Change Notice 01-009
Issue Date: 03/23/01
NRC INSPECTION MANUAL IIPB
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| DELETED: | | TRANSMITTED: | |
| Number | Date | Number | Date |
1. | IMC 0305 | 04/24/00 | IMC 0305 | 03/23/01 |
2. | IMC 0609, App E | 02/27/01 | IMC 0609, App E | 03/23/01 |
3. | IP 71111.05 | 09/22/00 | IP 71111.05 | 03/23/01 |
TRAINING: | No special training requirements have been identified for any documents issued with this change notice. |
REMARKS: | IMC 0305 (Operating Reactor Assessment Program) has been revised to incorporate a variety of verbal and written comments which: 1) adds responsibilities for headquarters offices during end-of-cycle review, 2) added a requirement that the EDO is responsible for authorizing all deviations, 3) clarified requirements for issuance of assessment followup letters, 4) modified description of mid-cycle and end-of-cycle reviews, 5) added exhibit 8, "Sample Plant Performance Summary," 6) added a description of end-of-cycle summary meetings, 7) updated sample mid-cycle and end-of-cycle letters, and 8) changed the note on Action Matrix. IMC 0609, Appendix E (Interim Physical Protection Significance Determination Process) has been revised to delete a paragraph describing enforcement guidance from the significance determination process description. The flow chart was revised to correct a typo by changing the word "green" to "white" in the first line of the chart. IP 71111.05 (Fire Protection) has been revised to remove the requirement to perform a 10 CFR 50.59 review for changes/modifications to the fire protection program, including fire protection aspects of structures systems and components. Those changes/modifications are reviewed under the provisions of 10 CFR 50.48. |
DISTRIBUTION: | Standard |
END
Page Last Reviewed/Updated Thursday, July 02, 2015