The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 19, 2025

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 Cold Weather Alert; Conservative Operations
Beaver Valley 2 100 Cold Weather Alert; Conservative Operations;
Calvert Cliffs 1 100 Conservative Operations
Calvert Cliffs 2 99 Conservative Operations;
Coastdown to Refueling Outage
*
FitzPatrick 100
Ginna 100
Hope Creek 1 100 Cold Weather Alert
Limerick 1 100
Limerick 2 100 *
Millstone 2 100
Millstone 3 100


Nine Mile Point 1 85 Reduced Power Limit due to Fuel Defect
*
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 200 MVAR Minimum Output Restriction
Susquehanna 2 96 Coastdown to Refueling Outage
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 85 Coastdown to Refueling Outage
Browns Ferry 3 0 2/9/2025 See EN 57537;
Forced Outage
Brunswick 1 100
Brunswick 2 83 Coastdown to Refueling Outage
*
Catawba 1 100
Catawba 2 100
Farley 1 100 Conservative Operations
*
Farley 2 100 Conservative Operations
*
Harris 1 100
Hatch 1 100 Conservative Operations
*
Hatch 2 0 2/9/2025 Refueling Outage;
McGuire 1 100
McGuire 2 100
North Anna 1 100 Cold Weather Alert
*
North Anna 2 100 Cold Weather Alert
*
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 7/31/2024 Extended Outage
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 Cold Weather Alert
Vogtle 2 100 Cold Weather Alert
Vogtle 3 100 Cold Weather Alert
Vogtle 4 100 Cold Weather Alert
Watts Bar 1 0 1/17/2025 Forced Outage
Watts Bar 2 100 Conservative Operations
*

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100 Conservative Operations; Cold Weather Alert
Braidwood 2 100 Conservative Operations; Cold Weather Alert
Byron 1 100 Cold Weather Alert
Byron 2 100 Cold Weather Alert
Clinton 99 Cold Weather Alert; 100% Electrical Capability
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100 Cold Weather Alert
Dresden 2 100 Cold Weather Alert
Dresden 3 100 Cold Weather Alert
Fermi 2 100 Cold Weather Alert
LaSalle 1 100 Cold Weather Alert; Conservative Operations; Cold Weather Advisory
LaSalle 2 0 2/10/2025 Refueling Outage; Cold Weather Alert; Conservative Operations; Cold Weather Advisory
Monticello 100
Perry 1 100 Cold Weather Alert
Point Beach 1 100
Point Beach 2 100

Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 84 Coastdown to Refueling Outage; Cold Weather Alert
Quad Cities 2 100 Cold Weather Alert

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 99 Coastdown to Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100

Diablo Canyon 2 100
Grand Gulf 1 0 2/16/2025 Forced Outage; See EN 57551
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 0 2/11/2025 Refueling Outage
South Texas 1 100
South Texas 2 100
Waterford 3 94 Transformer Limitation
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.