December 2004 |
Date |
Document Number |
Description |
12/30/2004 |
04-167 |
NRC Restores Documents on LES, USEC and New Reactors to Public Availability |
12/30/2004 |
04-166 |
NRC Renews License for Interim Spent Fuel Storage Installation at G.E. Morris Facility in Illinois |
12/28/2004 |
I-04-058 |
NRC to Discuss Results of Special Inspection at Hope Creek Plant |
12/22/2004 |
04-165 |
NRC Extends Public Comment Period on Proposed Uranium Enrichment Plant in New Mexico until Jan. 7 |
12/20/2004 |
04-164 |
NRC Issues Draft Safety Evaluation for North Anna Early Site Permit Application |
12/17/2004 |
II-04-058 |
NRC Staff Seeks Input On Browns Ferry Nuclear Plant Draft Environmental Impact Statement For License Renewal |
12/16/2004 |
I-04-057 |
NRC Finds Violations of Low Safety Significance at Vermont Yankee Nuclear Power Plant |
12/16/2004 |
04-163 |
NRC Plans to Issue License Renewal Exemption for Oyster Creek Nuclear Station |
12/15/2004 |
04-162 |
NRC Enhances Public Meeting Schedule on its Web Site |
12/15/2004 |
04-161 |
NRC Expands Eligibility Categories for Seeking Access to Classified Information |
12/15/2004 |
04-160 |
NRC to Hold 17th Annual Regulatory Information Conference March 8 - 10 in Rockville, MD |
12/14/2004 |
04-159 |
NRC Meeting with PSEG Nuclear Dec. 17 Concerning Hope Creek Maintenance Issues |
12/13/2004 |
04-158 |
NRC Advisory Subcommittee to Discuss Proposed MOX Facility Report Dec. 15-16 in Rockville, Maryland |
12/10/2004 |
I-04-056 |
NRC Rejects License Renewal Applications for Pennsylvania Company |
12/09/2004 |
II-04-057 |
NRC Staff to Meet with TVA to Discuss Browns Ferry Nuclear Plant License Renewal Inspection |
12/09/2004 |
04-157 |
NRC Approves Evaluation Method for Analyzing Reactor Containment Sump Performance |
12/09/2004 |
I-04-055 |
NRC to Hold Public Meetings Regarding Draft Environmental Report for Millstone Nuclear Plant License Renewal Application |
12/09/2004 |
IV-04-046 |
NRC Assigns New Resident Inspector to Palo Verde Nuclear Generating Station |
12/08/2004 |
04-156 |
NRC Approves 40-Year License Renewal for Independent Spent Fuel Storage Installation at Surry Nuclear Plant |
12/08/2004 |
04-155 |
NRC Advisory Committee on Nuclear Waste to Meet Dec. 13-14 in Rockville, Maryland |
12/07/2004 |
04-154 |
NRC to Hold Predecisional Enforcement Conference on Duke Amendment Request for Catawba Nuclear Station |
12/07/2004 |
04-153 |
NRC Restores Online Availability of Large Number of Reactor-Related Documents |
12/07/2004 |
04-152 |
NRC Seeks Public Input on North Anna Early Site Permit Application; Meeting to Be Held Jan. 19 |
12/07/2004 |
IV-04-045 |
NRC Staff to Meet with Entergy Operations, Inc. to Discuss Arkansas Nuclear One License Renewal Inspections |
12/03/2004 |
II-04-056 |
NRC to Meet with U.S. Enrichment Corporation to Discuss Performance at Paducah Gaseous Diffusion Plant |
12/02/2004 |
I-04-054 |
NRC Issues Two Inspection Reports on Vermont Yankee; Schedules Meeting |
12/01/2004 |
04-151 |
NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for Brunswick Nuclear Power Plant |
12/01/2004 |
04-150 |
NRC Licenses Spent Nuclear Fuel Storage Facility at Idaho National Engineering and Environmental Laboratory |
12/01/2004 |
III-04-051 |
NRC to Discuss Final Decommissioning of Twin Cities Army Ammunition Plant |
November 2004 |
Date |
Document Number |
Description |
11/30/2004 |
III-04-050 |
NRC Davis-Besse Oversight Panel to Meet Dec. 6 in Ohio |
11/29/2004 |
04-149 |
NRC Advisory Committee on Reactor Safeguards to Meet Dec. 2-4 in Rockville, Maryland |
11/24/2004 |
I-04-053 |
NRC to Discuss Performance Improvement Actions at Salem and Hope Creek Nuclear Power Plants |
11/24/2004 |
04-147 |
NRC Increases Civil Monetary Penalties to Reflect Inflation |
11/23/2004 |
04-148 |
NRC Revises Regulations for Structures, Systems and Components for Nuclear Power Plants |
11/19/2004 |
04-146 |
NRC Extends Comment Period for Environmental Impact Statement on Proposed Uranium Facility in New Mexico |
11/18/2004 |
04-145 |
Dr. Michael T. Ryan and Allen G. Croff Elected to New Positions on NRC Advisory Committee |
11/16/2004 |
04-144 |
NRC Restores Additional, Hearing-Related Documents to its Web Site |
11/15/2004 |
04-143 |
NRC to Hold Public Meeting Nov. 22-23 on Analyzing Nuclear Power Plant Fire Hazards |
11/10/2004 |
04-142 |
NRC Advisory Committee on Nuclear Waste to Meet Nov. 16-18 in Rockville, Maryland |
11/09/2004 |
III-04-049 |
NRC to Meet with FirstEnergy on Nuclear Plant Performance |
11/08/2004 |
04-141 |
NRC Seeks Public Comment on Implementation of Reactor Oversight Process |
11/05/2004 |
I-04-052 |
NRC Postpones Two Meetings with Entergy Scheduled for Nov. 9 and Issues Preliminary Results for Engineering Inspection at VY |
11/04/2004 |
04-140 |
NRC Restores Various Documents Removed from Web Site for Security Review |
11/03/2004 |
II-04-055 |
NRC to Meet with U.S. Enrichment Corporation Officials November 9 to Discuss Performance at Portsmouth Gaseous Diffusion Plant |
11/03/2004 |
I-04-051 |
NRC Staff to Meet with Entergy Nuclear Vermont Yankee to Discuss Preliminary Results of Two Inspections |
October 2004 |
Date |
Document Number |
Description |
10/28/2004 |
III-04-048 |
NRC Seeks Public Input on Environmental Impact Statement for Proposed D.C. Cook Nuclear Plant License Renewal |
10/28/2004 |
I-04-050 |
Nuclear Gauge Reported Stolen in Virginia; Recovery of Device is Sought |
10/28/2004 |
04-139 |
NRC Approves Stretch Power Uprate for Indian Point Unit 2 |
10/28/2004 |
04-138 |
NRC Renews Licenses for Dresden and Quad Cities Nuclear Power Plants for an Additional 20 Years |
10/28/2004 |
04-137 |
Cornell University to Provide Neutral Mediators for NRC's Alternative Dispute Resolution Program |
10/27/2004 |
II-04-054 |
NRC Staff Schedules Public Meeting for November 4 to Discuss License Renewal Process for Brunswick Nuclear Plant |
10/27/2004 |
IV-04-044 |
NRC to Conduct Special Inspection at Humboldt Bay |
10/26/2004 |
I-04-049 |
NRC Proposes $44,400 Civil Penalty for Baxter Healthcare Corp. over Irradiator Event at Puerto Rico Facility |
10/26/2004 |
04-136 |
NRC Advisory Committee on Reactor Safeguards to Meet Nov. 4-6 in Rockville, Maryland |
10/25/2004 |
04-135 |
NRC Initiates Additional Security Review of Publicly Available Documents; Temporarily Suspends Agency's On-line Library |
10/25/2004 |
04-134 |
NRC Announces Availability of License Renewal Application for Brunswick Steam Electric Plant, Units 1 and 2 |
10/21/2004 |
IV-04-043 |
NRC Staff to Meet with Energy Northwest to Discuss Columbia Generating Station Issues |
10/19/2004 |
III-04-047 |
NRC Staff to Meet Oct. 28 with FirstEnergy Officials to Review Performance Improvement Activities at Perry Nuclear Plant |
10/19/2004 |
I-04-048 |
New Location Announced for Oral Arguments on Petitions Seeking Hearings on Proposed Vermont Yankee Power Uprate |
10/18/2004 |
II-04-053 |
NRC to Meet with Framatome Nuclear Fuel Plant Officials October 28 to Discuss Facility Safety Performance |
10/15/2004 |
04-133 |
NRC Extends Review Schedule for Vermont Yankee Nuclear Power Plant Uprate Request |
10/15/2004 |
I-04-047 |
NRC, Dominion Nuclear to Discuss Inspections on Millstone License Renewal on October 20th |
10/14/2004 |
I-04-046 |
NRC Begins Special Inspection at Hope Creek Nuclear Power Plant |
10/14/2004 |
04-132 |
NRC to Hold Public Meeting on Proposed Rule on Requirements for Export or Import of Radioactive Materials |
10/14/2004 |
04-131 |
NRC Advisory Committee on Nuclear Waste to Meet Oct. 19-21 in Rockville, Maryland |
10/14/2004 |
IV-04-042 |
NRC Proposes $3,000 Fine Against Integrated Production Services, Inc. |
10/12/2004 |
04-130 |
NRC Approves Third License Amendment for Nuclear Fuel Services' Blended Low-Enriched Uranium Project |
10/12/2004 |
I-04-045 |
ASLB to Hear Oral Arguments on Petitions Seeking Hearings on Proposed Vermont Yankee Power Uprate |
10/07/2004 |
04-129 |
NRC Sets Schedule for Review of USEC Application; Offers Opportunity to Request Participation in Hearing |
10/07/2004 |
04-128 |
NRC Proposes $9,600 Fine Against Virginia Firm in Whistleblower Case |
10/06/2004 |
04-127 |
NRC Staff to Hold Public Meeting in Atlanta Oct. 13-15 on Fire Protection Standard, Inspections |
10/06/2004 |
04-126 |
Dr. Richard S. Denning Appointed to NRC Advisory Committee |
10/05/2004 |
04-125 |
NRC Chairman Discusses Nuclear Plant Security at Americas Nuclear Energy Symposium |
10/04/2004 |
04-124 |
Public Meeting Oct. 14 in Eunice, N.M., to Discuss Draft Environmental Impact Statement for Proposed Uranium Plant |
10/04/2004 |
IV-04-041 |
NRC Staff Seeks Public Comment on Draft Report that Finds ANO-2 License Renewal Environmentally Acceptable |
10/01/2004 |
04-123 |
NRC Web Page Describes Process for Updating Guidance on Reactor License Renewal |
10/01/2004 |
04-122 |
NRC Offers Opportunity for Hearing on Relicensing Application for NIST Test Reactor |
September 2004 |
Date |
Document Number |
Description |
09/30/2004 |
04-121 |
NRC Advisory Committee on Medical Uses of Isotopes to Hold a Teleconference Oct. 5 |
09/30/2004 |
04-120 |
NRC Annual Nuclear Safety Research Conference to Be Held Oct. 25-27 in Washington, D.C. |
09/28/2004 |
II-04-052 |
NRC Cites Oconee Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance |
09/28/2004 |
IV-04-040 |
NRC Names John Hanna Senior Resident Inspector at Fort Calhoun Nuclear Plant |
09/24/2004 |
04-119 |
NRC Advisory Committee on Reactor Safeguards to Meet Oct. 7-9 in Rockville, Maryland |
09/22/2004 |
III-04-046 |
NRC Davis-Besse Oversight Panel to Meet Sept. 28 in Ohio |
09/22/2004 |
04-118 |
NRC to Hold Public Meeting Sept. 30 to Discuss Certain Fiscal Year 2005 Emphasis Areas |
09/21/2004 |
II-04-050 |
NRC Staff to Meet with Southern Nuclear to Discuss Second Farley Plant License Renewal Inspection |
09/21/2004 |
II-04-051 |
NRC Staff and Duke Energy to Discuss Corrective Actions for Two Oconee Nuclear Plant White Findings |
09/20/2004 |
I-04-044 |
NRC, Exelon to Discuss Apparent Violation at Oyster Creek Plant |
09/20/2004 |
04-117 |
Note to Editors: NRC Issues Preliminary Risk Analysis of the Combined Safety Issues at Davis-Besse |
09/17/2004 |
II-04-049 |
NRC to Meet with Honeywell Officials on September 30 to Discuss Long-Term Improvement Plans for Metropolis Plant |
09/17/2004 |
II-04-048 |
NRC Cites Surry Nuclear Power Plant for Inspection Findings of Low to Moderate Safety Significance |
09/17/2004 |
IV-04-039 |
NRC to Meet with Pacific Gas & Electric to Discuss Radioactive Material Control Program at Humboldt Bay Nuclear Plant |
09/17/2004 |
IV-04-038 |
NRC to Discuss Safety Significance of Inspection Finding at Cooper Nuclear Station |
09/16/2004 |
04-116 |
NRC Advisory Committee on Nuclear Waste to Meet Sept. 22-23 in Las Vegas, Nevada |
09/16/2004 |
I-04-043 |
NRC, FPL to Discuss Apparent Violation at Seabrook Nuclear Plant |
09/15/2004 |
IV-04-037 |
NRC Dispatches Staff in Preparation for Hurricane Ivan |
09/15/2004 |
04-115 |
NRC Proposes Tougher Export-Import Requirements for High-Risk Radioactive Materials |
09/14/2004 |
04-113 |
NRC Testifies on Nuclear Power Plant Security Before Congressional Subcommittee |
09/14/2004 |
IV-04-036 |
NRC Assigns New Resident Inspector to Callaway Nuclear Plant |
09/14/2004 |
04-114 |
NRC Issues Generic Letter Concerning Potential Reactor Containment Sump Issue |
09/13/2004 |
04-111 |
Revised: NRC Modifies Availability of Security Information for All Nuclear Plants |
09/13/2004 |
04-112 |
NRC Issues Final Safety Evaluation Report and Final Design Approval for Westinghouse AP1000 Advanced Reactor Design |
09/09/2004 |
I-04-042 |
NRC Seeks Public Input on Environmental Impact Statement for Proposed Nine Mile Point Nuclear Plant License Renewal |
09/09/2004 |
04-110 |
NRC Unveils New Emergency Preparedness and Incident Response Web Page |
09/08/2004 |
04-109 |
NRC Seeks Public Comment on Decommissioning Plan for University of Michigan Research Reactor |
09/08/2004 |
04-108 |
NRC Issues Third National Report for the Convention on Nuclear Safety |
09/07/2004 |
04-107 |
NRC Releases York, Pa., Site for Unrestricted Use |
09/02/2004 |
04-106 |
NRC Issues Mid-Cycle Assessments for All Nuclear Plants |
09/01/2004 |
04-105 |
NRC Advisory Committee on Reactor Safeguards to Meet Sept. 9-11 in Rockville, Maryland |
09/01/2004 |
04-104 |
Advisory Committee on the Medical Uses of Isotopes to Meet October 13 - 14 in Rockville, Maryland |
09/01/2004 |
04-103 |
NRC Staff Issues Generic Letter on Nuclear Power Plant Steam Generator Inspections |
August 2004 |
Date |
Document Number |
Description |
08/31/2004 |
04-102 |
Note to Editors: New Public Affairs Officer in NRC Headquarters |
08/31/2004 |
04-101 |
NRC Licensing Board Issues Decision on Adequacy of Doe Document Production Relating to Yucca Mountain Licensing Proceeding |
08/30/2004 |
04-100 |
NRC to Meet with Local Residents Tuesday in Sioux Falls to Discuss Final Cleanup of Former Nuclear Reactor Site |
08/30/2004 |
I-04-041 |
Nuclear Gauge Reported Stolen In New Jersey; Recovery is Sought
|
08/25/2004 |
II-04-047 |
NRC to Discuss Safety Significance of Inspection Finding at Oconee Nuclear Plant |
08/24/2004 |
04-099 |
NRC Releases Cleaned-up Pennsylvania Site for Unrestricted Use |
08/24/2004 |
I-04-040 |
NRC Proposes $7,500 Fine Against N.J. Firm for Alleged Nuclear Gauge Violations |
08/23/2004 |
04-098 |
NRC Issues Policy Statement on Environmental Justice |
08/20/2004 |
IV-04-035 |
NRC to Conduct Inspections at Palo Verde Nuclear Generating Station |
08/20/2004 |
III-04-045 |
NRC Proposes $3,000 Fine Against Michigan Firm for Failing to Adequately Secure Nuclear Gauge |
08/18/2004 |
04-097 |
NRC Approves Request by Utah to Amend its Agreement with Agency |
08/13/2004 |
04-096 |
NRC Confirms Nuclear Plants' Operational Preparedness with Respect to Electric Grid Reliability |
08/13/2004 |
II-04-046 |
NRC Says Florida Nuclear Power Plants Prepared for Hurricane Charley |
08/12/2004 |
04-095 |
NRC to Hold Public Meeting August 17 on Planned Application for Advanced Candu Reactor Design |
08/12/2004 |
III-04-044 |
NRC to Increase Regulatory Oversight of Perry Nuclear Plant |
08/12/2004 |
04-094 |
NRC Revises Enforcement Policy to Include Alternative Dispute Resolution |
08/12/2004 |
II-04-045 |
NRC Staff Seeks Input on Farley Nuclear Plant Draft Environmental Report for License Renewal |
08/12/2004 |
04-093 |
NRC Issues New Strategic Plan |
08/11/2004 |
I-04-039 |
NRC Assigns New Senior Resident Inspector to Susquehanna Steam Electric Station |
08/11/2004 |
I-04-038 |
New NRC Senior Resident Inspector Assigned to Limerick Generating Station |
08/09/2004 |
IV-04-034 |
NRC Assigns New Senior Resident Inspector to Columbia Generating Station |
08/06/2004 |
04-092 |
NRC Announces Team, Schedule for Engineering Inspection at Vermont Yankee |
08/06/2004 |
II-04-044 |
Zeiler Named NRC Senior Resident Inspector at Summer Nuclear Plant |
08/06/2004 |
II-04-043 |
McCoy Named NRC Senior Resident Inspector at Vogtle Nuclear Plant |
08/06/2004 |
II-04-042 |
Garrett Named NRC Senior Resident Inspector at Surry Nuclear Station |
08/04/2004 |
04-091 |
NRC Modifies Availability of Security Information for All Nuclear Plants |
08/02/2004 |
04-090 |
NRC to Hold Public Meeting August 17 on Issues Associated with Large Loss-of-Coolant Accidents |
July 2004 |
Date |
Document Number |
Description |
07/30/2004 |
04-089 |
NRC Staff Makes its Yucca Mountain Documents Available |
07/30/2004 |
II-04-041 |
NRC Proposes $24,000 Fine Against Westinghouse for Alleged Violations at Commercial Nuclear Fuel Plant in Columbia, S.C. |
07/21/2004 |
04-088 |
NRC Announces Opportunity for Hearing on Application to Renew Nine Mile Point Operating Licenses |
07/16/2004 |
III-04-043 |
NRC Special Inspection into Causes of Reactor Shutdown and Associated Equipment Problems at Clinton |
07/15/2004 |
I-04-037 |
NRC Updates Public on Indian Point Spent Fuel Storage Plans |
07/15/2004 |
04-087 |
NRC Approves Power Uprate for Palisades |
07/15/2004 |
04-086 |
NRC Names Allen G. Croff to Advisory Committee on Nuclear Waste |
07/14/2004 |
04-085 |
NRC Advisory Committee on Nuclear Waste to Meet July 20 - 22 in Rockville, Maryland |
07/13/2004 |
III-04-042 |
NRC to Hold Public Meeting July 21 on Decommissioning Plans for Thorium-Contaminated Sites Near Bay City, Michigan |
07/09/2004 |
04-084 |
Atomic Safety and Licensing Board to Hold Hearing on Use of Mixed-Oxide Fuel at Catawba |
07/08/2004 |
III-04-041 |
NRC to Meet with Detroit Firm on Apparent Transportation and Storage Violations |
07/08/2004 |
04-083 |
NRC Finds No Significant Environmental Impacts from Extended Operation of Dresden and Quad Cities Nuclear Plants |
07/07/2004 |
04-082 |
NRC Names Pre-License Application Presiding Officer to Resolve Disputes on Submittal of Yucca Mountain Documents |
07/07/2004 |
III-04-040 |
NRC Davis-Besse Oversight Panel to Meet July 13 in Ohio |
07/06/2004 |
I-04-036 |
NRC to Meet with Public to Discuss Spent Fuel Storage at Indian Point |
07/01/2004 |
I-04-035 |
NRC to Meet with Public in New York on Nine Mile Point License Renewal |
07/01/2004 |
04-081 |
NRC Announces Opportunity for Hearing on Application to Increase Power Output of Vermont Yankee |
07/01/2004 |
IV-04-033 |
NRC to Meet with Pacific Gas & Electric to Discuss Diablo Canyon Issues |
07/01/2004 |
IV-04-032 |
NRC to Discuss Findings of Palo Verde Augmented Inspection |
June 2004 |
Date |
Document Number |
Description |
06/30/2004 |
04-080 |
NRC Advisory Committee on Reactor Safety to Meet July 7 - 9 in Rockville, Maryland |
06/29/2004 |
IV-04-031 |
NRC to Discuss Performance of San Onofre Nuclear Generating Station July 29 |
06/29/2004 |
IV-04-030 |
Diablo Canyon Meeting to Be Rescheduled |
06/28/2004 |
04-079 |
NRC Updates Vermont Public Service Board on Status of Vermont Yankee Uprate Review |
06/25/2004 |
04-078 |
NRC Atomic Safety and Licensing Board to Hold Prehearing Conference June 30 on Proposed Millstone License Renewal |
06/24/2004 |
IV-04-027 |
NRC to Discuss Performance of Grand Gulf on July 22 |
06/24/2004 |
IV-04-028 |
NRC to Discuss Performance of Comanche Peak July 15 |
06/24/2004 |
IV-04-029 |
NRC to Discuss Performance of Columbia Generating Station July 22 |
06/24/2004 |
I-04-034 |
NRC Proposes $7,500 Fine Against Connecticut Company |
06/23/2004 |
IV-04-026 |
NRC to Discuss Performance of Waterford 3 Nuclear Plant July 22 |
06/23/2004 |
04-077 |
NRC Receives Awards for Excellence in Performance and Accountability Reporting |
06/22/2004 |
IV-04-025 |
NRC Staff to Meet with Pacific Gas & Electric to Discuss Diablo Canyon Issues |
06/21/2004 |
III-04-039 |
NRC Proposes $19,200 Fine Against U.S. Inspection Services for a Radiation Overexposure to Worker |
06/17/2004 |
I-04-033 |
License Termination Plan for Yankee Nuclear Power Plant to Be Discussed at Public Meeting on June 24 |
06/17/2004 |
04-076 |
NRC Publishes Alternative Fire Protection Rule |
06/16/2004 |
III-04-038 |
NRC to Discuss Perry Inspection Findings with FirstEnergy Officials |
06/15/2004 |
IV-04-024 |
NRC Sends Augmented Inspection Team to Palo Verde |
06/15/2004 |
04-075 |
NRC Seeks Topics for Upcoming 17th Annual Regulatory Information Conference |
06/14/2004 |
04-074 |
NRC to Hold Public Meeting June 17 to Discuss Risk-Informed Approach to Reactor Containment Sump Issue |
06/14/2004 |
04-073 |
NRC Advisory Committee on Nuclear Waste to Meet June 22-24 in Rockville, Maryland |
06/10/2004 |
04-072 |
NRC Staff Approves Transfer of Operating License for Kewaunee |
06/10/2004 |
04-071 |
NRC Board to Hold Prehearing Conference June 21 - 23 in Rockville, Md., on Early Site Permit Applications |
06/10/2004 |
04-070 |
NRC Establishes Additional Requirements for Electronic Submission of Documents on Yucca Mountain |
06/09/2004 |
I-04-032 |
NRC to Discuss Performance, Work Environment Assessments of Hope Creek and Salem Nuclear Power Plants |
06/08/2004 |
III-04-037 |
NRC to Hold Public Meeting June 15 on Proposed License Renewal of Point Beach Nuclear Plant |
06/07/2004 |
04-069 |
NRC to Hold Public Meeting June 23 in Piketon, Ohio, to Discuss Licensing Process for Proposed Uranium Enrichment Facility |
06/04/2004 |
04-068 |
Atomic Safety and Licensing Board to Hear Arguments June 15 - 16 in Hobbs, N.M., on Proposed Uranium Enrichment Facility |
06/04/2004 |
04-067 |
NRC Staff Approves Transfer of Operating License for R.E. Ginna Nuclear Power Plant |
06/03/2004 |
04-066 |
NRC Staff Issues Bulletin to Nuclear Power Plants on Inspecting Certain Reactor Piping Components |
06/02/2004 |
III-04-036 |
NRC to Meet with Nuclear Management Company to Discuss Performance of Prairie Island Nuclear Plant |
06/01/2004 |
II-04-040 |
Atomic Safety And Licensing Board to Hear Public Statements on Use of Mixed Oxide Fuel at Catawba |
May 2004 |
Date |
Document Number |
Description |
05/28/2004 |
04-065 |
NRC Announces Availability of License Renewal Application for Nine Mile Point Nuclear Station, Units 1 and 2 |
05/27/2004 |
I-04-031 |
New NRC Resident Inspector Assigned to Indian Point 3 Nuclear Plant |
05/27/2004 |
04-064 |
NRC to Conduct Pilot Inspection Program Focused on Nuclear Plant Engineering and Design Issues |
05/26/2004 |
IV-04-023 |
NRC to Discuss Performance of South Texas Project Nuclear Plant June 3 |
05/25/2004 |
III-04-035 |
NRC to Meet with Nuclear Management Company to Discuss Performance of Kewaunee Nuclear Plant |
05/24/2004 |
04-063 |
Nuclear Regulatory Commission Honors Employees on May 27 in Rockville, MD |
05/24/2004 |
III-04-034 |
NRC Begins Special Inspection of Pump Failure at Perry Nuclear Plant |
05/20/2004 |
04-062 |
NRC Advisory Committee on Reactor Safeguards to Meet June 2 - 4 in Rockville, Maryland |
05/19/2004 |
04-061 |
NRC Renews License for R.E. Ginna Nuclear Power Plant, for an Additional 20 Years |
05/19/2004 |
IV-04-022 |
NRC to Hold Two Public Meetings on Issues Regarding Diablo Canyon Power Plant |
05/19/2004 |
04-060 |
NRC Updates Construction Inspection Procedures for Possible New Nuclear Plants |
05/18/2004 |
04-059 |
NRC to Hold Public Meeting May 25 to Discuss a Risk-Informed Approach to Reactor Containment Sump Issue |
05/14/2004 |
04-058 |
NRC Advisory Committee on Nuclear Waste to Meet May 25 - 27 in Rockville, Maryland |
05/13/2004 |
III-04-033 |
NRC to Meet with Nuclear Management Company to Discuss Performance of Monticello Nuclear Plant |
05/12/2004 |
04-057 |
NRC Establishes Web Page for Information on Current Technical Issues at Vermont Yankee |
05/12/2004 |
04-056 |
NRC Approves Testing of Full-Scale Rail Cask for Transportation of Spent Fuel |
05/11/2004 |
I-04-030 |
NRC Seeks Public Input on Environmental Impact Statement for Proposed Millstone Nuclear Plant License Renewal |
05/11/2004 |
II-04-039 |
NRC Staff Cites Honeywell Illinois Plant for Violating NRC Regulations |
05/11/2004 |
I-04-029 |
NRC to Discuss Annual Performance Assessment of Nine Mile Point 1 and 2 Nuclear Power Plants |
05/10/2004 |
I-04-028 |
NRC to Discuss Annual Performance Assessment of Three Mile Island 1 Nuclear Power Plant |
05/07/2004 |
II-04-038 |
NRC Schedules Regulatory Conference to Discuss Inspection Finding at Brunswick Nuclear Plant |
05/07/2004 |
II-04-037 |
NRC Staff to Hold Public Meeting with Southern Nuclear May 14 to Discuss Initial Farley Plant License Renewal Inspection |
05/07/2004 |
I-04-027 |
NRC Proposes $7,500 Fine Against New Jersey Firm for Failing to Maintain Control of Nuclear Gauge |
05/06/2004 |
III-04-032 |
NRC Begins Special Inspection of Shutdown at Dresden Nuclear Plant |
05/06/2004 |
III-04-031 |
Meeting to Discuss Results of a Special Inspection at D.C. Cook |
05/06/2004 |
III-04-030 |
NRC Davis-Besse Oversight Panel to Meet May 13 in Ohio |
05/05/2004 |
04-055 |
NRC Provides Update on Review Process for Vermont Yankee Uprate Request |
05/04/2004 |
04-053 |
Note to Editors: NRC Issues Information on Studies Related to the Davis-Besse Reactor Head |
05/04/2004 |
04-054 |
NRC Issues Review Standard for Early Site Permit Applications |
05/04/2004 |
I-04-026 |
NRC Upgrades Inspection Team Looking Into Worker Exposures at Puerto Rico Irradiator Facility |
05/03/2004 |
04-052 |
NRC to Host Open House on May 10 in Nevada |
April 2004 |
Date |
Document Number |
Description |
04/30/2004 |
III-04-029 |
NRC to Meet with Nuclear Management Co. to Discuss Performance of Palisades Nuclear Plant |
04/30/2004 |
III-04-028 |
NRC to Meet with Exelon Generation Company to Discuss Performance of LaSalle Nuclear Plant |
04/28/2004 |
04-051 |
NRC Advisory Committee on Reactor Safeguards to Meet May 6 - 8 in Rockville, Maryland |
04/28/2004 |
IV-04-021 |
NRC Proposes $12,000 Fine for High Mountain Inspection Service |
04/28/2004 |
IV-04-020 |
NRC Proposes $6,000 Fine Against All Tech Corp., of Pocatello, Idaho |
04/27/2004 |
04-050 |
NRC Issues Regulatory Issue Summary Concerning Electric Grid Reliability |
04/27/2004 |
I-04-025 |
NRC Begins Special Inspection at Irradiator Facility in Puerto Rico |
04/27/2004 |
III-04-027 |
NRC to Meet with Exelon Generation Company to Discuss Performance of Dresden Nuclear Plant |
04/26/2004 |
04-049 |
NRC to Discuss Quality of Yucca Mountain Information with DOE May 5 in Las Vegas |
04/26/2004 |
04-048 |
NRC Amends Licensing, Inspection and Annual Fees Rule |
04/26/2004 |
I-04-024 |
NRC to Discuss Annual Performance Assessment of Susquehanna Nuclear Power Plant |
04/23/2004 |
II-04-036 |
NRC Names Widmann Senior Resident Inspector at North Anna Nuclear Station |
04/23/2004 |
04-047 |
NRC Renews License for Virgil C. Summer Nuclear Station, Unit 1, for an Additional 20 Years |
04/23/2004 |
III-04-026 |
NRC Issues Letter on Performance Improvement Plans for Point Beach Nuclear Power Station |
04/22/2004 |
I-04-023 |
NRC to Conduct a Special Inspection at Vermont Yankee to Look into Potentially Missing Spent Fuel Segments |
04/22/2004 |
III-04-025 |
NRC to Meet with Exelon Generation Company to Discuss Performance of Quad Cities Nuclear Plant |
04/22/2004 |
04-046 |
NRC to Hold Public Meeting May 19 on Draft Generic Letter on Reactor Containment Sump Issue |
04/21/2004 |
I-04-022 |
NRC to Discuss Annual Performance Assessment of Indian Point Nuclear Power Plants |
04/21/2004 |
04-045 |
NRC Names Directors of Communications and Office of Public Affairs |
04/21/2004 |
I-04-021 |
NRC Proposes $3,000 Fine Against W.Va. Firm for Failing to Maintain Control of Nuclear Gauge |
04/20/2004 |
IV-04-019 |
NRC to Meet with Nebraska Public Power District to Discuss Recent Inspection at Cooper Nuclear Station |
04/20/2004 |
04-044 |
NRC Seeks Public Comment on Proposed Pilot Program for Use of Alternative Dispute Resolution |
04/19/2004 |
II-04-035 |
NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Catawba Nuclear Power Plant |
04/19/2004 |
04-043 |
NRC Renews License for H.B. Robinson Steam Electric Plant, Unit 2, for an Additional 20 Years |
04/19/2004 |
II-04-034 |
NRC to Hold Predecisional Enforcement Conference to Discuss Apparent Violation at Browns Ferry |
04/17/2004 |
II-04-033 |
NRC Approves Restart of Final Stage in Uranium Hexafluoride Process at Honeywell Plant in Illinois |
04/16/2004 |
04-042 |
NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for Point Beach Nuclear Plant Units 1 and 2 |
04/15/2004 |
III-04-024 |
NRC to Meet with Exelon Generation Co. to Discuss Performance of Byron Nuclear Plant |
04/15/2004 |
III-04-023 |
NRC to Meet with Nuclear Management Company to Discuss Performance of Point Beach Nuclear Plant |
04/15/2004 |
IV-04-018 |
NRC Proposes $6,000 Fine for 21st Century Technologies |
04/14/2004 |
III-04-022 |
NRC to Meet with FirstEnergy Nuclear Operating Co. to Discuss Performance of Perry Nuclear Plant |
04/14/2004 |
II-04-032 |
NRC Approves Restart of Second Stage in Uranium Hexafluoride Process at Honeywell Plant in Illinois |
04/13/2004 |
04-041 |
NRC Issues Report on Quality of Technical Information Under Development by DOE for Yucca Mountain Application |
04/12/2004 |
II-04-031 |
NRC to Hold Meeting April 20 at NFS Nuclear Fuel Plant to Discuss NRC Performance Review of Licensee Activities |
04/12/2004 |
III-04-021 |
NRC to Meet with Exelon Generation Company to Discuss Performance of Braidwood Nuclear Plant |
04/12/2004 |
II-04-030 |
NRC to Meet with TVA Officials to Discuss Safety Performance at Browns Ferry Nuclear Power Plant |
04/12/2004 |
II-04-029 |
NRC to Meet with TVA Officials to Discuss Safety Performance at Sequoyah Nuclear Power Plant |
04/12/2004 |
IV-04-017 |
NRC to Meet with Omaha Public Power District to Discuss Performance of Fort Calhoun Nuclear Plant |
04/09/2004 |
II-04-028 |
NRC to Meet with Duke Energy Officials to Discuss Safety Performance at McGuire Nuclear Power Plant |
04/09/2004 |
II-04-027 |
NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Oconee Nuclear Power Plant |
04/09/2004 |
II-04-026 |
NRC Staff Proposes $60,000 Civil Penalty Against Duke Energy for Violation of NRC Requirements at Oconee Nuclear Power Plant |
04/09/2004 |
04-040 |
NRC Advisory Committee on Nuclear Waste to Meet April 20 - 22 in Rockville, Maryland |
04/08/2004 |
I-04-020 |
NRC to Discuss Annual Performance Assessment of Oyster Creek Nuclear Power Plant |
04/07/2004 |
II-04-025 |
NRC Staff Proposes $88,000 Civil Penalty Against Progress Energy for Terminating CP&L Employee Engaged in Protected Activity |
04/07/2004 |
II-04-024 |
NRC to Meet with Honeywell Officials in Illinois on April 21 to Discuss Improvement Efforts since December Event |
04/07/2004 |
I-04-019 |
NRC to Discuss Annual Performance Assessment of Peach Bottom Nuclear Power Plant |
04/06/2004 |
04-039 |
NRC Announces Review Schedule for Browns Ferry License Renewal Application |
04/06/2004 |
III-04-020 |
NRC Davis-Besse Oversight Panel to Meet April 8 in Oak Harbor, OH |
04/05/2004 |
II-04-023 |
NRC to Meet with Progress Energy Officials to Discuss Safety Performance at Crystal River Nuclear Power Plant |
04/05/2004 |
II-04-022 |
NRC to Meet with TVA Nuclear Officials to Discuss Safety Performance at Watts Bar Nuclear Power Plant |
04/05/2004 |
I-04-018 |
NRC to Discuss Annual Performance Assessment of Seabrook Nuclear Power Plant |
04/01/2004 |
III-04-019 |
NRC to Meet with Exelon Generation Company to Discuss Performance of Clinton Nuclear Plant |
March 2004 |
Date |
Document Number |
Description |
03/31/2004 |
I-04-017 |
NRC to Discuss Annual Performance Assessment of Limerick Nuclear Power Plant |
03/31/2004 |
II-04-021 |
NRC to Hold Open Regulatory Conference to Discuss Surry Nuclear Plant Operations |
03/31/2004 |
04-038 |
NRC Makes New Management Assignments to Expand its Focus on Safety, Security, and Preparedness |
03/30/2004 |
I-04-016 |
NRC to Discuss Annual Performance Assessment of R.E. Ginna Nuclear Power Plant |
03/30/2004 |
III-04-018 |
New Location for NRC Region III Office Beginning April 5 |
03/29/2004 |
III-04-017 |
NRC to Meet with Nuclear Management Company to Discuss Performance of Duane Arnold Nuclear Plant |
03/27/2004 |
II-04-020 |
NRC Approves Restart of First Stage in Uranium Hexaflouride Process at Honeywell Plant in Illinois |
03/26/2004 |
II-04-019 |
NRC Seeks Public Input on Browns Ferry Nuclear Plant License Renewal at Meetings in Alabama |
03/25/2004 |
III-04-016 |
NRC to Meet with Detroit Edison Company to Discuss Performance of Fermi 2 Nuclear Plant |
03/25/2004 |
04-037 |
NRC Advisory Committee on Reactor Safeguards to Meet April 15-17 in Rockville, Maryland |
03/25/2004 |
04-036 |
NRC Staff Issues Draft Letter, Concerning Potential Reactor Containment Sump Issue, for Public Comment |
03/25/2004 |
I-04-015 |
NRC to Hold Meetings on Vermont Yankee Nuclear Plant Performance and Power Uprate Review |
03/25/2004 |
III-04-015 |
NRC to Discuss the Status of Twin Cities Army Ammunition Plant Decommissioning |
03/25/2004 |
IV-04-016 |
NRC Cites Cooper Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance |
03/24/2004 |
III-04-014 |
Public Meeting March 31 on License Renewal Application for Point Beach Nuclear Power Plant |
03/24/2004 |
IV-04-015 |
NRC to Meet with Wolf Creek Nuclear Operating Co. to Discuss Performance of Wolf Creek Nuclear Plant |
03/24/2004 |
IV-04-014 |
NRC to Meet with Entergy Operations, Inc. to Discuss Performance of River Bend Nuclear Power Plant |
03/24/2004 |
04-035 |
NRC Reorganizes Office to Give Added Focus to High-Level Radioactive Waste Programs |
03/24/2004 |
IV-04-013 |
NRC to Meet with Union Electric Co. to Discuss Performance of Callaway Nuclear Power Plant |
03/23/2004 |
I-04-014 |
NRC to Discuss Annual Performance Assessment of Calvert Cliffs Nuclear Power Plant |
03/22/2004 |
II-04-018 |
NRC to Meet with Progress Energy Officials to Discuss Safety Performance at Robinson Nuclear Power Plant |
03/22/2004 |
II-04-017 |
NRC to Meet with Dominion Energy Officials to Discuss Safety Performance at North Anna Nuclear Power Plant |
03/22/2004 |
II-04-016 |
NRC to Meet with Dominion Energy Officials to Discuss Safety Performance at Surry Nuclear Power Plant |
03/22/2004 |
II-04-015 |
NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Vogtle Nuclear Power Plant |
03/22/2004 |
II-04-014 |
NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Hatch Nuclear Power Plant |
03/22/2004 |
II-04-013 |
NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Farley Nuclear Power Plant |
03/22/2004 |
04-034 |
NRC Issues License for Diablo Canyon Independent Spent Nuclear Fuel Storage Installation |
03/19/2004 |
III-04-013 |
NRC Proposes $60,000 Fine Against Point Beach Nuclear Power Plant |
03/19/2004 |
IV-04-012 |
NRC to Meet with Nebraska Public Power District to Discuss Performance of Cooper Nuclear Station |
03/18/2004 |
I-04-013 |
NRC to Discuss Annual Performance Assessment of Beaver Valley Nuclear Power Plant |
03/18/2004 |
IV-04-011 |
NRC to Meet with Entergy Operations, Inc. to Discuss Performance of Arkansas Nuclear One |
03/18/2004 |
I-04-012 |
NRC to Discuss Annual Performance Assessment of Millstone Nuclear Power Plant |
03/17/2004 |
I-04-011 |
NRC to Discuss Annual Performance Assessment of James A. FitzPatrick Nuclear Power Plant |
03/17/2004 |
II-04-012 |
NRC to Meet with Progress Energy Officials to Discuss Safety Performance at Harris Nuclear Power Plant |
03/17/2004 |
II-04-011 |
NRC to Meet with SCE&G Officials to Discuss Safety Performance at Summer Nuclear Power Plant |
03/17/2004 |
I-04-010 |
NRC to Discuss Annual Performance Assessment of Pilgrim Nuclear Power Plant |
03/17/2004 |
IV-04-010 |
NRC to Discuss Performance of Palo Verde Nuclear Plant |
03/16/2004 |
IV-04-009 |
NRC Proposes $21,000 Fine to Alaska Department of Transportation |
03/16/2004 |
III-04-012 |
NRC Suspends License of a Missouri Industrial Testing Company |
03/12/2004 |
II-04-010 |
NRC to Meet with FPL Officials to Discuss Safety Performance at St. Lucie Nuclear Power Plant |
03/12/2004 |
II-04-009 |
NRC to Meet with FPL Officials to Discuss Safety Performance at Turkey Point Nuclear Power Plant |
03/12/2004 |
04-033 |
NRC Announces Opportunity for Hearing on Application to Renew Millstone Nuclear Plant, Units 2 and 3, Operating Licenses |
03/11/2004 |
I-04-009 |
NRC Proposes $3,000 Fine Against West Virginia Firm for Failure to Constantly Control Two Nuclear Gauges |
03/11/2004 |
II-04-008 |
NRC to Meet with Honeywell Officials in Illinois on March 18 to Discuss Improvement Efforts since December Event |
03/11/2004 |
II-04-007 |
NRC to Hold Open Regulatory Conference to Discuss Brunswick Nuclear Plant Operations |
03/11/2004 |
I-04-008 |
NRC, PSEG to Discuss Work Environment at Salem, Hope Creek Nuclear Power Plants |
03/10/2004 |
04-032 |
NRC Announces Opportunity for Hearing on Application to Renew Browns Ferry, Units 1, 2 and 3 Operating Licenses |
03/08/2004 |
III-04-011 |
NRC Approves Davis-Besse Restart |
03/05/2004 |
04-031 |
NRC Issues Annual Assessments for Nation's Nuclear Plants |
03/03/2004 |
I-04-007 |
NRC Proposes $3,000 Fine Against Va. Firm over Temporary Loss of Nuclear Gauge |
03/02/2004 |
04-030 |
NRC Approves Power Uprate for Kewaunee Nuclear Power Plant |
03/02/2004 |
IV-04-008 |
NRC to Hold Regulatory Conference with Entergy Operations on Waterford Nuclear Power Plant |
03/01/2004 |
04-029 |
NRC Announces Availability of License Renewal Application for Point Beach Nuclear Power Plant |
03/01/2004 |
IV-04-007 |
NRC to Conduct Special Inspection at Palo Verde Nuclear Generating Station |
February 2004 |
Date |
Document Number |
Description |
02/27/2004 |
III-04-010 |
NRC to Hold Public Meeting March 8 on Proposed License Renewal of D. C. Cook Nuclear Plant |
02/26/2004 |
I-04-006 |
NRC Proposes $3,000 Fine Against Va. Firm for Radiography Violations |
02/26/2004 |
III-04-009 |
NRC Issues Letter on Planned Davis-Besse Order |
02/25/2004 |
04-028 |
NRC Finds No Significant Environmental Impact from Extended Operation of Virgil C. Summer Nuclear Station |
02/25/2004 |
II-04-006 |
NRC to Meet with Westinghouse Nuclear Fuel Plant Officials March 3 to Discuss Facility Safety Performance |
02/25/2004 |
04-027 |
NRC Advisory Committee on Reactor Safeguards to Meet March 4 - 6 in Rockville, Maryland |
02/24/2004 |
04-026 |
NRC Issues License to U.S. Enrichment Corporation for Lead Cascade Uranium Enrichment Facility |
02/24/2004 |
II-04-005 |
NRC to Hold Predecisional Enforcement Conference to Discuss Apparent Violation of Regulatory Requirements at Oconee |
02/23/2004 |
04-025 |
NRC Modifies Order Requiring Inspection of Pressurized Water Reactor Vessel Heads |
02/19/2004 |
04-024 |
NRC Advisory Committee on the Medical Uses of Isotopes to Meet March 1 - 2 in Rockville, Maryland |
02/18/2004 |
04-023 |
NRC Schedules Public Presentation and Webcast on March 3 on Three Mile Island Accident, 25 Years Later |
02/17/2004 |
I-04-005 |
NRC Sends Special Inspection Team to Calvert Cliffs Unit 2 |
02/12/2004 |
04-022 |
NRC Offers Opportunity for Hearing on Proposed Spent Nuclear Fuel Storage Facility at Humboldt Bay |
02/12/2004 |
04-021 |
NRC Considering Request by Utah to Amend its Agreement with Agency |
02/11/2004 |
III-04-008 |
NRC Senior Officials Will Meet with Point Beach Management to Discuss Plant Performance |
02/11/2004 |
I-04-004 |
Search Under Way for Radioactive Sources Missing from N.J. Site |
02/09/2004 |
I-04-003 |
NRC Special Inspection Starts at Susquehanna Nuclear Plant |
02/09/2004 |
04-019 |
NRC Invites Public to Submit Nominations for the Advisory Committee on Reactor Safeguards |
02/09/2004 |
04-020 |
NRC to Hold Public Meeting in Eunice, N.M., on Environmental Review Process for Proposed Uranium Enrichment Plant |
02/06/2004 |
III-04-007 |
Teleconferences Available for February 12 Davis-Besse Meetings |
02/06/2004 |
I-04-002 |
NRC to Hold Public Meeting in Connecticut on License Renewal Application for Millstone 2 & 3 |
02/03/2004 |
04-016 |
Revised to Correct Dollar Amounts NRC Proposes to Amend Licensing, Inspection and Annual Fees Rule |
02/02/2004 |
04-018 |
NRC Sets Schedule for Review of LES Application; Offers Opportunity to Request Participation in Hearing |
02/02/2004 |
04-017 |
NRC Advisory Committee on Nuclear Waste to Meet February 24 - 27 in Rockville, Maryland |
January 2004 |
Date |
Document Number |
Description |
01/30/2004 |
III-04-006 |
NRC to Conduct Restart Readiness Inspection at Davis-Besse; Meetings Scheduled for February 12 in Oak Harbor, Ohio |
01/30/2004 |
II-04-004 |
NRC to Meet with NFS Officials February 5 |
01/29/2004 |
04-015 |
NRC Issues Environmental Assessment And Safety Evaluation Report on Proposed USEC Facility in Ohio |
01/29/2004 |
IV-04-006 |
NRC to Hold Two Public Meetings to Discuss Inspections at Diablo Canyon Nuclear Plant Following Earthquake |
01/28/2004 |
04-014 |
NRC to Conduct FY2005 Budget Briefing February 2 in Rockville, Maryland |
01/28/2004 |
04-012 |
NRC Finds No Significant Environmental Impact from Extended Operation of Ginna Nuclear Power Plant |
01/27/2004 |
04-013 |
NRC Modifies Financial Information Requirements for Power Reactor Licenses |
01/26/2004 |
IV-04-005 |
NRC to Hold Public Meeting on Environmental Review for Proposed Arkansas Nuclear One, Unit 2 License Renewal |
01/23/2004 |
04-011 |
NRC Makes License Renewal Application Available for the Millstone Nuclear Power Plant |
01/22/2004 |
II-04-003 |
Public Meeting February 5 on License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 |
01/21/2004 |
04-010 |
NRC Establishes Emergency Preparedness Organization in Office of Nuclear Reactor Regulation |
01/20/2004 |
III-04-005 |
NRC Dispatches Special Inspection Team to Look into Safety Injection Pump Problem at Kewaunee |
01/20/2004 |
04-009 |
NRC Advisory Committee on Reactor Safeguards to Meet February 5 - 7 in Rockville, Maryland |
01/20/2004 |
04-008 |
NRC to Hold 16th Annual Regulatory Information Conference March 10 - 12 in Washington, D.C. |
01/20/2004 |
04-007 |
NRC Issues Review Standard for Extended Power Uprates |
01/20/2004 |
04-006 |
NRC Approves Power Uprate for Fort Calhoun |
01/14/2004 |
III-04-004 |
NRC Oversight Panel to Meet on January 21 with Davis-Besse Officials in Oak Harbor |
01/14/2004 |
04-004 |
NRC Issues Report on Improving Reactor Operating Experience Programs |
01/14/2004 |
04-005 |
NRC Announces Availability of Two New Websites on Conduct of Hearings and Pending Applications |
01/13/2004 |
IV-04-004 |
NRC to Hold Public Meeting on Grand Gulf Early Site Permit |
01/13/2004 |
IV-04-003 |
NRC to Meet with Nebraska Public Power District to Discuss Recent Inspection at Cooper Nuclear Station |
01/13/2004 |
I-04-001 |
New NRC Resident Inspector Assigned to Seabrook Nuclear Plant |
01/13/2004 |
04-003 |
NRC to Hold Hearing on Early Site Permit for Grand Gulf Site; Offers Opportunity to Request Participation |
01/12/2004 |
04-002 |
NRC Historian Writes Perspective on Three Mile Island Incident, 25 Years Later |
01/09/2004 |
III-04-003 |
NRC Staff Seeks Input on Dresden Draft Environmental Report for License Renewal |
01/09/2004 |
III-04-002 |
NRC Staff to Discuss an Apparent Violation Associated with Emergency Classifications at Point Beach |
01/08/2004 |
II-04-002 |
Oral Argument on Duke's Application to Use Mixed Oxide Nuclear Fuel Scheduled for January 15 in Charlotte |
01/08/2004 |
04-001 |
NRC Announces the Availability of License Renewal Application for Browns Ferry Nuclear Power Plant |
01/06/2004 |
IV-04-002 |
NRC Proposes $6,000 Fine for Cooperheat-MQS, Inc. of Houston, Texas |
01/05/2004 |
IV-04-001 |
NRC Staff to Meet with Energy Northwest to Discuss Columbia Generating Station Issues |
01/02/2004 |
II-04-001 |
NRC to Provide Preliminary Inspection Results for Honeywell's Illinois Fuel Plant at Public Meeting on January 6 |
01/02/2004 |
III-04-001 |
NRC Proposes $60,000 Fine for Fitness for Duty Violation at Kewaunee |