The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 16, 2025

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 99 Steam Generator Limitations
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100

Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 85 Coastdown to Refueling Outage
Millstone 2 100
Millstone 3 0 4/11/2025 Refueling Outage
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 0 4/13/2025 Refueling Outage
*
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 3/24/2025 Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 67
Increasing Power
*
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100

Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 3/16/2025 Refueling Outage
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 4/2/2025 Refueling Outage
*
McGuire 2 100
North Anna 1 100
North Anna 2 100

Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 59 Increasing Power
*
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 7/31/2024 Extended Outage
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100

Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 70 Holding Power for Fuel Efficiency
Watts Bar 1 0 1/17/2025 Forced Outage
Watts Bar 2 0 4/12/2025 Refueling Outage

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 0 4/14/2025
Refueling Outage
*
Clinton 99
100% Electrical Capability
D.C. Cook 1 0 3/22/2025 Refueling Outage *
D.C. Cook 2 100
Davis-Besse 100

Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 95 Coastdown to Refueling Outage
Perry 1 0 3/17/2025
Refueling Outage
Point Beach 1 100
Point Beach 2 100

Prairie Island 1 40
Reduced Power for Maintenance
*
Prairie Island 2 100
Quad Cities 1 87

Reduced Power for Economic Dispatch
*
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100

Callaway 0 3/29/2025
Refueling Outage
Columbia Generating Station 0 4/12/2025 Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 0 4/13/2025 Refueling Outage
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 0 3/28/2025
Refueling Outage
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 97 Limited by Core Flow *
South Texas 1 100
South Texas 2 100
Waterford 3 94 Transformer Limitation
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Wednesday, May 14, 2025