Power Reactor Status Report for April 12, 2025

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 99 Steam Generator Limitations
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 72 Reduced Power for Maintenance
*
Ginna 100
Hope Creek 1 100
Limerick 1 72 Reduced Power for Rod Pattern Adjustment
*
Limerick 2 87 Coastdown to Refueling Outage
Millstone 2 100
Millstone 3 0 4/11/2025 Refueling Outage
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 73 Coastdown to Refueling Outage
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 3/24/2025 Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 17 Holding Power
*
Browns Ferry 3 100
Brunswick 1 60 Reduced Power for Rod Pattern Adjustment
*
Brunswick 2 100

Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 3/16/2025 Refueling Outage
*
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 4/2/2025 Refueling Outage
*
McGuire 2 100
North Anna 1 100
North Anna 2 100

Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 7/31/2024 Extended Outage
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100

Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 70 Holding Power for Fuel Efficiency
Watts Bar 1 0 1/17/2025 Forced Outage
Watts Bar 2 0 4/12/2025 Refueling Outage
*

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 77 Coastdown to Refueling Outage
*
Clinton 100

D.C. Cook 1 0 3/22/2025 Refueling Outage
D.C. Cook 2 100
Davis-Besse 100

Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 95 Coastdown to Refueling Outage
*
Perry 1 0 3/17/2025 Refueling Outage
Point Beach 1 67
Increasing Power
*
Point Beach 2 100

Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100

Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100

Callaway 0 3/29/2025
Refueling Outage
Columbia Generating Station 0 4/12/2025
Refueling Outage
*
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 99

Coastdown to Refueling Outage
*
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 0 3/28/2025
Refueling Outage
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 5 Increasing Power
*
South Texas 1 100
South Texas 2 100
Waterford 3 94 Transformer Limitation
Wolf Creek 1 100 *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, May 12, 2025