The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Change Notice 03-033

Issue Date: 09/09/03

NRC INSPECTION MANUAL IIPB



All Files in ZIP Format cn 03-033.zip

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

DELETED:
Number
Date TRANSMITTED:
Number
  Date
1. IMC 2515, App D 07/10/03 IMC 2515, App D 09/09/03
2. IP 71111.08 07/07/03 IP 71111.08 09/09/03
3. 9900 Tech Guidance SG Tube Leakage 10/11/01 9900 Tech Guidance SG Tube Leakage 09/09/03

TRAINING: No special training requirements have been identified for any documents issued with this change notice.
REMARKS:

IMC 2515, Appendix D (Plant Status) has been revised to provide improved guidance to an inspector on the requirement to inform the Materials and Chemical Engineering Branch, NRR, of steam generator tube leaks of greater than 3 gallons per day.

IP 71111.08 (Inservice Inspection Activities) has been revised to add guidance on steam generator tube primary-to-secondary leakage. This guidance used to be contained in Part 9900.

9900 Technical Guidance-Mechanical (Steam Generator Tube Primary-To-Secondary Leakage) has been revised to remove inspector actions for leakage greater than 3 gallons per day. The inspector actions have been moved to IP 71111.08, Inservice Inspection Activities. Section 9900 is only for inspector guidance.

DISTRIBUTION: Standard


END