News Releases - 2001
January • February • March • April • May • June • July • August • September • October • November • December
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| December | ||
|---|---|---|
| Date | Document Number | Description |
| 12/31/2001 | IV-01-054 | NRC Cites Energy Northwest for Safety Violation at Columbia Generating Station |
| 12/31/2001 | 01-138 | NRC Announces Availability of License Renewal Application for St. Lucie Units 1 and 2 |
| 12/31/2001 | 01-137 | NRC Advisory Committee on Nuclear Waste to Meet January 8 - 9 in Rockville, Maryland |
| 12/27/2001 | III-01-057 | NRC Staff Proposes $3,000 Fine Against the University of Wisconsin-Madison for Loss of Nuclear Device |
| 12/26/2001 | II-01-050 | NRC Determines Surry Nuclear Plant Diesel Generator Issue to Be of Low to Moderate Safety Significance |
| 12/26/2001 | 01-136 | NRC Approves Power Uprates for Dresden 2, 3 and Quad Cities 1, 2 |
| 12/20/2001 | 01-135 | NRC Offers to Supply Potassium Iodide to States that Request It |
| 12/18/2001 | I-01-071 | NRC Suspends License of Pennsylvania Medical Firm |
| 12/14/2001 | IV-01-053 | NRC Staff to Hold Regulatory Conference with Nebraska Public Power District |
| 12/13/2001 | 01-134 | NRC Seeks Public Comment on Use of Alternate Dispute Resolution in its Enforcement Policy |
| 12/12/2001 | I-01-070 | NRC, Entergy to Discuss Performance Issues at Indian Point 2 |
| 12/10/2001 | II-01-049 | Prehearing Conference Scheduled on McGuire and Catawba Nuclear Plant License Renewal |
| 12/07/2001 | I-01-069 | NRC Assigns New Resident Inspector at Oyster Creek Nuclear Plant |
| 12/07/2001 | III-01-056 | NRC Staff to Meet with U.S. Enrichment Corp. on Possible Safety Violations |
| 12/07/2001 | II-01-048 | NRC to Receive Comments on Draft Decommissioning Document December 12 in Atlanta |
| 12/06/2001 | I-01-068 | NRC Issues Confirmatory Action Letter to Easton, Pa., Medical Firm |
| 12/04/2001 | IV-01-052 | NRC Proposes $3,000 Fine for Centennial Engineering & Research, Inc. |
| 12/04/2001 | I-01-067 | NRC to Receive Comments on Draft Decommissioning Document at Public Meeting Scheduled for December 10 in Boston |
| 12/03/2001 | I-01-066 | 3rd Library to Make Available Peach Bottom License Renewal Information |
| November | ||
| Date | Document Number | Description |
| 11/30/2001 | 01-133 | NRC Releases Draft Review Plan for Yucca Mountain |
| 11/30/2001 | III-01-055 | NRC Seeks Comments on Draft Supplement to Environmental Statement on Decommissioning of Nuclear Facilities; Meeting Dec. 6 |
| 11/27/2001 | IV-01-051 | NRC Seeks Comments on Draft Supplement to Environmental Statement on Decommissioning of Nuclear Facilities |
| 11/26/2001 | I-01-065 | NRC, Company to Discuss Cleanup Plan for Greenville, Pa., Site |
| 11/26/2001 | II-01-047 | NRC Staff to Hold Regulatory Conference with Virginia Power |
| 11/23/2001 | 01-132 | NRC Advisory Committee on Reactor Safeguards To Meet December 5 - 8 in Rockville, Maryland |
| 11/21/2001 | IV-01-050 | NRC to Hold Regulatory Conference with Energy Northwest |
| 11/21/2001 | III-01-054 | NRC Staff to Meet with Nuclear Management Co. Nov. 27 to Discuss Safety Significance of Diesel Problem at Minnesota Plant |
| 11/20/2001 | III-01-053 | NRC Names New Resident Inspector at Byron Nuclear Power Plant |
| 11/20/2001 | 01-131 | NRC Invites Nominations for Advisory Committee on Medical Uses of Isotopes |
| 11/19/2001 | III-01-052 | NRC Staff Proposes $3,000 Fine Against a Missouri Company for Loss of Nuclear Gauge |
| 11/16/2001 | 01-130 | NRC Issues Draft Supplement to Final Environmental Statement on Decommissioning of Nuclear Facilities |
| 11/15/2001 | II-01-046 | NRC Commissioner to Speak on Nuclear Security at University of Florida on November 17 |
| 11/14/2001 | II-01-045 | NRC Commissioner to Visit St. Lucie Nuclear Plant on November 16 |
| 11/13/2001 | 01-129 | NRC Submits Comments to DOE on Yucca Mountain Information |
| 11/13/2001 | 01-128 | NRC Advisory Committee on Nuclear Waste to Meet November 27 - 29 in Rockville, Maryland |
| 11/09/2001 | III-01-051 | NRC Names New Resident Inspector at Perry Nuclear Power Plant |
| 11/09/2001 | III-01-050 | NRC Staff Proposes $3,000 Fine Against Wisconsin Company for Loss of Nuclear Gauge |
| 11/07/2001 | 01-127 | NRC Approves Power Uprate for Duane Arnold Nuclear Plant |
| 11/06/2001 | III-01-049 | NRC Staff Proposes $3,000 Fine Against Palmerton & Parrish, Inc. of Missouri for Failing to Control Licensed Material |
| October | ||
| Date | Document Number | Description |
| 10/29/2001 | I-01-063 | NRC Sends Special Inspection Team to TMI |
| 10/29/2001 | I-01-062 | Two Gauges Containing Radioactive Material Reported Stolen in Greater Philadelphia Region |
| 10/29/2001 | III-01-048 | NRC Cites Nuclear Management Company for Safety Violation at Palisades Nuclear Plant |
| 10/26/2001 | I-01-061 | NRC Seeks Public Input on Environmental Statement for Proposed Peach Bottom Nuclear Power Plant License Renewal |
| 10/23/2001 | 01-126 | NRC Concurs on Doe's Proposed Final Siting Guidelines for Yucca Mountain |
| 10/23/2001 | III-01-047 | NRC Staff Proposes $3,000 Fine Against the University of Missouri-Columbia for Violating Regulations |
| 10/22/2001 | 01-125 | NRC Advisory Committee on Reactor Safeguards to Meet November 8 - 10 in Rockville, Maryland |
| 10/18/2001 | 01-124 | Threat to Three Mile Island Nuclear Plant Deemed Non-Credible; NRC Monitoring Continues and Website Restored |
| 10/16/2001 | II-01-044 | NRC to Hold Public Meetings on Catawba Nuclear Station License Renewal |
| 10/16/2001 | II-01-043 | NRC to Hold Regulatory Performance Meeting with Duke at Oconee Nuclear Power Plant on October 19 |
| 10/16/2001 | 01-123 | NRC Approves Power Uprate for Shearon Harris Nuclear Power Plant |
| 10/16/2001 | II-01-042 | NRC Staff Proposes $88,000 Civil Penalty Against TVA based upon Department of Labor Finding of Discrimination |
| 10/15/2001 | 01-122 | NRC Approves Power Uprate for Comanche Peak Nuclear Power Plant |
| 10/11/2001 | 01-121 | NRC Seeks Early Public Comment on a Proposal to Permit Entombment for Reactor Decommissioning |
| 10/11/2001 | II-01-041 | NRC to Hold Public Meetings on North Anna Power Station License Renewal |
| 10/05/2001 | I-01-06 | NRC to Send Special Inspection to Millstone 1 to Evaluate Investigation into Missing Spent Fuel |
| 10/04/2001 | 01-120 | NRC Issues Final Rule on Storage of Certain "Greater than Class C" Waste in an Independent Spent Fuel Storage Facility |
| 10/04/2001 | 01-119 | 29th Annual Nuclear Safety Research Conference to Be Held October 22 - 24 in Washington, D.C. |
| 10/03/2001 | 01-118 | Commissioner Dr. Nils J. Diaz to Be Sworn in for Second Term |
| 10/03/2001 | II-01-040 | NRC Proposes $2,750 Civil Penalty Against Puerto Rico Laboratory for Violation of NRC Radiological Safety Requirements |
| 10/03/2001 | III-01-046 | NRC Names New Senior Resident Inspector at Paducah Gaseous Diffusion Plant |
| 10/02/2001 | 01-117 | NRC Amends Regulations to Allow Use of Simulators to Fulfill Portion of Reactor Operator Training Requirements |
| 10/02/2001 | 01-116 | NRC Seeks Public Comment on Proposed Rule Concerning Debt Collection Procedures |
| September | ||
| Date | Document Number | Description |
| 09/28/2001 | IV-01-049 | NRC Proposes $3,000 Fine for Construction Engineering Labs, Inc. |
| 09/28/2001 | IV-01-048 | NRC Names Grant F. Larkin Resident Inspector at Waterford 3 |
| 09/28/2001 | 01-115 | NRC Will Hold Public Meeting October 2 in Tennessee to Discuss DOE Tritium Production Program |
| 09/26/2001 | I-01-059 | NRC Proposes to Fine New Jersey Hospital $3,000 for Violations of NRC Requirements |
| 09/26/2001 | III-01-045 | NRC Staff Proposes $17,600 Fine Against Ohio Environmental Services Company for Violating Regulations |
| 09/25/2001 | 01-114 | NRC Approves Power Uprate for Beaver Valley Power Station in Pennsylvania |
| 09/24/2001 | I-01-058 | NRC to Discuss Emergency Preparedness Issues, Improvements Regarding Limerick and Peach Bottom Nuclear Power Plants |
| 09/24/2001 | 01-113 | NRC Advisory Committee on Reactor Safeguards to Meet October 4-6 in Rockville, Maryland |
| 09/21/2001 | 01-112 | NRC Reacts to Terrorist Attacks |
| 09/21/2001 | 01-111 | NRC Receives Application from TVA to Produce Tritium at Watts Bar Nuclear Power Plant in Tennessee |
| 09/20/2001 | II-01-039 | Atomic Safety and Licensing Board to Hold Prehearing Conference in North Augusta on September 21 on Proposed Fuel Facility |
| 09/20/2001 | I-01-057 | NRC Issues Finding of Substantial Importance to Safety to Calvert Cliffs Nuclear Power Plant |
| 09/20/2001 | 01-110 | NRC Prohibits a Former Radiation Safety Officer from Participating in NRC-Licensed Activity for Five Years |
| 09/19/2001 | III-01-044 | NRC Issues Finding of Low to Moderate Safety Significance on Fermi Nuclear Plant Violation |
| 09/14/2001 | I-01-056 | NRC Issues Finding of Low to Moderate Safety Significance to Susquehanna Nuclear Plan |
| 09/14/2001 | III-01-043 | NRC Staff Proposes $11,000 Fine for Radiation Overexposure Last Year at Southeast Missouri State University |
| 09/11/2001 | 01-109 | NRC Urges Increased Security |
| 09/07/2001 | II-01-038 | NRC to Hold Public Meetings on McGuire Nuclear Station License Renewal |
| 09/07/2001 | 01-108 | NRC Revises Regulations for a Possible Licensing Decision on a Potential Radioactive Waste Repository in Nevada |
| 09/05/2001 | II-01-037 | NRC Staff to Hold Public Meeting at Turkey Point to Discuss Inspection of Plant’s License Renewal Program |
| August | ||
| Date | Document Number | Description |
| 08/31/2001 | IV-01-047 | NRC Names Leonard M. Willoughby Resident Inspector at Ft. Calhoun |
| 08/31/2001 | 01-107 | NRC Announces Opportunity for Hearing on License Renewal for Pennsylvania's Peach Bottom Atomic Power Station |
| 08/30/2001 | I-01-055 | NRC Determines Inspection Finding for Oyster Creek Nuclear Plant to Be of Low to Moderate Safety Significance |
| 08/28/2001 | III-01-042 | NRC Cites Clinton Plant for Emergency Preparedness Violation of Low to Moderate Safety Significance |
| 08/27/2001 | 01-106 | NRC Staff Approves Transfer of Operating Licenses For Indian Point 1 and 2 to Entergy Corporation |
| 08/24/2001 | I-01-054 | NRC Proposes $8,800 Civil Penalty for Pittsburgh Medical Facility |
| 08/23/2001 | I-01-053 | NRC Cites Exelon Nuclear Generation Company for Violation of Low to Moderate Risk Significance at Peach Bottom |
| 08/23/2001 | II-01-036 | NRC to Hold Public Meetings on Surry Nuclear Station License Renewal |
| 08/23/2001 | 01-105 | NRC Advisory Committee on Reactor Safeguards to Meet September 5 - 8 in Rockville, Maryland |
| 08/22/2001 | IV-01-046 | Michael S. Peck Named Resident Inspector at Columbia Generating Station |
| 08/22/2001 | I-01-052 | NRC Issues Notices of Violations Following Investigation of Improper Efforts to Dispose of Waste from New Jersey Center |
| 08/20/2001 | II-01-035 | NRC Determines Farley Nuclear Plant Security Issue to Be of Low to Moderate Safety Significance |
| 08/17/2001 | 01-104 | NRC Invites Public to Submit Nominations for the Advisory Committee on Nuclear Waste |
| 08/16/2001 | IV-01-045 | NRC Plans Additional Inspection at Cooper Due to Failure to Correct Exercise Errors |
| 08/15/2001 | 01-103 | NRC Announces Opportunity for Hearing for License Renewal Applications for McGuire, Catawba Nuclear Power Plants |
| 08/13/2001 | 01-102 | NRC Advisory Committee on Nuclear Waste Elects Chairman and Vice Chairman |
| 08/13/2001 | II-01-034 | NRC Schedules Conference to Discuss Summer Nuclear Plant |
| 08/10/2001 | I-01-051 | NRC to Hold Public Meeting on Inspection Programs for Steam Generators at Salem Nuclear Plant |
| 08/10/2001 | 01-101 | NRC Advisory Committee on Nuclear Waste to Meet August 28 - 30 in Rockville, Maryland |
| 08/10/2001 | 01-100 | NRC Introduces New Version of ADAMS Based on Public Comment, Operational Experience |
| 08/09/2001 | 01-099 | NRC Comments on GAO Report on Indian Point 2 Emergency Preparedness |
| 08/08/2001 | 01-098 | NRC Seeks Public Comment on Proposed Rule Allowing Parts of Reactor Sites to Be Released for Unrestricted Use |
| 08/08/2001 | IV-01-044 | NRC Appoints Jeffrey Cruz Resident Inspector at Wolf Creek |
| 08/08/2001 | IV-01-043 | Richard W. Deese Named NRC Resident Inspector at Grand Gulf Nuclear Station |
| 08/08/2001 | I-01-050 | NRC Discrimination Task Group to Hold Meeting in Waterford, Conn. |
| 08/07/2001 | 01-097 | NRC Names Stephen L. Rosen to Advisory Committee on Reactor Safeguards |
| 08/03/2001 | 01-096 | NRC Asks for Information from Certain Nuclear Plant Licensees on Reactor Vessels |
| 08/02/2001 | IV-01-042 | NRC Discrimination Task Group to Hold Meeting in San Luis Obispo |
| 08/01/2001 | I-01-049 | NRC Assigns New Resident Inspector to Calvert Cliffs Nuclear Plant |
| July | ||
| Date | Document Number | Description |
| 07/31/2001 | IV-01-041 | Donald B. Allen Named NRC Senior Resident Inspector at Comanche Peak |
| 07/31/2001 | 01-095 | NRC Approves Power Uprate for Hope Creek Nuclear Power Plant in New Jersey |
| 07/31/2001 | 01-094 | NRC Licensing Support Network Advisory Review Panel to Meet August 8 in Las Vegas |
| 07/30/2001 | II-01-033 | NRC Holds Public Meetings at Global Nuclear Fuel Plant August 7 to Discuss Plant Performance and Revised NRC Oversight Program |
| 07/24/2001 | IV-01-040 | NRC Plans Additional Inspection at Callaway Nuclear Power Plant Due to Performance Deficiency |
| 07/24/2001 | III-01-041 | NRC Staff Proposes $3,000 Fine Against Midwest Testing, Inc. of Missouri for Failing to Control Licensed Material |
| 07/24/2001 | III-01-040 | NRC Names New Senior Resident Inspector at Quad Cities Nuclear Power Plant |
| 07/23/2001 | 01-093 | NRC Announces Opportunity for Hearing for License Renewal Applications for North Anna, Surry |
| 07/23/2001 | 01-092 | NRC Announces Availability of License Renewal Application for Peach Bottom Atomic Power Station |
| 07/23/2001 | 01-091 | NRC to Meet with Public on July 31 to Discuss Use of Risk Information in Regulating Nuclear Waste and Materials |
| 07/20/2001 | II-01-032 | NRC Plans Additional Inspection at Oconee Nuclear Power Plant Due to Multiple Performance Deficiencies |
| 07/19/2001 | 01-090 | NRC to Meet with Proposed Mixed Oxide Fuel Facility Applicant to Discuss NRC Requests for Additional Information |
| 07/16/2001 | IV-01-039 | NRC Monitors Ammonia Leak Near Waterford 3 Nuclear Plant |
| 07/16/2001 | 01-088 | NRC Approves Guidance Documents for License Renewal |
| 07/16/2001 | 01-087 | NRC Announces Availability of License Renewal Applications for Catawba, McGuire |
| 07/13/2001 | III-01-039 | NRC To Meet with Exelon Company to Discuss Safety Performance at the Quad Cities Nuclear Station |
| 07/13/2001 | I-01-048 | NRC to Meet with Dominion Nuclear Connecticut to Discuss Performance at Millstone Units 2 and 3 Nuclear Power Plants |
| 07/13/2001 | 01-086 | NRC Approves Power Uprate for Susquehanna Facility in Pennsylvania |
| 07/12/2001 | IV-01-038 | NRC to Meet with Ameren/UE To Discuss Safety Performance at Callaway Nuclear Station |
| 07/10/2001 | III-01-038 | NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Monticello Nuclear Power Plant |
| 07/09/2001 | 01-085 | NRC Schedules Public Workshop on Possible New Reactor Applications |
| 07/09/2001 | 01-084 | NRC Proposes Amending Skin Dose Limit for Workers at Nuclear Facilities |
| 07/09/2001 | II-01-031 | NRC to Meet with SCE&G Officials to Discuss Safety Performance at Summer Nuclear Power Plant |
| 07/09/2001 | II-01-030 | NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Vogtle Nuclear Power Plant |
| 07/09/2001 | II-01-029 | NRC to Meet with TVA Nuclear Officials to Discuss Safety Performance at Watts Bar Nuclear Power Plant |
| 07/06/2001 | III-01-037 | NRC to Meet with Exelon Generation Company to Discuss Safety Performance at the Clinton Nuclear Plant |
| 07/06/2001 | 01-083 | NRC Approves Power Uprate for San Onofre Nuclear Facility in California |
| 07/06/2001 | 01-082 | NRC to Begin One-Year Evaluation of a Revised Program to Assess Physical Security at Nuclear Power Plants |
| 07/06/2001 | 01-081 | NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on July 17 - 19 |
| 07/05/2001 | III-01-036 | NRC to Meet with Exelon Generation Co. to Discuss Safety Performance at the Braidwood Nuclear Power Plant |
| 07/05/2001 | III-01-035 | NRC to Meet with Exelon Generation Co. to Discuss Safety Performance at the Dresden Nuclear Plant |
| 07/05/2001 | III-01-034 | NRC to Meet with FirstEnergy Company to Discuss Safety Performance at the Perry Nuclear Plant |
| 07/05/2001 | III-01-033 | NRC to Meet with Exelon Generation Company to Discuss Safety Performance at the LaSalle Nuclear Plant |
| 07/05/2001 | I-01-047 | NRC to Meet with FirstEnergy Nuclear Operating Company to Discuss Performance at Beaver Valley Nuclear Power Plant |
| 07/05/2001 | I-01-046 | NRC to Meet with Entergy Nuclear Northeast To Discuss Performance at Indian Point 3 Nuclear Power Plant |
| 07/05/2001 | 01-080 | ACRS Subcommittees on Materials and Metallurgy and Plant Operations to Meet in Rockville, Maryland, on July 10 |
| 07/05/2001 | 01-079 | NRC Order Halts Shipment of Large Radioactive Sources by JL Shepherd & Associates |
| 07/03/2001 | III-01-032 | NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Kewaunee Nuclear Plant |
| 07/03/2001 | III-01-031 | NRC to Meet with FirstEnergy Company to Discuss Safety Performance at the Davis-Besse Nuclear Power Station |
| 07/03/2001 | III-01-030 | NRC to Meet with Exelon Nuclear to Discuss Safety Performance at the Byron Nuclear Power Plant |
| 07/03/2001 | I-01-045 | NRC Assigns New Sr. Resident Inspector to Seabrook Station |
| 07/03/2001 | 01-078 | NRC Extends Comment Period to September 6 for Turkey Point License Renewal Draft Environmental Impact Statement |
| 07/02/2001 | III-01-029 | NRC to Meet with Nuclear Management Company Officials to Discuss Safety Performance at the Point Beach Nuclear Plant |
| 07/02/2001 | III-01-028 | NRC to Meet with American Electric Power to Discuss Safety Performance at the D.C. Cook Nuclear Power Station |
| 07/02/2001 | I-01-044 | NRC to Meet with PSEG Nuclear to Discuss Performance at Salem and Hope Creek Nuclear Plants |
| 07/02/2001 | II-01-028 | NRC to Meet with FP&L Nuclear Officials to Discuss Safety Performance at Turkey Point Nuclear Power Plant |
| 07/02/2001 | II-01-027 | NRC to Meet with FP&L Nuclear Officials to Discuss Safety Performance at St. Lucie Nuclear Power Plant |
| 07/02/2001 | II-01-026 | NRC to Meet with TVA Nuclear Officials to Discuss Safety Performance at Sequoyah Nuclear Power Plant |
| 07/02/2001 | II-01-025 | NRC to Meet with Progress Energy/CP&L Officials to Discuss Safety Performance at Robinson Nuclear Power Plant |
| 07/02/2001 | II-01-024 | NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Farley Nuclear Power Plant |
| 07/02/2001 | II-01-023 | NRC to Meet with Duke Energy Officials to Discuss Safety Performance at McGuire Nuclear Power Plant |
| 07/02/2001 | II-01-022 | NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Catawba Nuclear Power Plant |
| June | ||
| Date | Document Number | Description |
| 06/29/2001 | III-01-027 | NRC Staff Proposes $55,000 Fine Against Michigan Nuclear Plant for Failure to Provide Complete and Accurate Information |
| 06/29/2001 | 01-077 | NRC Announces Availability of License Renewal Applications for North Anna, Surry |
| 06/27/2001 | I-01-043 | NRC Assigns New Sr. Resident Inspector to TMI Nuclear Plant |
| 06/27/2001 | 01-076 | NRC Seeks Members of Public to Join an ADAMS User Group to Enhance Communications with Agency |
| 06/27/2001 | 01-075 | NRC Seeks Comments on Preliminary Assessment of Nuclear Industry Consolidation on Agency's Regulatory Oversight |
| 06/25/2001 | IV-01-037 | NRC Monitoring Events at Cooper Nuclear Station |
| 06/25/2001 | III-01-026 | NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Duane Arnold Nuclear Plant |
| 06/25/2001 | I-01-042 | NRC to Meet with Vermont Yankee Nuclear Power Corporation to Discuss Performance at Vermont Yankee Nuclear Power Plant |
| 06/25/2001 | 01-074 | NRC Approves Transfer of Operating Licenses for Nine Mile Point Nuclear Plant |
| 06/22/2001 | IV-01-036 | NRC to Meet with Arizona Public Service to Discuss Safety Performance at Palo Verde |
| 06/22/2001 | III-01-025 | NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Prairie Island Nuclear Power Station |
| 06/21/2001 | 01-073 | NRC Renews License for Arkansas Nuclear One, Unit 1 for an Additional 20 Years |
| 06/21/2001 | II-01-021 | NRC Proposes $3,000 Fine Against Puerto Rico Company for Violation of Radioactive Material Safety Requirements |
| 06/20/2001 | I-01-041 | NRC to Meet with PPL Susquehanna to Discuss Performance at Susquehanna Nuclear Power Plant |
| 06/20/2001 | I-01-040 | NRC to Meet with Amergen Energy Company to Discuss Performance at Three Mile Island 1 Nuclear Power Plant |
| 06/20/2001 | I-01-039 | NRC to Meet with Exelon Generation Company to Discuss Performance at Limerick Nuclear Power Plant |
| 06/20/2001 | II-01-020 | NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Hatch Nuclear Power Plant |
| 06/20/2001 | II-01-019 | NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Oconee Nuclear Power Plant |
| 06/20/2001 | II-01-018 | NRC to Meet with Virginia Power Officials to Discuss Safety Performance at Surry Nuclear Power Plant |
| 06/20/2001 | II-01-017 | NRC to Meet with Progress Energy/CP&L Officials to Discuss Safety Performance at Harris Nuclear Power Plant |
| 06/20/2001 | II-01-016 | NRC to Meet with Virginia Power Officials to Discuss Safety Performance at North Anna Nuclear Power Plant |
| 06/20/2001 | II-01-015 | NRC to Meet with Progress Energy/CP&L Officials to Discuss Safety Performance at Brunswick Nuclear Power Plant |
| 06/19/2001 | IV-01-035 | NRC to Meet with Entergy to Discuss Safety Performance at Arkansas Nuclear One |
| 06/19/2001 | I-01-038 | NRC to Meet with Entergy Nuclear Generation Company to Discuss Performance at Pilgrim Nuclear Power Plant |
| 06/19/2001 | I-01-037 | NRC to Meet with Constellation Nuclear to Discuss Performance at Calvert Cliffs Nuclear Power Plant |
| 06/19/2001 | I-01-036 | NRC to Discuss Preliminary "White" Finding on TMI 1 Corrective Actions |
| 06/14/2001 | IV-01-034 | NRC to Meet with Entergy to Discuss Safety Performance at River Bend |
| 06/14/2001 | IV-01-033 | NRC to Meet with TXU Electric to Discuss Safety Performance at Comanche Peak |
| 06/14/2001 | IV-01-032 | NRC to Meet with Energy Northwest to Discuss Safety Performance at Columbia Generating Station |
| 06/14/2001 | IV-01-031 | NRC to Meet with OPPD to Discuss Safety Performance at Fort Calhoun Station |
| 06/14/2001 | IV-01-030 | NRC to Meet with Entergy to Discuss Safety Performance at Waterford 3 Nuclear Power Plant |
| 06/14/2001 | III-01-024 | NRC to Meet with Detroit Edison Company to Discuss Safety Performance at the Fermi 2 Nuclear Power Station |
| 06/14/2001 | I-01-035 | NRC to Meet with Amergen Energy Company to Discuss Performance at Oyster Creek Nuclear Power Plant |
| 06/14/2001 | I-01-034 | NRC to Meet with Rochester Gas & Electric Corporation to Discuss Performance at R.E. Ginna Nuclear Power Plant |
| 06/14/2001 | I-01-033 | NRC Assigns New Senior Resident Inspector to Salem Nuclear Plant |
| 06/14/2001 | I-01-032 | NRC Sr. Resident Inspector at Peach Bottom Receives Meritorious Service Award for Inspector Excellence |
| 06/14/2001 | II-01-014 | NRC Staff Seeks Input on Draft Turkey Point Environmental Impact Statement; Meetings Scheduled for July 17 |
| 06/13/2001 | IV-01-029 | Peter J. Alter Assigned NRC Senior Resident Inspector for River Bend Station |
| 06/13/2001 | I-01-031 | NRC to Meet with Niagara Mohawk Power Corporation to Discuss Performance at Nine Mile Point Nuclear Power Plants |
| 06/12/2001 | 01-072 | NRC to Hold Public Meetings on Discrimination Task Group Draft Report Recommendations |
| 06/12/2001 | 01-071 | NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on June 19 - 21 |
| 06/12/2001 | I-01-030 | NRC to Meet with Entergy Nuclear Northeast to Discuss Performance at FitzPatrick Nuclear Power Plant |
| 06/12/2001 | IV-01-028 | Clyde C. Osterholtz Named NRC Senior Resident Inspector at San Onofre Nuclear Generating Station |
| 06/08/2001 | 01-070 | NRC Amends Licensing, Inspection and Annual Fees Rule |
| 06/07/2001 | I-01-029 | NRC to Meet with North Atlantic Energy Service Corporation to Discuss Performance at Seabrook Nuclear Power Plant |
| 06/07/2001 | IV-01-027 | NRC to Meet with PG&E to Discuss Safety Performance at Diablo Canyon Nuclear Power Plant |
| 06/07/2001 | IV-01-026 | NRC to Meet with Entergy To Discuss Safety Performance at Grand Gulf Nuclear Power Plant |
| 06/06/2001 | 01-069 | NRC to Meet with Public on June 13 fo Discuss Use of Risk Information in Regulating Nuclear Waste and Materials |
| 06/06/2001 | I-01-028 | NRC to Meet with Consolidated Edison Company of New York to Discuss Safety Performance at Indian Point 2 Nuclear Plant |
| 06/06/2001 | III-01-022 | NRC Staff to Meet with University Officials on Apparent Violations at Southeast Missouri State University |
| 06/06/2001 | II-01-013 | NRC to Meet with TVA Officials to Discuss Safety Performance at Browns Ferry Nuclear Power Plant |
| 06/06/2001 | II-01-012 | NRC to Meet with Florida Power Officials to Discuss Safety Performance at Crystal River Nuclear Power Plant |
| 06/05/2001 | 01-068 | ACRS Subcommittee to Meet on Reactor Power Uprates on June 12 |
| 06/05/2001 | III-01-021 | NRC Names New Senior Resident Inspector at Byron Nuclear Power Plant |
| 06/05/2001 | I-01-027 | NRC to Meet with Exelon Generation Company to Discuss Performance at Peach Bottom Nuclear Power Plant |
| 06/05/2001 | IV-01-025 | NRC to Meet with SONGS To Discuss Safety Performance at Nuclear Power Plant |
| 06/01/2001 | 01-067 | NRC Issues Annual Assessments for All Nuclear Plants |
| 06/01/2001 | IV-01-024 | NRC to Meet with Wolf Creek to Discuss Safety Performance at Nuclear Power Plant |
| 06/01/2001 | IV-01-023 | NRC to Meet with South Texas Project to Discuss Safety Performance at STP Nuclear Power Plant |
| 06/01/2001 | III-01-020 | NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Palisades Nuclear Power Plant |
| May | ||
| Date | Document Number | Description |
| 05/31/2001 | II-01-011 | NRC Staff to Hold Public Meeting with FP&L June 8 to Discuss Initial Plant License Renewal Inspection at Turkey Point |
| 05/30/2001 | 01-066 | NRC Seeks Comments on Proposed Agenda for Annual Nuclear Safety Research Conference in October |
| 05/30/2001 | IV-01-022 | NRC to Meet with NPPD to Discuss Safety Performance at Cooper Nuclear Station |
| 05/29/2001 | 01-065 | NRC Seeks Comments on Proposed Changes to Material Control and Accounting Regulations |
| 05/25/2001 | 01-064 | NRC Sends Special Inspection Team to Westinghouse Fuel Fabrication Facility in Columbia, S.C. |
| 05/25/2001 | 01-063 | NRC Invites Public to Submit Nominations for the Advisory Committee on Reactor Safeguards |
| 05/25/2001 | 01-062 | NRC Seeks Public Comments on Draft of Discrimination Task Group Report |
| 05/25/2001 | 01-061 | ACRS Subcommittee on Reliability and Probabilistic Risk Assessment to Meet in Rockville, Maryland, on June 22 |
| 05/25/2001 | II-01-010 | NRC Staff to Hold Predecisional Enforcement Conference in Atlanta on June 6 with Turabo Corporation of Caguas, Puerto Rico |
| 05/23/2001 | 01-060 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, on June 6-8 |
| 05/22/2001 | IV-01-021 | NRC Proposes to Fine the Texas A&M University System $2,400 for Errors in Shipping Radioactive Material |
| 05/21/2001 | IV-01-020 | NRC Chairman to Hold News Briefing Following Visit to Arkansas Nuclear One |
| 05/16/2001 | 01-059 | NRC Schedules Meetings in Pahrump, Las Vegas to Explain Hearing Process for Considering Possible Waste Repository |
| 05/16/2001 | I-01-026 | NRC Dominion Nuclear to Discuss Millstone 2 Performance Issues |
| 05/15/2001 | IV-01-019 | NRC Fines Callaway $55,000 for Retaliation Against Security Personnel |
| 05/14/2001 | 01-058 | Advisory Panel Issues Report Assessing First Year of NRC's Reactor Oversight Process |
| 05/11/2001 | I-01-025 | NRC to Conduct Special Inspection at IP3 to Look into Loss of Spent Fuel Cooling |
| 05/10/2001 | 01-057 | NRC Schedules May 24 Meeting in Mesquite, Nevada, on Possible Yucca Mountain Waste Repository |
| 05/10/2001 | I-01-024 | NRC to Discuss Changes in Emergency Plans for Three Pa. Plant Sites |
| 05/10/2001 | III-01-019 | NRC to Hold Public Meetings in Illinois and Kentucky on May 16 and 17 to Discuss Plant Performance and Oversight Program Changes |
| 05/10/2001 | IV-01-018 | NRC Inspections Find ANO-1 Managing Aging Equipment Effectively |
| 05/10/2001 | IV-01-017 | NRC Finds No Environmental Impact from Extended Operation of ANO |
| 05/09/2001 | 01-056 | NRC's Office of Inspector General Schedules Conference May 21 |
| 05/09/2001 | I-01-023 | NRC Chairman To Hold News Briefing After Visit to N.Y. Nuclear Plants |
| 05/08/2001 | 01-055 | NRC Advisory Committee on Reactor Safeguards Revises May Meeting Agenda |
| 05/08/2001 | 01-054 | NRC Advisory Subcommittee on Advanced Reactors to Hold Workshop in Rockville, Maryland, on June 4-5 |
| 05/04/2001 | III-01-018 | NRC Staff to Meet with Consumers Energy on Apparent Violation at Palisades Nuclear Plant |
| 05/03/2001 | 01-053 | NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on May 15-17 |
| 05/02/2001 | 01-052 | NRC Names Dr. F. Peter Ford to the Advisory Committee on Reactor Safeguards |
| 05/02/2001 | IV-01-016 | NRC to Discuss Inspection Program with Radiography Industry at Public Forum in Lafayette |
| 05/01/2001 | 01-051 | NRC Seeks Public Comment on Proposed Rule on Decommissioning Trust Provisions and Draft Regulatory Guide |
| 05/01/2001 | III-01-017 | Kewaunee Nuclear Plant May 3 Regulatory Conference Postponed |
| April | ||
| Date | Document Number | Description |
| 04/30/2001 | 01-050 | NRC Makes Available Report on Direction of Nuclear Regulatory Research |
| 04/27/2001 | 01-049 | NRC to Meet with Public on May 8 in Rockville, Maryland, to Discuss Fuel Facility Oversight |
| 04/27/2001 | III-01-016 | NRC to Meet with Nuclear Management Co. May 3 to Discuss Inspection Finding at Kewaunee Nuclear Plant |
| 04/26/2001 | 01-048 | NRC Changes Regulations on Electronic Documents for Possible High-level Waste Repository Hearing |
| 04/24/2001 | 01-047 | Commissioner Dicus Honored by Texas Woman's University |
| 04/24/2001 | 01-046 | NRC Will Hold Public Meeting in Charlotte on Environmental Review for Proposed Mixed Oxide Fuel Facility |
| 04/24/2001 | 01-045 | NRC to Meet with Public on May 11 to Discuss Use of Risk Information in Regulating Nuclear Waste and Materials |
| 04/24/2001 | I-01-022 | NRC, Con Ed to Discuss Response to Team Inspection at Indian Point 2 |
| 04/21/2001 | I-01-021 | NRC Prehearing Conference Scheduled for Haddam Neck Nuclear Power Plant |
| 04/20/2001 | I-01-020 | NRC to Discuss Performance Indicator on Unplanned Power Changes at James A. FitzPatrick Nuclear Power Plant |
| 04/20/2001 | III-01-015 | NRC Approves Transfer of Operating Authority for Palisades Plant |
| 04/19/2001 | 01-044 | Chairman Meserve to Hold Press Conference |
| 04/19/2001 | 01-043 | NRC's Potassium Iodide Web Site Available |
| 04/19/2001 | III-01-014 | NRC Names New Resident Inspector at Paducah Gaseous Diffusion Plant |
| 04/19/2001 | III-01-013 | NRC to Meet with USEC Officials April 26 to Discuss Shutdown of Enrichment Operations at the Portsmouth Plant |
| 04/18/2001 | 01-042 | NRC Advisory Committee on Reactor Safeguard To Meet in Rockville, Maryland, May 10 - 12 |
| 04/18/2001 | 01-041 | NRC Announces Opportunity for Hearing on Proposed Mixed Oxide Fuel Facility |
| 04/16/2001 | I-01-019 | Millstone 1 Owner to Update NRC on Search for Missing Spent Fuel Rods |
| 04/10/2001 | I-01-018 | NRC Issues Report on Inspection Team's Findings for Indian Point 2 |
| 04/09/2001 | 01-040 | NRC 2002 Budget Request Available |
| 04/09/2001 | IV-01-015 | NRC Regional Administrator to Hold Press Conference at San Luis Obispo |
| 04/06/2001 | 01-039 | NRC Reassures Governor of California |
| 04/06/2001 | 01-038 | NRC Proposes Revising Rules Governing Conduct of Hearings |
| 04/06/2001 | III-01-012 | NRC Prohibits a Former Michigan Nuclear Medicine Technician from Participating in NRC-Licensed Activities |
| 04/03/2001 | IV-01-014 | NRC Staff Proposes $5,500 Fine for Bayou Inspection Services, Inc. |
| 04/02/2001 | 01-037 | ACRS Subcommittee on Reliability and Probabilistic Risk Assessment to Meet in Rockville, Maryland, on April 17 |
| 04/02/2001 | 01-036 | NRC Considers Construction Application, Announces Opportunity for Hearing on Proposed Mixed Oxide Fuel Facility |
| March | ||
| Date | Document Number | Description |
| 03/30/2001 | 01-035 | NRC Organizes Future Licensing Project Organization |
| 03/28/2001 | IV-01-013 | NRC Staff Proposes $5,500 Fine for Gulf Coast International Inspection, Inc. |
| 03/26/2001 | 01-034 | NRC to Hold Workshop April 4 on Public Participation Issues |
| 03/23/2001 | IV-01-012 | NRC, NPPD to Meet for Regulatory Conference on Potential Yellow Findings at Cooper Nuclear Station |
| 03/22/2001 | 01-033 | NRC Seeks Comment on Proposal to Amend Licensing, Inspection and Annual Fees |
| 03/21/2001 | 01-032 | NRC to Discuss Apparent Violations with Texas A&M University in Rockville, Maryland, on March 29 |
| 03/21/2001 | III-01-011 | NRC to Hold Public Meeting to Discuss Its Authorization of Uranium Enrichment Activities at Paducah, Kentucky, Plant |
| 03/19/2001 | 01-031 | NRC Authorizes USEC to Increase Uranium Enrichment at Paducah, Kentucky, Plant |
| 03/15/2001 | 01-030 | NRC Advisory Committee on the Medical Uses of Isotopes to Meet in Rockville, Maryland, on April 18 |
| 03/15/2001 | 01-029 | Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, on April 5 - 7 |
| 03/15/2001 | I-01-017 | NRC to Meet with New Jersey Company to Discuss Site Remediation Plans |
| 03/14/2001 | 01-028 | NRC Advisory Committee on Reactor Safeguards' Subcommittee on Reactor Fuels to Meet in Maryland on April 4 |
| 03/14/2001 | I-01-016 | NRC Special Inspection Team at Seabrook Station to Look into Last Week's "Unusual Event" |
| 03/14/2001 | IV-01-011 | NRC to Meet with SONGS Officials to Discuss Results of Special Inspection |
| 03/13/2001 | 01-027 | Public Invited to Open House in Las Vegas with Local NRC Representatives |
| 03/13/2001 | IV-01-010 | NRC to Meet with Public to Discuss Storage of Spent Nuclear Fuel at Diablo Canyon |
| 03/09/2001 | IV-01-009 | NRC Staff Proposes $5,500 Fine for Global X-Ray & Testing Corp. |
| 03/09/2001 | 01-026 | NRC Approves Transfer of Operating Licenses for Millstone Units 1, 2 and 3 |
| 03/09/2001 | 01-025 | NRC's ACRS Plant License Renewal Subcommittee Meets March 27, 28; Revises Agenda for March 16 Joint Subcommittee Meeting |
| 03/09/2001 | I-01-015 | NRC Reschedules Meeting with Washington, D.C. Hospital |
| 03/09/2001 | III-01-010 | NRC Staff Completes Review of Safety Significance of Issues at Kewaunee Nuclear Power Plant |
| 03/09/2001 | II-01-007 | NRC Staff to Hold Public Meeting March 16 at Plant Hatch to Discuss Inspection of Plant's License Renewal Program |
| 03/07/2001 | I-01-014 | Note to Editors: New Time for NRC Chairman's Press Briefing at Indian Point 2 |
| 03/06/2001 | 01-024 | NRC Announces Environmental Review, Public Meetings on Proposed Mixed Oxide Fuel Facility |
| 03/06/2001 | I-01-013 | Oral Hearing to Be Held March 13 on FitzPatrick/Indian Point 3 Petition |
| 03/06/2001 | IV-01-008 | NRC to Discuss Results of ANO Unit 1 License Renewal Inspection March 9 |
| 03/05/2001 | 01-023 | NRC Receives Construction Application for Proposed Mixed Oxide Fuel Fabrication Facility |
| 03/05/2001 | I-01-012 | NRC Postpones Meeting with Washington, D.C. Hospital |
| 03/02/2001 | 01-022 | NRC Names William F. Kane Deputy for Reactor Programs; Announces Related Management Changes |
| 03/02/2001 | I-01-011 | NRC Chairman to Hold News Briefing Following Visit to Indian Point 2 |
| 03/01/2001 | 01-021 | NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on March 21 - 23 |
| 03/01/2001 | III-01-009 | NRC Staff Completes Safety Review of Radiation Protection Planning at Quad Cities Nuclear Power Station |
| February | ||
| Date | Document Number | Description |
| 02/28/2001 | 01-020 | NRC Advisory Committee on Reactor Safeguards Subcommittees to Hold Meetings in Rockville, Maryland, on March 15 and 16 |
| 02/28/2001 | III-01-008 | NRC Staff Completes Safety Review of Design Issue at Prairie Island Nuclear Power Station |
| 02/27/2001 | I-01-010 | NRC to Discuss Apparent Violation at Washington, D.C., Hospital |
| 02/27/2001 | III-01-007 | NRC Staff Proposes $8,800 Fine Against St. Louis Medical Service for Deliberate Violation of Regulations |
| 02/26/2001 | 01-019 | NRC Issues Safety Evaluation Concluding Summer Plant Can Safely Resume Operation |
| 02/26/2001 | IV-01-007 | Tim Hoeg Named Senior Resident Inspector at Grand Gulf Nuclear Plant |
| 02/23/2001 | I-01-009 | NRC to Meet with PPL March 1 to Discuss Susquehanna Inspection Finding |
| 02/23/2001 | I-01-008 | NRC Schedules Two Meetings on IP2 on March 2 |
| 02/20/2001 | 01-018 | NRC to Hold Workshop March 26-28 on Initial Implementation of the Reactor Oversight Process |
| 02/20/2001 | 01-017 | NRC Approves License Termination Plan for Trojan Nuclear Power Plant |
| 02/20/2001 | I-01-007 | NRC to Discuss Apparent Violations with Toms River, N.J., Hospital |
| 02/16/2001 | 01-016 | NRC Directs CP&L Not to Store Spent Fuel in Additional Storage Pools Pending Further Order |
| 02/16/2001 | 01-015 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, March 1 - 3 |
| 02/15/2001 | IV-01-006 | NRC Chairman to Hold News Briefing Following Visit to Palo Verde |
| 02/15/2001 | III-01-006 | NRC Names New Resident Inspector at Point Beach Nuclear Power Plant |
| 02/15/2001 | IV-01-004 | NRC to Meet with Public to Discuss Storage of Spent Nuclear Fuel at San Onofre |
| 02/14/2001 | 01-014 | NRC to Hold Public Meeting on Nuclear Research In Washington, D.C., on February 21 |
| 02/14/2001 | I-01-006 | NRC to Discuss Apparent Violation with Washington, D.C., Hospital |
| 02/09/2001 | II-01-006 | NRC Special Inspection Team to Discuss Findings with Summer Plant Officials |
| 02/08/2001 | 01-013 | NRC Refines Process for Assessing Results of Security Exercises at Nuclear Power Plants |
| 02/07/2001 | III-01-005 | NRC to Meet with Exelon February 13 to Discuss Radiation Protection Findings at Quad Cities Nuclear Plant |
| 02/06/2001 | IV-01-005 | NRC Special Inspection Team Sent to SONGS |
| 02/05/2001 | I-01-005 | NRC to Discuss Apparent Violations with Pa. Civil Engineering Firm |
| 02/02/2001 | 01-012 | NRC's Advisory Committee on Reactor Safeguards Subcommittee on Thermal-Hydraulic Phenomena to Meet on Feb. 20 |
| 02/02/2001 | I-01-004 | NRC to Discuss Apparent Violations with Philadelphia Medical Facility |
| 02/01/2001 | 01-011 | NRC Schedules Workshop on Fuel Facility Oversight |
| January | ||
| Date | Document Number | Description |
| 01/31/2001 | 01-010 | Subcommittees of Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, on February 21 - 22 |
| 01/31/2001 | 01-009 | NRC Advisory Committee on Nuclear Waste Working Group, to Meet in Rockville, Maryland, on February 21 - 22 |
| 01/30/2001 | III-01-004 | NRC Names New Resident Inspector at Lasalle Nuclear Power Plant |
| 01/29/2001 | 01-008 | NRC Allows Reactor Licensees to Submit Documents Electronically |
| 01/25/2001 | 01-007 | NRC Staff to Hold Meeting on Former Atlas Mill Tailings Site in Moab, Utah |
| 01/25/2001 | 01-006 | NRC Advisory Committee on Reactor Safeguards Elects Chairman, Vice-Chairman and Member-at-Large |
| 01/24/2001 | III-01-003 | NRC Staff to Meet with Nuclear Management Co. Jan. 30 to Discuss Inspection Findings at Kewaunee Nuclear Plant |
| 01/17/2001 | 01-005 | NRC Report Rates Risk of Fire at Decommissioning Nuclear Power Plant Spent Fuel Pool as Low |
| 01/17/2001 | III-01-002 | NRC Staff to Discuss Portsmouth Gaseous Diffusion Plant Performance January 23 |
| 01/16/2001 | 01-004 | NRC to Hold Public Meeting on Nuclear Research in Maryland on January 24 - 25 |
| 01/16/2001 | I-01-003 | NRC Withdraws Civil Penalties Against Pennsylvania Man |
| 01/12/2001 | I-01-002 | NRC to Begin Inspection at IP2 |
| 01/11/2001 | II-01-005 | NRC Meeting to Discuss Harris Nuclear Plant Concerns with CP&L Rescheduled |
| 01/10/2001 | II-01-004 | NRC Staff to Meet with Law Engineering to Discuss Apparent Violations of NRC Requirements |
| 01/10/2001 | IV-01-001 | Note to Editors: Decision Issued on Calloway |
| 01/09/2001 | III-01-001 | NRC Names New Resident Inspector at Quad Cities Nuclear Power Plant |
| 01/08/2001 | II-01-003 | Prehearing Conference Scheduled on Turkey Point Nuclear Plant License Renewal |
| 01/08/2001 | 01-003 | NRC Amends Regulations to Add FuelSolutions Storage Cask Design to Approved List |
| 01/08/2001 | 01-001 | NRC Names Christopher Cahill Resident Inspector at the Hope Creek Nuclear Plant |
| 01/05/2001 | II-01-002 | NRC Staff to Discuss Harris Nuclear Plant Concerns with CP&L |
| 01/02/2001 | 01-002 | NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, February |
| 01/02/2001 | 01-001 | Joint Subcommittee to Meet January 19 in Rockville, Maryland |
| 01/02/2001 | II-01-001 | NRC Staff to Meet with Summer Plant Officials to Discuss Pipe Repair Prior to Plant Restart |
Page Last Reviewed/Updated Thursday, February 04, 2021