The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Fort Saint Vrain Gas Cooled Reactor Operational Experience (NUREG/CR-6839, ORNL/TM-2003/223)

On this page:

Download complete document

Publication Information

Manuscript Completed: September 2003
Date Published:
January 2004

Prepared by:
D.A. Copinger, D.L. Moses
Oak Ridge National Laboratory
Oak Ridge, Tennessee 37831-6487
Managed by UT-Battelle, LLC

L.R. Cupidon, NRC Program Manager

Prepared for:
Division of Systems Analysis and Regulatory Effectiveness
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

NRC Job Code Y6695

Availability Notice

Abstract

Oak Ridge National Laboratory (ORNL) performed an operational events assessment of Fort St. Vrain (FSV) nuclear power plant during 1981–1989. As part of that assessment, the ORNL principal investigator filed 96 monthly reports detailing the results of each month's analysis. This project reviewed those 96 monthly reports and identified pertinent operating experiences that occurred at FSV which may be applicable to current or future gas cooled reactor (GCR) designs.

Two hundred seventy-nine events were catalogued into seven general categories: (1) water incursion events or failures of moisture detection systems; (2) air or other unwanted gas incursion events and failures of gas detection systems; (3) fuel failures or anomalies; (4) failures or cracks in graphite, pipes, and other reactor structural components; (5) failures of nuclear instrumentation systems; (6) human factors and operator performance issues; and (7) other events or conditions that may be relevant to current GCR designs. Several events were reviewed over a period of years and appeared in more than one monthly report.

Page Last Reviewed/Updated Wednesday, March 24, 2021