Power Reactor Status Report for June 23, 2025

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 Hot Weather Alert
Beaver Valley 2 99 Steam Generator Limitations;
Hot Weather Alert
Calvert Cliffs 1 100
Hot Weather Alert
Calvert Cliffs 2 100
Hot Weather Alert
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100

Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 Hot Weather Alert; Maximum Generation Alert

*
Susquehanna 2 100 Hot Weather Alert; Maximum Generation Alert
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Conservative Operations
*
Browns Ferry 2 100
Conservative Operations
*
Browns Ferry 3 100
Conservative Operations
*
Brunswick 1 100

Brunswick 2 100

Catawba 1 100
Hot Weather Alert
*
Catawba 2 100
Hot Weather Alert
*
Farley 1 100
Farley 2 2
Increasing Power from Startup
*
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100 Conservative Operations
*
McGuire 2 100 Conservative Operations
*
North Anna 1 100
Hot Weather Alert
North Anna 2 100
Hot Weather Alert
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100 Conservative Operations
Sequoyah 2 98 Increasing Power;
Conservative Operations
*
Summer 100
Surry 1 100
Hot Weather Alert; Maximum Generation Alert

*
Surry 2 100
Hot Weather Alert; Maximum Generation Alert
*
Turkey Point 3 100
Turkey Point 4 0 6/22/2025 Forced Outage; EN # 57773
*
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 100
Watts Bar 1 100 Hot Weather Alert
Watts Bar 2 100 Hot Weather Alert

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100 Hot Weather Alert; Conservative Operations
*
Braidwood 2 100 Hot Weather Alert; Conservative Operations
*
Byron 1 100 Hot Weather Alert; Conservative Operations *
Byron 2 100 Hot Weather Alert; Conservative Operations *
Clinton 100 Hot Weather Alert; Conservative Operations
*
D.C. Cook 1 100 Hot Weather Alert
D.C. Cook 2 100 Hot Weather Alert
Davis-Besse 100 Hot Weather Alert; Maximum Generation Alert
*
Dresden 2 100 Hot Weather Alert; Maximum Generation Alert
*
Dresden 3 100 Hot Weather Alert; Maximum Generation Alert
*
Fermi 2 100 Hot Weather Alert
LaSalle 1 100 Hot Weather Alert
LaSalle 2 100 Hot Weather Alert
Monticello 100 Hot Weather Alert; Conservative Operations
*
Perry 1 88 Hot Weather Alert; Reduced Power Due to Environmental Conditions
*
Point Beach 1 100 Hot Weather Alert; Conservative Operations
*
Point Beach 2 100 Hot Weather Alert; Conservative Operations
*
Prairie Island 1 100 Hot Weather Alert; Conservative Operations *
Prairie Island 2 100 Hot Weather Alert; Conservative Operations *
Quad Cities 1 100 Hot Weather Alert; Maximum Generation Alert
*
Quad Cities 2 100 Hot Weather Alert; Maximum Generation Alert
*

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Conservative Operations
Arkansas Nuclear 2 100 Conservative Operations
Callaway 0 3/29/2025 Refueling Outage
Columbia Generating Station 16 Reduced Power for Main Turbine Maintenance
*
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100 Hot Weather Alert
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100 Conservative Operations
*
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100 Conservative Operations
South Texas 1 100
South Texas 2 100
Waterford 3 91 Transformer Limitation
*
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, July 21, 2025