.121

Bases for Plugging Degraded PWR Steam Generator Tubes (for Comment)

008/1976Periodic Review – May 2023 – Considerations

Reviewed in 2013 – No issues identified
1.122
 

Development of Floor Design Response Spectra for Seismic Design of Floor-Supported Equipment or Components

102/1978Reviewed in 2019 – Issues identified for future consideration
009/1976 
1.123Quality Assurance Requirements for Control of Procurement of Items and Service for Nuclear Power Plants
(Withdrawn -- See 56 FR 36175, 07/31/1991)
W07/1991 
107/1977 
010/1976 
1.124

Service Limits and Loading Combinations for Class 1 Linear-Type Supports

307/2013Periodic Review – September 2023 - Revise 
202/2007Periodic Review - March 2013 -  Revise
101/1978 
011/1976 
1.125

Physical Models for Design and Operation of Hydraulic Structures and Systems for Nuclear Power Plants

203/2009Reviewed in 2014 – Issues identified for future consideration
110/1978 
003/1977 
1.126

An Acceptable Model and Related Statistical Methods for the Analysis of Fuel Densification

203/2010Reviewed in 2015 – No issues identified
103/1978 
003/1977 
1.127

Inspection of Water-Control Structures Associated with Nuclear Power Plants

202/2016 
103/1978 
004/1977 
1.128

Installation Design and Installation of Vented Lead-Acid Storage Batteries for Nuclear Power Plants

304/2024 
202/2007

Periodic Review – May 2023 – Revise

Periodic Review – May 2013 – No Action

110/1978 
004/1977 
1.129

Maintenance, Testing, and Replacement of Vented Lead-Acid Storage Batteries for Production and Utilization Facilities
+ HISTORY

403/2023 
309/2013 
202/2007 
102/1978 
004/1977 
1.130

Service Limits and Loading Combinations for Class 1 Plate-and-Shell-Type Component Supports

307/2013Periodic Review - September 2023 - Revise
203/2007Periodic Review – March 2013 - Revise 
110/1978 
007/1977 
1.131

Qualification Tests of Electric Cables, Field Splices, and Connections for Light-Water-Cooled Nuclear Power Plants (for Comment)
(Withdrawn -- See 74 FR 18000, 04/20/2009)

W04/2009 
008/1977 
1.132

Geologic and Geotechnical Site Characterization Investigations for Nuclear Power Plants

312/2021 
210/2003 
103/1979 
009/1977 
1.133

Loose-Part Detection Program for the Primary System of Light-Water-Cooled Reactors

105/1981Reviewed in 2015 – Issues identified for future consideration
009/1977 
1.134

Medical Assessment of Licensed Operators or Applicants for Operator Licenses at Nuclear Power Plants

409/2014Periodic Review – May 2025 – Reviewed with No Issues Identified
303/1998 
204/1987 
103/1979 
009/1977 
1.135

Normal Water Level and Discharge at Nuclear Power Plants (for Comment)
(Withdrawn -- See 74 FR 39349, 08/06/2009)

W08/2009 
009/1977 
1.136

Design Limits, Loading Combinations, Materials, Construction, and Testing of Concrete Containments

402/2021 
303/2007 
206/1981 
110/1978 
011/1977 
1.137

Fuel Oil Systems for Emergency Power Supplies

206/2013Periodic Review in 2023 – Revise 
110/1979 
001/1978 
1.138

Laboratory Investigations of Soils and Rocks for Engineering Analysis and Design of Nuclear Power Plants

312/2014January 2025 - No issues identified
212/2003 
104/2003 
004/1978 
1.139Guidance for Residual Heat Removal (for Comment)
(Withdrawn -- See 73 FR 32750, 06/10/2008)
W06/2008 
005/1978 
1.140

Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Normal Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants

308/2016 
206/2001 
110/1979 
003/1978 

To top of page