The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update - Annual Report for Calendar Year 2023 (NUREG-1885, Revision 17)

On this page:

Download complete document

Publication Information

Manuscript Completed: July 2024
Date Published: September 2024

Office of Nuclear Security and Incident Response
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This report fulfills the requirements of Section 170D.e of the Atomic Energy Act of 1954 (42 U.S.C. §2210 d.(e)), as amended, which states, "not less often than once each year, the Commission shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Energy and Commerce of the House of Representatives a report, in classified form and unclassified form, that describes the results of each security response evaluation conducted and any relevant corrective action taken by a licensee during the previous year." Additionally, Section 170D.a of the Atomic Energy Act of 1954 (42 U.S.C. §2210 d.(a)), as amended, grants the U.S. Nuclear Regulatory Commission (NRC) the authority to determine which licensed facilities must undergo these security evaluations. The NRC is reporting the security response evaluation results for the Nation's fleet of operating commercial nuclear power plants (NPPs) and Category I (CAT I) fuel cycle facilities, given the significance of the nature, form, and quantity of nuclear material at these facilities. With respect to NPPs, the scope of this report includes those undergoing decommissioning but not yet transitioned to a dry storage independent spent fuel storage installation and those undergoing a restart due to the continued implementation of Title 10 of the Code of Federal Regulations Part 73, "Physical Protection of Plants and Materials." This report includes a comprehensive overview of the combined results of the security programs for calendar year (CY) 2023. To aid in understanding the context of how the NRC conducts inspections, this report also provides descriptions and programmatic status updates for relevant NRC programs, including the Reactor Oversight Process (ROP), security inspection programs for NPPs and CAT I fuel cycle facilities, and NRC's force-on-force (FOF) inspection program.