Change Notice 04-009

Issue Date: 04/29/04

All Files in ZIP Format cn 04-009.zip

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

  DELETED:
Number
Date TRANSMITTED:
Number
 
  Date
1. ------- ------- TI 2515/156, Rev 00 04/29/04

TRAINING: A training teleconference (video call) was conducted to discuss TI implementation.
REMARKS:

TI 2515/156, Rev 00 (Offsite Power System Operational Readiness) is issued to confirm, through inspections and interviews, the operational readiness of offsite power (OSP) systems in accordance with NRC requirements prescribed in Appendix A to 10 CFR Part 50, General Design Criterion (GDC) 17; Criterion XVI of Appendix B to10 CFR Part 50; Plant Technical Specifications for offsite power systems; 10 CFR 50.63; and 10 CFR 50.65 (a)(4).

DISTRIBUTION: Standard

END

Page Last Reviewed/Updated Thursday, July 02, 2015