The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Resolution of Generic Safety Issue 188: SteamGenerator Tube Leaks or Ruptures Concurrent with Containment Bypass from MainSteam Line or Feedwater Line Breaches (NUREG-1919)

On this page:

Download complete document

Publication Information

Manuscript Completed: December 2006
Date Published: August 2009

Prepared by:
E. Reichelt

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This report addresses Generic Safety Issue (GSI) 188, “Steam Generator Tube Leaks or Ruptures Concurrent with Containment Bypass from Main Steam Line or Feedwater Line Breaches,” which concerns the potential for additional tube leakage or ruptures from the growth of existing cracks in steam generator tubes resulting from the dynamic loads following a main steam line break (MSLB) or feedwater line break (FWLB). To address the issue, this report provides the technical findings from thermal-hydraulic transient analyses and sensitivity studies, a simplified finite-element model of steam generator support structures and tubes, and structural analyses and sensitivity studies of the potential for crack growth. The results show that the additional dynamic loads from an MSLB are greater than those from an FWLB. The report concludes that dynamic loads from an MSLB are low and do not affect the structural integrity of tubes and do not lead to additional leakage or ruptures beyond what would be determined using differential pressure loads alone. Therefore, GSI-188 is closed, and the staff recommends no changes to existing regulations or guidance with respect to the dynamic loads induced by a breach of the main steam or feedwater line.