The Battelle Integrity of Nuclear Piping (BINP) Program Final Report: Appendices (NUREG/CR-6837, Volume 2)

On this page:

Download complete document

Publication Information

Manuscript Completed: September 2003
Date Published: June 2005

Prepared by:
P. Scott, R. Olson, J. Bockbrader, M. Wilson, B. Gruen,
R. Morbitzer, Y. Yang, C. Williams, F. Brust, L. Fredette, N. Ghadiali Battelle
505 King Avenue
Columbus, Ohio 43201

G. Wilkowski, D. Rudland, Z. Feng, R. Wolterman
Engineering Mechanics Corporation of Columbus (Subcontractor)
3518 Riverside Drive, Suite 202
Columbus, Ohio 43221-1735

C.A. Greene, NRC Project Manager

Prepared for:
Division of Engineering Technology
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

NRC Job Code W6775

Availability Notice

Abstract

Volume I of the final report for the Battelle Integrity of Nuclear Piping (BINP) program provided a summary of the results from this program and a discussion of the implications of those results. This volume (Volume II - Appendices) provides the details from the various technical tasks conducted as part of this program. Each individual appendix provides the details of a specific task conducted as part of the BINP program.

Page Last Reviewed/Updated Thursday, March 25, 2021