Change Notice 99-003
Issue Date: 03/09/1999
NRC INSPECTION MANUAL IIPB
|
DELETED: |
|
TRANSMITTED: |
|
|
Number |
Date |
Number |
Date |
1. |
IMC 2515 |
09/28/98 |
IMC 2515 |
03/09/99 |
2. |
IP 57050 |
06/20/83 |
IP 57050 |
03/09/99 |
3. |
IP 57060 |
06/20/83 |
IP 57060 |
03/09/99 |
4. |
IP 57070 |
06/20/83 |
IP 57070 |
03/09/99 |
5. |
IP 57080 |
06/20/83 |
IP 57080 |
03/09/99 |
TRAINING: |
No special training requirements have been identified for any documents issued with this change notice. |
|
REMARKS: |
IMC 2515 |
(Reactor Inspection Program - Operations Phase) has been revised to redefine the backshift coverage policy. This change was prompted by the adoption of a flexible work schedule by many licensees. The manual chapter was also revised to reflect the suspension of SALP, which occurred September 15, 1998. |
IP 57050 |
(Visual Testing Examination) |
IP 57060 |
(Liquid Penetrant Testing Examination) |
IP 57070 |
(Magnetic Particle Testing Examination) |
IP 57080 |
(Ultrasonic Testing Examination) |
|
These inspection procedures have been revised as part of the triennial review process for inspection program documents. As a result of this review the documents have been revised to change the emphasis from new plant construction to inservice inspection in addition to a general update of content and references. |
|
|
DISTRIBUTION: |
Standard |
END
Page Last Reviewed/Updated Monday, August 05, 2024