Risk-Based Performance Indicators: Results of Phase 1 Development (NUREG-1753)
On this page:
Download complete document
Publication Information
Manuscript Completed: November 2001
Date Published: April 2002
H. G. Hamzehee,1 Principal Author
Contributing Authors:
R. W. Youngblood2, S. A. Eide3, R. F. Buell3,
H. Dezfuli2, C. Atwood3, C. Smith2, R. Bertucio4,
L. Wolfram3, J. F. Meyer2, F. Zikria2, K. Green2
1Division of Risk Analysis and Applications
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001
2ISL, Inc.
11140 Rockville Pike
Rockville, MD 20852
3Idaho National Engineering and Environmental Laboratory
2525 N. Fremont Avenue
Idaho Falls, ID 83415
4SCIENTECH, Inc.
400 West Gowe Street
Kent, WA 98032
Availability Notice
Abstract
This report presents the results of the Phase 1 development of risk-based performance indicators (RBPIs) to potentially enhance the Reactor Oversight Process (ROP). SECY-99-007 recognized that improved performance indicators may be developed as part of the evolution of the ROP. RBPIs reflect changes in licensee performance that are logically related to risk and associated models. To the extent practical, the RBPIs identify declining performance before performance becomes unacceptable, without incorrectly identifying normal variations as degradations (i.e., avoid false-positive indications and false-negative indications). Phase 1 of the RBPI development includes performance indicators that are related to the initiating events cornerstone, mitigating systems cornerstone, and the containment portion of the barrier integrity cornerstone. The potential integration of RBPIs into the ROP would follow the change process described in IMC-0608, "Performance Indicator Program."
Page Last Reviewed/Updated Tuesday, March 09, 2021