The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Change Notice 03-010

Issue Date: 3/21/03


 

 

All Files in ZIP Format cn 03-010.zip
 

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

 
 
DELETED:
Number

Date
TRANSMITTED:
Number
 
 

Date
1. IMC 0609 04/30/02 IMC 0609 03/21/03
2. IMC 0609.01 04/30/02 IMC 0609.01 03/21/03


 
TRAINING:

No special training requirements have been identified for any documents issued with this change notice.

REMARKS:

IMC 0609 "Significance Determination Process"
IMC 0609.01 "Significance and Enforcement Review Process"

Two major revisions that were made to these two documents are:

  1. The option of issuing a preliminary significance determination as greater than green;
  2. The 90-day goal for SDP timeliness was revised to reflect that the 90-day period begins when the inspection report that describes the finding is issued.

Since numerous other minor changes were made, no redlining has been used.

DISTRIBUTION: Standard

END