Change Notice 03-010
Issue Date: 3/21/03
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
|
DELETED:
Number
|
Date
|
TRANSMITTED:
Number
|
|
|
Date
|
1. |
IMC 0609 |
04/30/02 |
IMC 0609 |
03/21/03 |
2. |
IMC 0609.01 |
04/30/02 |
IMC 0609.01 |
03/21/03 |
TRAINING: |
No special training requirements have been identified for any documents issued with this change notice.
|
REMARKS: |
IMC 0609 "Significance Determination Process"
IMC 0609.01 "Significance and Enforcement Review Process"
Two major revisions that were made to these two documents are:
- The option of issuing a preliminary significance determination as greater than green;
- The 90-day goal for SDP timeliness was revised to reflect that the 90-day period begins when the inspection report that describes the finding is issued.
Since numerous other minor changes were made, no redlining has been used.
|
DISTRIBUTION: |
Standard |
END