The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Change Notice 04-015

Issue Date: 05/25/04

All Files in ZIP Format cn 04-015.zip

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

  DELETED:
Number
Date TRANSMITTED:
Number
 
  Date
1. IMC 0609, App G 02/27/01 IMC 0609, App G 05/25/04
2.     IMC 0609, App G, Att 1 05/25/04
3.     IMC 0609, App G, Att 2 05/25/04
4.     IMC 0609, App G, Att 3 05/25/04
5.     IMC 0308, Att 3, App G 05/25/04

TRAINING:

IMC 0609, App G; IMC 0609, App G; Att 1, and IMC 0308, Att 3, App G - the Change Notice information will provide the inspectors the information needed for the format only change that was made.
IMC 0609, App G, Att 2 and IMC 0609, App G, Att 3 - training was completed by workshops conducted for the SRAs.

REMARKS:

IMC 0609, App G (Shutdown Operations Significance Determination Process) is revised to move the Phase 1 operational checklists that were previously in the main body of Appendix G and place it in a new manual chapter document. This new document is Attachment 1 to Appendix G. This separation was done to make Appendix G consistent with other SDP appendices in the manual chapter. The main body of Appendix G was changed to provide a "road map" of how to navigate through the various attachments to Appendix G. Attachments 2 and 3, which provide SDP Phase 2 guidance for PWRs and BWRs, respectively, are referenced in the revised Appendix G.

IMC 0609, App G, Att 1 (Shutdown Operations Significance Determination Process Phase 1 Operational Checklists for Both PWRs and BWRs) is added to include the PWR and BWR operational checklists used for Phase 1 of the SDP that were previously in the main body of Appendix G. No technical changes were made to the checklists. Creating a separate document was done to be consistent with the existing format of other manual chapters.

IMC 0609, App G, Att 2 (Phase 2 Significance Determination Process Template for PWR During Shutdown) is added for SDP Phase 2 evaluation of PWR shutdown findings. Attachment 2 is a separate document from the Appendix G Phase 1 guidance and is to be used exclusively by Senior Reactor Analysts (SRAs) or other risk analysts. The guidance contains a number of tables and figures, including various generic event trees that are used to assign a change in risk for shutdown operations. In the event a Phase 3 assessment is needed, the finding is sent to NRR via the regional SRA for further review.

IMC 0609, App G, Att 3 (Phase 2 Significance Determination Process Template for BWR During Shutdown) is added for SDP Phase 2 evaluation of BWR shutdown findings. Attachment 3 is a separate document from the Appendix G Phase 1 guidance and is to be used exclusively by Senior Reactor Analysts (SRAs) or other risk analysts. The guidance contains a number of tables and figures, including various generic event trees that are used to assign a change in risk for shutdown operations. In the event a Phase 3 assessment is needed, the finding is sent to NRR via the regional SRA for further review.

IMC 0308, Att 3, App G (Technical Basis for Shutdown Operations Significance Determination Process) is added to provide the supporting technical "basis" for IMC 0609, App G.