Change Notice 03-015

Issue Date: 5/06/03


 

 

All Files in ZIP Format cn 03-015.zip
 

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

 
 
DELETED:
Number

Date
TRANSMITTED:
Number
 
 

Date
1. IP 71111 12/11/00 IP 71111 05/06/03
2. ---- ---- IP 71111.DS 05/06/03
3. ---- ---- IP 71111.EP 05/06/03
4. ---- ---- IP 71111.HS 05/06/03
5. ---- ---- IP 71111.ST 05/06/03


 
TRAINING:

No special training requirements have been identified for any documents issued with this change notice.

REMARKS:

IP 71111 (Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity) has been revised to include pilot program procedure attachments developed to consolidate baseline inspection procedures. This pilot program will be implemented at two power reactor sites in each region for a period of one year.

IP 71111.DS (Safety System Design and Performance Capability) is issued as part of a pilot program identified in IP 71111 above.

IP 71111.EP (Equipment Availability, and Functional Capability) is issued as part of a pilot program identified in IP 71111 above.

IP 71111.HS (Heat Sink Performance) is issued as part of a pilot program identified in IP 71111 above.

IP 71111.ST (Post-Maintenance and Surveillance Testing) is issued as part of a pilot program identified in IP 71111 above.

DISTRIBUTION: Standard

END

Page Last Reviewed/Updated Thursday, April 09, 2020