Change Notice 99-003
Issue Date: 03/09/1999
NRC INSPECTION MANUAL IIPB
All Files in ZIP Format | cn 99-003.zip |
DELETED: | TRANSMITTED: | |||
---|---|---|---|---|
Number | Date | Number | Date | |
1. | IMC 2515 | 09/28/98 | IMC 2515 | 03/09/99 |
2. | IP 57050 | 06/20/83 | IP 57050 | 03/09/99 |
3. | IP 57060 | 06/20/83 | IP 57060 | 03/09/99 |
4. | IP 57070 | 06/20/83 | IP 57070 | 03/09/99 |
5. | IP 57080 | 06/20/83 | IP 57080 | 03/09/99 |
TRAINING: | No special training requirements have been identified for any documents issued with this change notice. | |
REMARKS: | IMC 2515 | (Reactor Inspection Program - Operations Phase) has been revised to redefine the backshift coverage policy. This change was prompted by the adoption of a flexible work schedule by many licensees. The manual chapter was also revised to reflect the suspension of SALP, which occurred September 15, 1998. |
IP 57050 | (Visual Testing Examination) | |
IP 57060 | (Liquid Penetrant Testing Examination) | |
IP 57070 | (Magnetic Particle Testing Examination) | |
IP 57080 | (Ultrasonic Testing Examination) | |
These inspection procedures have been revised as part of the triennial review process for inspection program documents. As a result of this review the documents have been revised to change the emphasis from new plant construction to inservice inspection in addition to a general update of content and references. | ||
DISTRIBUTION: | Standard |
END
Page Last Reviewed/Updated Monday, August 05, 2024
Page Last Reviewed/Updated Monday, August 05, 2024