Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Knowledge Base for Post-Fire Safe-Shutdown Analysis - Draft Report for Comment (NUREG-1778)

This NUREG publication was issued for public comment, and the comment period is now closed.

On this page:

Download complete document

Publication Information

Manuscript Completed: November 2003
Date Published:
January 2004

Prepared by:
M.H. Salley

S.D. Weerakkody, NRC Project Manager

Prepared for:
Division of Systems Safety and Analysis
Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

Every operating nuclear power plant is required to have a program that demonstrates the capability to safely shut down and maintain the reactor in the event of a fire. The U.S. Nuclear Regulatory Commission (NRC) initially issued its requirements in the Fire Protection Rule set forth in Title 10, Section 50.48, of the Code of Federal Regulations (10 CFR 50.48) and Appendix R to 10 CFR Part 50. The NRC has since issued numerous related generic communications over the past 20 years. The purpose of this document is to facilitate understanding of this technically challenging process and the regulatory framework upon which it is based by compiling all essential information in a single source. This document also lays the groundwork for future risk-informed activities in the post-fire safe-shutdown area.